Proposals for Water Resources Development Act of 2026: Administration Priorities

Tuesday, February 24, 2026

Summary

  • Adam Telle (Assistant Secretary, United States Army (Civil Works)) unveiled Building Infrastructure, Not Paperwork with 27 initiatives to transform civil works delivery.

  • Telle said the Corps holds $45 billion in appropriated but unexecuted funds, including $15 billion over six years old, requiring fundamental cultural change.

  • Rep. Larsen asked Telle about using Harbor Maintenance Trust Fund receipts for inland waterways and Telle declined to state administration policy.

  • Rep. Collins said projects must finish on-time, on-budget without dredging delays while Rep. Scholten and Rep. Larsen said WRDA 2024 implementation was slow and Rep. Scholten said funding was cut.

  • Lieutenant General William Graham (Chief of Engineers and Commanding General, United States Army Corps of Engineers) projected seven to thirteen more chief's reports by May for WRDA 2026.

Search with clips

Free. Enter your email and it downloads right away.


Hearing Details

Witnesses

Members Who Spoke

View on Congress.gov

Transcript

3:24 – 7:30

The subcommittee on Water Resources and Environment will come to order. I ask unanimous consent that the chairman be authorized to declare a recess at any time during today's hearing without objection, so ordered. I also ask unanimous consent that members not on the subcommittee be permitted to sit with the subcommittee at today's hearing and ask questions without objection, so ordered. Uh, as a reminder, if members wish to insert a document into the record, please also email it to documents TI at mail dot house dot gov. I now recognize myself for the purposes of an opening statement for five minutes. I'd like to thank Assistant Secretary Till and Lieutenant General Graham for joining us today as we discussed the administration's priorities for the Water Resource Development Act of twenty twenty-six. The uh biennial water bill is the primary way that Congress guides the Corps' projects and priorities. It is important for the committee to hear directly from the Corps leaders at the beginning of the water process. Uh, by authorizing projects and studies and providing direction on the programmatic changes, Water Bill's improved the ability of the Corps to achieve its civil works missions of navigation, flood control, and ecosystem restoration. Water of twenty twenty-six will be the seventh water built since the committee returned to the biennial structure in two thousand fourteen. A dependable two-year water cycle provides the Corps and its finan- and its non-federal sponsors an opportunity to keep critical water infrastructure projects moving forward and respond to local water resource needs more effectively. An efficient response to the evolving water resource needs across the country is vital for our security safety, and economic stability. Our nation's ports and inland waterways move essential goods, support local economies, and provide the marine infrastructure that contributes over five hundred billion to the nation's GDP. A consistent water process helps to improve and maintain our ports and waterways to meet growing needs. As I proudly shared last fall in my home state of Georgia, the Port of Savannah achieved its second busiest year ever since i- in twenty twenty-five, serving nearly seventeen hundred container ships and handling around fifteen thousand truck load moves daily. This growth and success are supported by a consistent and reliable water process. I was happy to hear that dredging is finally underway at the Port of Brunswick's inner and outer harbor. Uh, but it's been several years since this vital port received routine maintenance dredging. Similar routine dredging projects across the country are burdened by undue regulatory process and environmental window that seems to prevent the consistent maintenance of federal channels. I look forward to hearing from today's witnesses to get a better understanding of how we can prevent such delays. In addition to our nation's ports, the inland waterways are critical arteries for transportation and commerce. Since becoming chairman of this subcommittee, I have been able to visit several of the Corps' projects across the country, including the Wilson and Chickamauga Locks in Alabama and Tennessee. These critical assets that serve our nation's economic and national security are in need of rehabilitation. The necessary maintenance for these projects is taking too long and costing taxpayers too much. In Congress, we have a responsibility to be good stewards of taxpayer money, and the Corps must be do better to complete projects on time and on budget. I look forward to hearing about ways this can be done from our panel this morning. With that, I want to welcome Assistant Secretary Telle and Lieutenant General Graham here today to discuss the priorities of Water Twenty twenty six. I now recognize Ranking Member Shilton for five minutes for an opening statement.

7:30 – 11:32

Thank you, Chair Collins, and welcome to our witnesses. Thank you, uh, for your commitment to working with the committee as we develop what I hope will be a bipartisan, robust, Water Resources Development Act of twenty twenty six. At a time when the affordability crisis is affecting every corner of our country, and our communities are navigating the threats of climate change, it is incumbent on Congress to prioritize keeping water resource projects affordable and resilient. Back home in West Michigan, water is a way of life, and our waterways are critical to our regional economies and culture. A strong WERTA is absolutely essential for Congress to meet our local community's economic and environmental needs. Passing WERTA twenty twenty six is a first step towards granting the Army Corps' authority that they need to carry out water resource projects and studies however we need the funding to back up our action. It was devastating to see the President's fiscal year twenty twenty-six budget request proposed a nearly twenty-five percent slash to the Corps' budget. Fortunately, Congress rejected this funding cut, but we still need to meaningfully address the Corps' backlog of word-of-project and maintenance needs, which is currently estimated to be over a hundred billion, with a B, dollars. The Trump administration has also been less than diligent about the law regarding harbor maintenance trust funds, um, and those investments. Our ports are critical to our local economies as well as our national supply chains. Time is not on our side here. The longer we wait, the more expensive these projects will become, and our ports will start to fall behind. Failing to meaningfully invest and port and harbor maintenance and upgrades will threaten job growth, reliable supply chains, and global competitiveness. We also need full cooperation from our core partners to navigate the inherently collaborative effort of the new WERDA. That's why it's so frustrating that the administration has decided that the Corps needs the Department of Defense approval before district offices can share project details and updates with congressional offices. We don't need this kind of bureaucratic obstacle. We cannot allow partnerships and bureaucracy to undercut this process, and I encourage the administration to reverse this policy so Congress can best serve the American people. I need to warn you gentlemen, as we look ahead to WERTA twenty twenty-six, this subcommittee will be keeping the pressure on you two, our core leaders, to promptly and effectively implement previous WERTA policies. Effectively and promptly. The pace of implementation is going to be key. When we were passing WERTA twenty twenty four, we heard nonstop about the glacial pace of implementation under the previous administration but this administration, this administration is even slower. What happened to the pressure for the pace on implementation? We have yet to see guidance on dozens of critical provisions, such as to reduce cost share for communities in need, to utilize new continuing authority programs, to address dredging needs in smaller communities, and to maximize opportunity for water supply and conservation where possible. It's unacceptable. the Corps must implement the law and hold up its end of the bargain to best safeguard our water resources. I sincerely hope that our conversation today will include ideas and solutions on what the Corps needs to execute past WERDAs, as well as how we can work together to continue to deliver for Americans across the nation through this year's legislation. Thank you again for your time. I look forward to the conversation. I yield back.

11:33 – 11:39

I now recognize the Ranking Member of the full committee, Mister Larson, for five minutes for an opening statement.

11:39 – 15:13

Thank you, Chair Collins and uh Vice Ranking Member um Skulden for holding the hearing and welcome back Assistant Secretary Telle and Lieutenant General Graham. Uh thank you for being here this morning. Since two thousand fourteen this committee has honored its commitment to meet local water resource needs across the country through bipartisan and biennial enactment of the Water Resources Development Act. Predictable WORDAs support core projects while creating good-paying jobs in the construction industry and supporting countless more jobs in the US industries and businesses that benefit directly from these projects. Regular enactment of WORDAs also provides critical policy reforms that improve the function and flexibility of the core to respond to local challenges. Failure to implement ORTA on time results in delays and denies critical economic, environmental, and societal benefits to communities across the country. Each presidential administration wants to put its own mark on the management of federal agencies, and based on your ideas for reducing paperwork at the core, we are starting to understand your priorities. However, no administration gets to ignore the law and to manage federal agencies as they please untethered from the legal obligations that Congress mandates. For example, as of yesterday, this administration has formally implemented only three provisions from the Water Resource Development Act of twenty twenty-four, enacted in January twenty twenty-five. Three. This means that bipartisan benefits that an overwhelming majority of Republican and Democratic members of the House and Senate enacted are not reaching their communities. Failure to implement WERTA twenty twenty-four denies the country the benefits of the twenty-one chiefs' reports that it authorized. Benefits such as upgraded navigation, flood risk reduction, and storm protection projects, as well as ecological restoration and the societal benefits associated with these projects. Failure to implement WERTA twenty-four means that small, rural, and tribal and other communities will continue to struggle to meet local challenges as these projects remain unaffordable. Failure to implement order twenty-four increases the vulnerability of America's navigational capacity, both through its coastal and inland ports, as well as the vulnerability of communities to the challenges of climate change and dr- and drought. This administration needs to do better. At today's hearing, I expect to hear you recognize Congress as an essential partner in directing and scoping how the Corps implements its missions. I also expect to hear that you will work diligently to make sure that every enacted provision of existing WORDA's is fully implemented in a timely fashion, and that you'll provide the committee with periodic updates on your on the on your progress. This committee recently closed its member portal that contains roughly twenty-four hundred project, policy, and environmental infrastructure requests for the upcoming WORDA for twenty-six. Based on member requests, my top-line priorities forward at twenty-six will be ensuring that we authorize the next generation of local water resource projects and studies, ensure that all communities, including rural, small, and tribal communities can affordably partner with the Corps to resolve local challenges, and ensuring that all Corps projects are designed to meet the challenges of climate change and make communities more resilient to stronger storms, rising sea levels, and severe droughts. I look forward to today's testimony and my continued partnership with the chair of the full committee, chair of this subcommittee, and the ranking member, vice-ranking member to develop a bill in our traditional bipartisan fashion. I yield back.

15:17 – 16:19

I would now like to welcome our witnesses and uh thank them for being here today. Uh briefly, I know I don't need to, but I'm gonna take a moment just to explain our lighting system. There're three lights in front of you. Green uh means to continue, yellow means you're running out of time, and when it turns red, please conclude your remarks. I ask unanimous consent that the witnesses' full statements be included in the record. Without objection, so ordered. I ask unanimous consent that the record of today's hearing remain open until such time as our witnesses have provided answers to any questions that may be submitted to them in writing. Without objection, so ordered. I also ask unanimous consent that the record remain open for fifteen days for any additional comments and information submitted by members or witnesses to be included in the record of today's hearing. Without objection, so ordered. As your written testimony has been made part of the record, the subcommittee asks that you limit your oral remarks to five minutes. With that, Mister Telle, you are recognized for five minutes for your testimony.

16:21 – 21:09
Assistant Secretary, United States Army (Civil Works)

Thank you, Chairman Collins. Uh, Chairman Collins, Ranking Member Larson, Ranking Member Scholten, and distinguished members of the committee, thank you for the opportunity to be here today to discuss the development of the proposed Water Resources Development Act of twenty twenty six. Uh, before I get started, I wanna recognize uh the passing of Congressman Doug LaMalfa, uh who was an outstanding member of this committee, uh someone who was a passionate advocate for California's water issues, and someone who taught me, as I'm sure he did many members of this committee. uh all about California water, uh and so we miss him. Uh I'm eager to share with you my perspective after six months as the Assistant Secretary of the Army for Civil Works including what the Corps of Engineers is doing well and where significant reform is warranted. I hope my perspective is valuable to you as you develop proposals for WERTA twenty twenty six. I also wish to share an update on the implementation of past WERTAs, which was just raised. It remains a topic of critical uh interest to members of this committee. Since my last appearance before this committee, the Army Civil Works program has finalized implementation guidance for the remaining provisions of WERTA twenty twenty and WERTA twenty twenty two, with the exception of provisions modified further by WERTA twenty twenty four. WERTA is the law. Uh, we're following it. The last three WERTAs included five hundred and fifty-two provisions, and we are developing guidance for the remaining nineteen of those provisions. I just signed implementation guidance for two of them yesterday. Uh. we're gonna we're gonna make sure they're consistently implemented through this guidance. I remain committed to completing the implementation guidance as soon as practical and look forward to working with this committee to identify opportunities to improve the process for implementing future wordas. One thing I've observed to this point is that the Army Corps of Engineers is at its very best when it's responding to emergencies, where it is unburdened by red tape and enters what we like to call " army mode". Specific specific examples of that come to mind, including the Corps' execution of assignments to clear and remove debris after Hurricane Helene, throughout Appalachia, uh, inclu- particularly in western North Carolina and after the two thousand twenty-five Los Angeles wildfires. Last August, the Corps successfully implemented state and local efforts in anticipation of glacial outburst flooding in Juneau, Alaska. And finally, just last month, the Corps executed assignments assignments in response to winter storm firm across the southeastern United States and we're currently responding to the disaster in the Potomac River. But when it comes to our primary missions, our everyday missions, for decades the Army civil works program hasn't really had a plan. The status quo has been to execute everything all at once, moving each project down the yellow brick road of red tape one inch at a time, resulting in inexplicable delays, including to projects that are of strategic national importance. Meanwhile, reaching paperwork milestones is elevated as evidence of achievement. This is simply unacceptable for an agency that is so important to the safety and prosperity of the American people. Stacks of important government paperwork have never saved an American life or community except perhaps in very cold weather when no other fuel is available. We have to change the way the Army civil works program conducts its business or the next decades will be more of the same. The stars are aligned under President Trump's leadership to change this now. We have in hand forty-five billion dollars that the Congress has previously appropriated to our programs but the Corps has not yet executed. Shockingly, fifteen billion dollars of this funding is more than six years old. We also have many ongoing projects that the Congress has authorized and that the Corps is building but that require significant additional funding to complete. The status quo approach is insufficient, meaning we will never deliver on what you expect of us without fundamentally changing our behavior. To meet this challenge yesterday, we unveiled a plan that we call " Building Infrastructure, Not Paperwork." It's a plan that was partially inspired by members of this committee and particularly the chairman of this subcommittee. Uh, it's in- comprised of approximately twenty-seven individual, but complimentary initiatives to start, to reimagine and rejuvenate the Army civil works program with your sup- uh, and with your support, this will be the most significant transformation of the program since at least nineteen eighty-six. Through this suite of strategic initiatives, it is my goal to harmonize the Army civil works program and to realign and right-size the incentive structures of the Corps of Engineers, with an emphasis again on building infrastructure and not paperwork. This new plan is driven by a sense of urgency. Our strategy is centered on a fundamental cultural transformation to enhance our effectiveness and restore discipline. We are sharpening our focus on our primary missions under a strategic plan that will deliver on the mandate you've given us. To accelerate project delivery, we're implementing smarter contracting practices, upholding higher design standards, and reforming our partnership pipeline to build what America needs faster and more cost-effectively. A key component to this transformation is overhauling our internal processes, but as President Trump has directed and as bipartisan members of this committee have directed, cutting bureaucratic red tape by reforming our entire regulatory permitting system is important to provide fast, clear, and consistent decisions to the public. I see I'm running out of time, so I'll submit the remainder of my statement uh for the record, but I look forward to your questions. Thank you.

21:10 – 21:15

Thank you. Uh, next, General Graham, you are recognized for five minutes for your testimony.

21:18 – 24:13
Chief of Engineers and Commanding General, United States Army Corps of Engineers

Chairman Collins, Vice Ranking Member Skelton, Ranking Member Larson, I'm honored to testify before you today in regard to the twenty twenty-six Water Resource Development Act. Through the Civil Works program, the Army Corps works with our partners to study, build and operate water resource projects focusing on our three main mission areas of commercial navigation, flood and coastal storm damage reduction, and aquatic ecosystem restoration. Breaking those down. navigation program, which consists our coastal, great lakes, channels, as well as the inland rivers and intercoastal waterways, underpins much of the national economy, ensuring that communi- commodities can remove reliably and efficiently. Our flood and coastal storm damage reduction program maintains seven hundred and forty-six dams over thirteen thousand miles of federal levees and four hundred and fifty miles of shore protection that provide on average two hundred billion dollars. per year, and flood damages avoided. To continuously maintain and improve these mission areas, I want to thank this subcommittee for supporting the core civil works program. Your commitment, as we heard from the Chair, since twenty fourteen to pass biannual water resource development acts has provided us with the authorities necessary to address the changing needs of the nation's water resources infrastructure. We deeply value the authorities you've entrusted to us, our pledges to put them to work to deliver for the American people. To that end, the Army Corps' objective each and every day is to safely and efficiently deliver quality studies and projects on schedule, within budget. Our current on-schedule rate, as I measured it this morning, for the civil works portfolio is eighty-six percent. That's an improvement from the eighty percent that I reported to this subcommittee back in September. So, by focusing on the basics of getting the engineering right, of getting the project management right, and of getting the project delivery team right, we're making our cost estimates more reliable and our project delivery more efficiently. That said, there's more work to do, more improvements to make. To that end, we're very excited about the building infrastructure, not paperwork initiative that Mister Telle outlined. These improvements, delivered by district engineers who are empowered to manage risk, not avoid it, will allow the Army Corps to make the changes necessary to best deliver our important infrastructure mission for the nation. Finally, I too would also like to take a moment to express our deepest condolences to the family friends and colleagues of Congressman Lamolph of California. We will do our best to honor his passion, his absolute passion for the federal water resources mission by continuing our efforts to optimally balance our flood risk management responsibilities with growing water supply needs. Thank you for the opportunity to testify before you today, and I look forward to addressing your questions.

24:20 – 25:10

Thank you. Um, I ask unanimous consent to enter into the record a statement from the Steel Manufacturers Association dated February twenty fourth, twenty twenty six, uh without objection so ordered. I want to thank you both for your testimony. We will now turn to questions from the panel, and I will recognize myself for five minutes for questions. Um. Assistant Secretary Telle, when you were here last uh and last September, uh you stated that you supported the idea of delegating some authorities to improve efficiency in the Corps' process especially when it comes to the recreation mission of the Corps. Uh, does the Corps have the authority in the law to do this now? And uh, if anything, what do you need from Congress to carry this out?

25:12 – 25:42
Assistant Secretary, United States Army (Civil Works)

Chairman Collins, thank you for the question. Absolutely, the Corps has the authority to do this now. It's something that we should be taking advantage of. As an update on recreation, um, we're in a good spot in terms of hiring our organic employees for the coming s- uh spring and summer seasons. Uh, one hundred and eighty-eight uh individuals on board, which is fifty-nine percent of our goal. We've gotten after it early. Uh, but delegation of these authority delegation of these, uh, missions can be a critical way to expand our throughput and ensure we don't have uh future mishaps.

25:42 – 25:55

Yeah, w- do you don't you think it would also help uh with some of the internal uh l- the things that you're looking at internally to help improve efficiency and productivity, and focus on what the core really needs to be focused on?

25:55 – 26:51

Chairman Collins, you're absolutely right. Uh, this committee has given us authorities, I think about section two O three, section two O four, section ten forty three. Uh, this committee has spoken loud and clear that uh the Corps ought to take advantage of capable non-federal partners. Um, and if you think about uh the backlog uh that was mentioned earlier, the the the projects we've been authorized to perform that we're not performing, um, we need to expand our throughput. We have a limited amount of throughput. We need to reserve, uh, Corps of Engineers engineering excellence for the largest challenges that confront our country. Uh, we need to take advantage of the capabilities of our non-federal sponsors to expand the number of people in our country that are getting after all of these challenges that you all address You have given us the authorities to do that. Unfortunately, to date, in my view, we have not taken full advantage of them. There has been a cultural challenge related to districts wanting to hold onto works work for themselves. And in my view, we gotta get everybody in the business of building America's infrastructure and reducing paperwork.

26:51 – 27:01

Right. And I think uh in in so doing that it also is gonna speed up the uh the the time that the project is gonna take and it it and it also helps save money.

27:01 – 27:16

Mister Chairman, you're absolutely right. Um, I've seen instances at projects across our country where the price we're paying for dredging for instance, maybe uh forty, fifty or sixty percent higher than the price that one of our ports might be paying for that dredging.

27:16 – 27:16

Right.

27:16 – 27:30

And so, as often as we can delegate uh our responsibilities with oversight, of course, to meet the standards that this committee has put forth, uh we can expand our capability and often get a better price and better schedule, um, by utilizing our non-federal sponsors.

27:31 – 27:50

Right, and and with having said that, General Graham, section eighty-one thirty-three of water twenty twenty-two established the Inland Waterways Regional Dredge Pilot Program to award contracts to, uh, up to five years, uh, for these dredging projects. Can you speak about the cost effectiveness, uh, the reliability, and the performance of this program?

27:50 – 27:50

Yeah.

27:53 – 28:24
Chief of Engineers and Commanding General, United States Army Corps of Engineers

Chairman Collins, I can thank you for that question absolutely. By looking regionally, we can get, well, put simply a much better deal. And we also provide much more flexibility on when and where we dredge. Under secretary Tell's guidance, we're looking to expand that beyond just a regional look, to take advantage of all of the dredging that the Corps does. We are the largest buyer of dredging services in the nation, and we ought to use that market power to get the best deal possible for the American taxpayers.

28:24 – 28:53

Yeah. Yeah, you know, I always have to say a customer's king. So, I mean, I think if you look at it from that that angle, then you have the upper hand and and can negotiate not just maybe one dredging project but multiple dredging projects and let your dredging organization or the company that gets it let them set their schedule. as long as it falls within our guide guidelines. So, all right. Um, do you consider multi-year contracting as a as an effective way to reduce these dredging costs?

28:54 – 29:08

Jeremy Collins, absolutely. And and as w- as we discussed earlier, by looking nationwide, putting in um broad multi-year contracts, we believe we'll be able to get the best deal for for the American taxpayers.

29:09 – 29:25

Yeah, you know, I know when we were talking uh not too long ago about just the fact of how much it costs to actually When you have to move a dredge off of a project and and they could have been moving towards another project, but then you've gotta pay them to move to that project. So you're actually saving a lot of money and uh Sec- Undersecretary I don't know if you wanna join.

29:26 – 30:01
Assistant Secretary, United States Army (Civil Works)

Uh, Chairman Collins, you're right, uh, in addition to expanding our scope nationally, where we are a better negotiator across the negotiating table from private industry who are our partners, there's a challenge we have related to some of the environmental restrictions that o- often haven't been even re-examined in decades. Uh, I like to equate it to your spouse asking you to run uh ten errands on a Saturday But requiring uh you to go to those, the d- the post office, uh the Walmart, the Home Depot, and an- and - and to soccer practice in a specific order all across town, you can't do it in the most efficient way to execute your mission.

30:00 – 30:00

Yeah.

30:01 – 30:10

And that's how we're doing dredging today. We're sending our dredgers here and there based on these environmental schedules. If we can uh reduce that burden on them, we can get a much more efficient product for the taxpayer.

30:11 – 30:23

That's right. And - and a lot of times we'll make them come back home and then go to the next and then come back home. and it just it's not very efficient. I know I'm out of town with that with that uh I now yield uh five minutes to uh Miss Galton.

30:27 – 32:13

I think you you could get a uh a working mom to work that schedule for you uh uh, Mister Telle, we'll we'll give you a we'll give you a schedule for those errands on on a Saturday. I joke, I joke. Uh Uh, Assistant Secretary, the last time you testified before the subcommittee, uh, I discussed how Grand Haven and her harbor almost missed a dredging cycle, uh, which would have threatened the harbor's four hundred and fifty jobs and carried eighty-eight million in an annual economic impact. After months of advocacy, local, state, federal levels finally start to compromise to dredge about ninety percent of the harbor to ensure that ships could move through the channel without light loading. Um, however, the remainder of the harbor, that ten percent, even though it's smaller, is is critical, essential, right? If you can't get through that ten percent, uh, we're we're we can't get through it all. Um, the state needs to conduct sediment testing to determine if the area has been contaminated by PFAS. On February fifth, twenty twenty six, I sent a letter, uh, to the state as well as the Corps to understand the extent of which The two are working together already to engage in advanced planning to address the dredging of this potentially contaminated water. Um, I received a thorough, timely response from the State of Michigan, but have not received clarity from the Corps yet. Uh, one of my top priorities for WERTA twenty twenty six is boosting collaboration and advanced planning between state and federal leaders so that we can get to, uh, this this quicker pace of these projects rolling out, right? Efficiency and effectiveness is is what it's all about. Um, so can you first commit to sending a written response, uh, to my, uh, February fifth inquiry? And and additionally, can you speak to how critical it is for the Corps to work with its state partners to to ensure timeliness here?

32:16 – 32:56

Uh, Representative Scholten, thank you for the question. Uh, you're you're hitting on something that is absolutely true in Michigan. It's true across the country. Uh, dredging is the lifeblood of our economy. It's the hidden part of our economy that most Americans don't fully appreciate. Um, it is the arteries of it dredging and our ports, our waterways are the arteries of competition and our the arteries of our success. Everywhere that we can do this, we need to be doing it. Um, I will commit to get you a written response to your letter. in every program that we take on, we have non-federal partners, state, local, sometimes regional, uh, that we must work closely with in every stage. Uh, and I will pitch it to General Graham to see if he has an update, uh, on this particular project that you've outlined.

32:57 – 32:57

Thank you, Mr. Dahl.

32:59 – 33:38
Chief of Engineers and Commanding General, United States Army Corps of Engineers

Uh, Vice-Ranking Members, Golden, thank you, thank you again for that question. We certainly understand the importance of, um, the Grand Haven harbor to the economy. I I think our collaboration with the state of Michigan on testing ha- for PFAS contamination is going pretty well. You know, they kind of worked through some of the challenges. If it's primarily sand, there's less likelihood that there's gonna be PFAS contamination on it. It really only sticks to the fine silts, so they're working to characterize um the um the sediment in the outer and inner harbor. And so right now, our our understanding is is that uh the deep draft shifts can get to all the commercial um docks.

33:38 – 33:38

Currently.

33:38 – 33:49

And right now, we do understand that um a task order to do the next round of contracting was issued in March of this year.

33:49 – 33:49

Mm-hmm.

33:50 – 34:15

And that'll do a lot of the outer harbor um Dredging. We are looking for a follow-on contract that we'll put in place this spring and summer. If the testing that's ongoing, um, shows that that middle section by Harbor Island isn't contaminated with PFAS to the Michigan standards, then we'll try to make sure that we're in a position to go ahead and dredge that later this year.

34:16 – 35:24

Thank you. I appreciate that thorough response. Still do request a a written response, but we we appreciate the update very much. Um, and look forward to continuing conversations about how, you know, federal and state can continue to collaborate for advanced planning. Um, I have about a minute, and I wanna touch on data centers here really quickly. Uh, a huge hot topic all around the country, but especially back home in Michigan. Um, and constituents throughout my district are rightfully concerned about how these projects are gonna impact the state's water. I believe that we can strike the right balance between investing in our digital economy and creating good jobs without harming our natural resources or putting big data profits over our communities. But smart policy decisions start with good information. The Army Corps plays a really important role in water management, and I want to make sure that we can leverage the agency's expertise to understand how these data centers are impacting our precious water resources. Um, so back to you Assistant Secretary Telle, can you touch on how the agency is is thinking, if at all, about how data centers are affecting the use and amount of water maintained by the Corps?

35:26 – 36:21
Assistant Secretary, United States Army (Civil Works)

Uh, Madam Ranking Member, data centers, as you say, are a developing part of our economy and critical to our competition. our ability to compete. Um, in terms of the specific ways we look at it, we are not, when it comes to water supply, which is not one of our primary missions, but it's certainly something we consider as we are updating water control manuals. We would not specifically look at one facility's water use. We would look at the whole system's water use as we analyze um, uh analyze these items. When it comes to our permitting, um, we have updated our nationwide permits, which should be, which are complete. um the renewal of our nationwide permits to include data centers although data centers don't have any particular uh unique uh impact on waters of the united states uh in terms of our regulatory mission that uh other facilities do but it is important to understand that data centers are uh modern facilities that are that do require permits under the clean water act of nineteen seventy two

36:23 – 36:29

thank you um some follow-ups there but i'll yield back my time and uh we'll we'll keep going but i appreciate the answer

36:30 – 36:33

Now recognize uh Spabbin for five minutes.

36:34 – 38:22

Thank you, Mr. Chairman. Uh, good morning. And I wanna thank uh both of you gentlemen for being here today. I represent the thirty-sixth district of Texas, a home to uh Port of Houston, lots of ports other other than that. Waterways, uh refineries, petrochemical uh facilities, uh And we're no strangers to natural disasters. So, I wanna thank you all for your commitment to protecting and improving our nation's uh infrastructure there and water s- uh uh water resources. Uh, I also wanna take a moment to recognize uh Assistant Secretary Telle. Mr. Secretary, I wanna thank you for your leadership and for working uh with your team and Army Corps headquarters to help expedite uh non-federal-led studies. your engagement. Uh, in fact, both of you, you're both uh your engagement with stakeholders in Southeast Texas, including Cedarport is very much appreciated and makes a real difference on the ground. Uh, Cedarport plays a vital role in supporting jobs and commerce, economic growth in our district, and we value the strong partnership between the core and local stakeholders that uh, who are working hard moving these projects forward. I also want to thank you for your engagement in Buffalo BIO and Tributaries Resilience Study uh as well. Uh they they were devastated by Hurricane Harvey and we're counting on meaningful flood protection. So uh looking forward to continue working with you. Uh my first question is uh Mister Till uh you've announced a Build Infrastructure Not Paperwork initiative. First off, I wanna thank you for that. That ought to be across the federal age of all the federal government. Same thing. So what specific regulatory steps are you eliminating or streamlining to shorten project timelines?

38:24 – 39:13

Congressman Babin, thank you for the question and and thank you for to your district for welcoming me when I was there recently. Uh, one of the ways that I think about it, and it particularly applies to coastal Texas is, uh, we have not had a culture of prioritization. And I just wanna point this out. We haven't really had a plan. If you ask uh a district commander at any of our thirty-nine civil works districts, hey what what what are the top priorities in your district, it's not a question that they've often been asked. Um and I think that we uh you know the taxpayers are invested in in these leaders uh uh uh uh in their in their ability to lead and command and have military judgment. Uh I think we ought to be listening to our district commanders and I think about uh your district and areas around it that are so critical to our projection of energy dominance. Uh the American economy depends on in many ways on uh coastal Texas,

39:11 – 39:11

Yeah.

39:13 – 40:12

coastal Louisiana, and elsewhere. But it's also very vulnerable, as you said, to a hurricane like Hurricane Harvey or a hurricane with a storm surge. Uh this is the the it's critically important that we analyze our assets as a nation in terms of their importance. I can't think of a place off the top of my head that's more critical to our national security than your district and the areas around it. And so this is the type of thinking we need to empower our commanders to answer your question. We need to we need to empower our commanders to to determine what is their priority, and then hold them accountable from year to year about how they're cutting red tape and delivering on those projects, whether it's funding, but more importantly, process and effort. uh, rather than expecting them to inch every project down the field one inch at a time, and then have to re-study them after ten years of studying, we need to identify which projects within, when the, within the districts, within the divisions and at headquarters are, uh, on the basis of the military judgment of our commanders, most important to the nation. And that is a very fundamental and simple way that I believe we can cut through many of the much of the red tape that we face.

40:13 – 40:25

That's wonderful. So what changes are you making to ensure feasibility studies in construction phases? would be able to move faster without compromising safety or environmental standards.

40:26 – 40:33

Congressman, it's a great question, and and I'll ask General Graham to add to what I'm about to say, but one of the primary efforts,

40:30 – 40:30

Yeah.

40:33 – 41:11

I talked about prioritization across the nation, but I there's also an effort to priorit prioritize within projects. Um, quite often we study a very large swath, a very large area, and we study it, we try to boil the ocean with studies for decades rather than uh when we id- early in an early early phase identify a feature or uh an initiative that could start delivering for the American public now. So we've implemented a new process called RAPID, uh which is designed to make these early decisions, get features that could be authorized and funded by Congress to the Hill as quickly as we can so that rather than study the universe uh for decades, we're able to start building things now.

41:12 – 41:13

Absolutely. And General Graham?

41:13 – 41:24
Chief of Engineers and Commanding General, United States Army Corps of Engineers

I just wanna em- add emphasis to Mister Telle's point of the sooner we get the decision makers the district engineer involved at their earliest stages, the better our outcomes are going to be.

41:23 – 41:23

Right.

41:24 – 41:41

Like Mister Telle spoke to, we can study a whole bunch of various options, but there are decisions we can readily make at the beginning of a study, to window that down to just what the leading um options are, the leading alternatives are, and then we should focus on that, and that'll give us a faster product, more efficiently delivered.

41:42 – 41:49

Absolutely. Thank you. I'm looking forward to continuing our collaboration uh for water projects in the future. I yield back, Mr. Chairman. Thank you.

41:49 – 41:52

The chair now recognizes uh Mr. Lawson for five minutes.

41:53 – 42:18

Thank you. Uh, Mr. Taylor, uh, in July of twenty-five, the Corps estimated that there would be twelve chiefs' reports completed for word of twenty-six. And today Congress has received two of those reports. One of them happens to be the training basin in Columbia River between Washington and Oregon. Uh, what additional chiefs' reports should we expect in time for incorporation into Order twenty-six?

42:18 – 42:23
Assistant Secretary, United States Army (Civil Works)

Uh, Ranking Member Larson, thank you for the question, I will defer that uh question to the chief.

42:22 – 42:23

Right, Je- General Granger.

42:23 – 42:24

Uh, there are his reports.

42:26 – 42:51
Chief of Engineers and Commanding General, United States Army Corps of Engineers

Ranking Member Larson, I'm tracking somewhere between seven and thirteen additional chief's reports or director's reports. that we'll try to get in. Talked to the staff this morning, we know that the end of May is usually the hard deadline, but we're not gonna go pencils down. We're gonna keep working on these um additional director's reports and chief's reports um throughout the summer, but to your staff, we absolutely wanna get these in as soon as possible.

42:51 – 42:57

So, when you get them on your desk, how long is it at their t- how long is the turn around?

42:57 – 43:14

So I'll sign those usually immediately. To the earlier question, we want the all of the quarter's leadership to be taking a look at these projects earlier. So the time the chief's report gets to my desk, I've seen it, General Kelly's seen it, Mister Telle is certainly well aware of it, and that will speed this whole process up.

43:14 – 43:49

Okay. Uh, thanks. Um, uh, Assistant uh Secretary Telle, several ports have expressed concern to me that administration the administration is gonna propose using harbor maintenance trust fund receipts to construct or maintain projects on the inland waterway system uh that is a tremendously bad idea um i'd break the commitment we've made to shippers these funds would be dedicated to maintenance of coastal harbors since that's where this money largely comes from does the administration support using harbor maintenance trust fund receipts for inland waterways projects

43:51 – 44:08
Assistant Secretary, United States Army (Civil Works)

Uh, Renknepper, Larson, uh, I c- I I'm not gonna speak for the administration's policy on this topic. I don't know the answer to it, but what I what I will say is that this is not what you've described is not part of the building infrastructure not paperwork uh initiative that we put out yesterday. Um, and and so I'd I I can't speak any further.

44:07 – 44:34

Well, I it it wouldn't it wouldn't it wouldn't be cuz it it's i- it's a different s- it's a different set of things but I just wanna be sure that you understand um that if if that is going to be a budget proposal or the proposal from the administration by using harbor maintenance trust fund receipts for inland waterways uh when the dollars for those for that fund uh is produced by the coastal harbors there there's gonna be a problem

44:36 – 44:36

Thank you, sir.

44:36 – 45:09

Uh, secretary, uh, thanks for, you know, briefing me, um, on your upcoming proposal on on the BIMP. Uh, one of my priorities is that core projects be affordable to communities of all sizes, and your proposal, you discussed expanding core authorities to allow non-federal sponsors to take on design and construction of projects and seek a repayment for the federal share, after the fact. Um, how would that expanded use of alternate delivery method benefit smaller, rural, tribal communities that can't afford to advance these funds, and then to wait for reimbursement. Have you thought through that?

45:09 – 45:48

Reggie member Larson, you raise a great a great point here, and I'd the way that we see it is that if we use the authorities that you provided to us to expand the overall capacity of our nation to deliver on infrastructure, it will reserve US- the U- U- US Army Corps of Engineers' excellence for national projects that are national in scale or projects for communities that don't have those uh capabilities the ones you described but we do have non-federal sponsors that do have that those capabilities and so to the degree that we can uh help let them help shoulder the workload burden it's gonna make it better for everyone because it will reserve uh general graham's team's expertise for communities like the ones you described

45:48 – 46:47

yeah um and we've had uh in the pacific northwest i've worked on projects using um core two O six authorities uh on a on a very successful uh creek restoration um fairly fairly small project compared to much larger projects. And so there are different sizes of projects uh that the corps has authority to act on, as well as uh different um abilities that these uh jurisdictions have to participate um with that corps. Um so finally uh Word of twenty-four formally expanded the target time-line for study development to four years and five million dollars. Uh, non-federal sponsors are concerned the court continues to scale down projects conform to the three year the three and three. Uh, when your staff briefed the committee on your potential reforms, it continued to cling to the three and three uh goal, um, despite the fact that we changed that. So can you explain the difference here, the disconnect?

46:48 – 47:44

Sure, Rankin, member Larson, the the law obviously provides us with uh four years and a five million dollar limit to complete a feasibility study. That replaces a law that gave us three years and and a three million dollar limit. Um, my view is that the tool that you gave us in terms of putting this box around how s- how soon and how cost effectively we need to complete feasibility studies, is a great tool for discipline, to impose discipline on the system, to help produce uh, an answer for you to your point about chief rep- chief's reports, rather than studying these things forever. And so I'm not gonna b- Although the law gives me the ability to waive, uh, the four by five by three requirement, I am not, I don't take it as this committee's position that I'm gonna be the waiver factory. I think you impose this discipline on the system for a reason. It's because you want studies completed in a reasonable amount of time for a reasonable amount of money. And I'm gonna be uh very reluctant to give any relief to that discipline, because I think it's an incredible tool that you've given us, and I think General Graham agrees.

47:46 – 47:46

Thank you. You're back.

47:48 – 47:51

The chair now recognizes Mister Kiley for five minutes.

47:54 – 47:55

Thank you, Mister Chair,

47:55 – 51:01

uh thank you for your testimony and all of your efforts to uh uh accelerate uh the process of of building that's so important and is uh is vitally important in my state. uh of California where we've had uh many issues related to uh our water supply and have been hamstrung by the state's failure to build uh adequate water storage really for uh for decades now uh so it's really fallen upon uh local communities to do the best that they they can uh to provide for their own residents and to that end i wanna thank you for uh the work you've done with uh me and my office on uh a five point three million dollar uh project for preliminary uh and final design work uh along with environmental compliance for a fifteen mile raw water pipeline uh serving west of Placer County. This project's uh gonna connect an existing Placer County water agency intake on the upper American River, uh to Roseville's Barton Road water treatment plant, and once completed, Roseville will retain access to their surface water resources during times of drought or emergency. Uh this will have many benefits, it's gonna reduce reliance on a single aging inti- intake at Folsom Reservoir, uh improve water reliability during emergencies and droughts serve residents to regional hospitals in a robust manufacturing and business economy enhance groundwater banking and efficient water use increase surface water availability in the lower american river for municipal industrial uh and environmental needs and uh we've worked very hard the last few years this is originally improved in word uh uh and thank you very much for uh for getting this to the point where it can move forward Um, I've also, uh, as one of, uh, the projects that we've gotten federal funding for, we've, uh, enhanced culverts, uh, that are very vital to, uh, water infrastructure in our area with the Placer County Water Agency. And, uh, we're finally starting to, uh, have some hope of larger scale, uh, changes in California, uh, as well, as part of HR one this last year. uh there was one billion dollars that was secured for new water infrastructure uh this was primarily uh secured through uh the california delegation so uh we look forward to seeing that uh funding this is really a department of interior decision but uh wind up uh supporting uh enhanced capacity like raising shasta dam uh in california uh and then finally we have uh gotten federal approval on significant federal funding for sites reservoir in california uh which is an off-stream facility that's gonna provide upwards of one point five million acre feet uh of storage this is the first new significant water storage california has seen uh in several decades uh and holds the hope of getting us out of this uh cycle of floods and droughts uh where we have uh sometimes both at the same time by the way in terms of states of emergency uh so that we can actually save the water that comes in the wet years and use it uh in the dry years so that we're we're not uh taking water away from our farmers, forcing them to fallow their fields, forcing our citizens not to water their lawns or take shorter s- showers. So uh your work uh is is critical to many pieces of that. I want to thank you for uh everything that you're doing and for the very constructive relationship you've had with my office. I yield back.

51:04 – 51:10

Uh, the chair now recognizes Mister Garamendi. Where's he? There he is. Five minutes.

51:12 – 52:54

Uh, thank you, Mister Chairman. Secretary Tella and uh General Graham, thank you very much for your testimony today and for the answers that you've provided thus far. I want to go through three issues. I'm gonna start with the California Delta. And a decision that is now before the Army Corps of Engineers, uh and I suppose Mister Telus you will also be involved. Uh, it's the record of decision. I would hope that the Army Corps of Engineers would deny the federal permits, uh to um we to allow the State of California to dig its proposed delta conveyance project tunnel that has very serious impacts uh on the delta. So that's question number one. Um, where is that? So we sent a letter on February third uh to you, General Graham. Um, I would not expect a reply in two and a half weeks, but here you are, so that's question number one. Question number two goes to uh the Maryland St- Strait Channel dredging. This is a uh, was in the twenty twenty four. It directed the Army Corps of Engineers to expedite the completion of the Mirror Island Strait feasibility study. This has to do with the uh Ships Act and the ability of that particular facility in Mirror Island to handle larger ships. And the third question uh deals with um uh the overall dredging uh in the San Francisco Bay Area, including uh to Sacramento uh and Stockton. Uh what is the status of that? Uh, and so those are the three questions. Let's start with the Delta. General Graham.

52:58 – 53:30
Chief of Engineers and Commanding General, United States Army Corps of Engineers

Representative Garamendi, thank you for that question. Um, primarily our role in the Delta conveyance, uh, project is just our regulatory work under, uh, the Clean Water Act four O four. um any impacts to waters of the united states that um the new infrastructure that's required for that intake would be and um we'll get back to your office on exactly when we expect to release the supplemental eis um but we are tracking this closely

53:30 – 54:12

well the existing uh eis indicates that there are very significant uh environmental issues associated with the delta Uh, I won't go through all of them here. They are significant. Uh, it is a perfect way to destroy the largest inland fresh water uh estuary on the West Coast. Uh, so uh this project uh that's proposed by our Governor and others is should be a non-starter. The role of the Corps of Engineers is significant. So please uh get back to us and um be happy to uh further enlighten you on the potential problems associated Most of those are in the record. Um, okay. The next one having to do with Mare Island.

54:14 – 54:48

Sir, Sir on Mare Island, um, understand that uh, administration's priority is to main, or is to restore America's maritime dominance. And that's what you're working on here on the old ship, or navy facility that used to be out there. Um. the district has been working on that two sixteen study. Um, right now it's not looking all that favorable. The good that's not the great news, but the good news is is most of that channel is self scouring down to thirty feet. So, so that's that's the good news, and we're happy to come brief you on

54:48 – 54:49

Uh, General,

54:49 – 54:50

everything that we looked at.

54:50 – 55:47

we certainly appreciate the briefing, but the fact of the matter is, uh, that it is, uh, the administration came out with their maritime strategy last week. Uh, and it would call for the revitalization of the commercial maritime industry. And of course, we already have a shortage on the west coast of docks that are available for the Navy. Uh, dredging becomes critically important. And I would take uh issue with your assessment of the uh of the dredging and the normal scouring uh from the river itself not happening. Major project, if we're going to rebuild our maritime industry, we're gonna have to deal with uh this particular one and of course there is always richmond that we could add to it and the other uh harbors uh and finally uh the final issue really deals with uh how are we going to uh deal with the um problems that are associated uh again general issue of dredging in san francisco bay

55:49 – 56:03

representative guermante delighted to say that we're starting to treat dredged material not as a waste product, but as a vital resource to be housed and we've got great authorities from this committee to work to um better use

56:03 – 56:24

Yeah, my my final point, Jen, well excuse me for interrupting, but uh you should keep in mind the adapt using the adaptive management program of the Endangered Species Act providing thereby providing flexibility, not based on the calendar, but rather on where the species are and whatever potential harm there may be. So adaptive management and dangerous species act. Thank you, Mr. Chairman. You're back.

56:26 – 56:30

The chair now recognizes Mr. Taylor for five minutes.

56:33 – 57:39

Thank you, Chairman and Ranking Member, uh, for holding this hearing today and thank you very much to our witnesses for being here. Uh, the sacrifices you guys made to be here today are, don't go unnoticed and we appreciate it very much. I represent many, uh, counties along the Ohio River. Uh, Congress must pass legislation that encourages growth and development, that speeds up project timelines, and protects our communities from flooding without being filled with frivolous regulations. Public-private partnerships have historically benefited the federal government and taxpayers. The Meldahl locks and dams in my district is a prime example of how public-private partnerships with the Army Corps can protect communities while providing economic opportunities. Completed in twenty sixteen, the three turbine hydroelectric plant and spillway were added to the Meldahl locks and Meldahl locks and dams, generating a hundred and five megawatts for the community. Under Secretary Telle, uh I understand that the Corps coordinates with the Federal Energy Regulation Committee a commission for these uh potential partnerships. Is there any opportunity in this upcoming word of reauthorization to encourage or promote these partnerships to help create new domestic energy production along this existing infrastructure?

57:40 – 58:51
Assistant Secretary, United States Army (Civil Works)

Congressman Taylor, uh you're absolutely right. Uh and six percent of our nation's energy is from hydropower, twenty-five percent. We're the L- U- the U S Army Corps of Engineers is the largest owner of hydropower facilities. But we have so many of our dams where hydropower is not uh not part of the equation. And this is not one of our primary missions, but we can create our through our four O eight regulatory program, we can create a streamlined process that allows the entire nation to take advantage of the situation that you described in your home state. Uh, and we are undertaking this committee and word of twenty twenty four wade in on streamlining four O eight. This is um, we we w- General Graham and his team have got a good grasp on four O four clean water act permits. But when you go around to our districts, they all handle four O eight a little bit differently, because it has to do with touching our infrastructure like dams, and it's a more sensitive uh life and safety issue. If we can come up with a a streamlined national approach to four O eight, we can unlock hydropower, potential energy that exists in our system today, in the same way we did it in Ohio, we can do it nationwide, through building infrastructure, not paperwork. This is one of the exact things that we are doing. So thank you for bringing it up.

58:53 – 1:00:01

Thank you. The course construction and management of levees across the Ohio River have historically protected uh communities along the Ohio River from flooding, saving countless lives. As these communities grow in population and economic development, local communities may seek to modify the Corps' existing infrastructure through the section four O eight program. Unfortunately, some communities ran into, in in my opinion, uh unnecessary bureaucratic delays while the Corps was completing its completeness determination for a project in my district. My constituents reported that repeatedly the Corps took the full thirty days to respond to each correspondence, delaying the project and holding up critical development. This process began in early June of twenty twenty five. It was not resolved until late January twenty twenty six, seven months after the application was submitted for review. I understand that some approvals take time, but project delivery is crucial for folks on the ground, and seven months for approval can put projects like this one in my district in jeopardy and drive up costs. Under Secretary Telle, when looking at a upcoming word of reauthorization, how can Congress ensure that the section four O eight approval process is completed promptly and communities are not worried about losing federal funding?

1:00:02 – 1:00:33

Congressman Taylor, you're absolutely right. This is a place, as I said before, that this committee has spoken on before. Uh, before I leave this job, I hope to have a new uh rulemaking that streamlines four O eight for the entire country uh so that each uh member of the public who seeks a four way permit from the corps of engineers can have a process that's timely, that they can rely on getting answers. Obviously we're not gonna compromise our infrastructure, but we have to be able to streamline this process. It's buried way down in our bureaucracy and it's something we need to elevate. General Graham, anything to add?

1:00:34 – 1:01:05
Chief of Engineers and Commanding General, United States Army Corps of Engineers

Uh, couldn't agree more. uh we won't sacrifice the integrity of say that dam on the ohio river but the the paperwork processes absolutely and i i think as mister tell outlined it is to give district engineers more uh authorities in that so they can move faster one one piece that i could add on the ohio river all the icing conditions the team in the ohio river particularly down in your area perform magnificently well keeping those vital arteries open during some really challenging conditions and i'm tremendously proud of them

1:01:06 – 1:01:43

Likewise, I was over there with an opportunity to look at some of that work being done, and I really appreciate what was done to help those folks. I'm gonna submit this last question and you guys can or maybe uh Lieutenant General can get back to me with the answer. Ohio is home to many abandoned mines with over thirteen hundred miles of streams impacted by potential acid mine drainage, many of these streams flowing into the Ohio River. That's why I was pleased to see in the last word a reauthorization authorization for the uh secretary to establish a pilot program designed to establish treatment works for abandoned mine drainage in Ohio, Pennsylvania, and West Virginia. Uh, Lieutenant General, has the Army Corps of Engineers begun the process of establishing this pilot program?

1:01:44 – 1:01:51

Uh, conference, we'll we'll get back to you with an answer on that, but having grown up in Pitts in Pittsburgh, I certainly understand the importance of this issue.

1:01:51 – 1:01:52

Appreciate that. I yield back, Chairman.

1:01:53 – 1:01:56

The chair now recognizes uh, Mr. Ryan for five minutes.

1:01:57 – 1:05:07

Thank you, Mr. Chair. Thank you both for being here again. Uh, good to have you back. When you were here um in September uh and appreciated that visit, I I focused on what I made very clear is a top priority for my eight hundred thousand constituents I wanna bring that project up again and maintain that focus. Um this is the Curious Joel Aqueduct Connection project. Um at that time appreciate that you both um acknowledged that you were tracking this and and working on it. Um, I also wanted to thank you, General Graham. Uh, I asked you during that hearing, um, for a commitment to a to a meeting with your, uh, senior leadership. And, uh, you you followed through on on time and, uh, uh, under budget, uh, on that meeting, uh, with General Gibbs. Appreciate that. Appreciate it. Um, all the local leadership and Colonel Young, uh, um, in the district being very engaged in this. So I just wanna thank you both first and foremost for your continued um timely and and deep uh engagement and commitment on this. What has changed even in the few months since I brought this up in September is that the urgency and the dire need for water in this community unfortunately just continues to to grow and I wanted to just give you some fresh data points there. Um and j- just to refresh your memories this is a village that's the biggest uh municipality in my district It's one of the youngest and fastest grou fastest growing communities in the country. Um, the average family size is nearly double the national size of families, uh, five point three seven people per family to be exact. Um, since nineteen ninety, the population has grown five hundred percent in this village. So they are doing everything right to essentially raise to keep up with their rapid growth which we appreciate and and want in in other parts of the the district and the country and they just need uh some help to to really do that what has particularly changed is just as they've continued to work this the they're just in a severe water supply deficit at this point um as they work through what is the final phase of a a a successful twenty year project um the concern is that without just you know we've gotten s- state funding we've gotten additional prior federal funding but we need to speed up the urgency and so are asking uh your help on this. In the last year or two the village has been forced to rely on temporary unsustainable measures for for supplying water they've been trucking in uh drinking water they've been purchasing water at incredible mark-ups just to make sure that their folks there's a lot of kids in particular have adequate water and this isn't even covering a fraction of of their needs um so we're able to get the authorization up for this project in uh the twenty twenty forward i'm gonna attempt to do that again but i specifically wanted to ask now that uh the preparations work is done um how you're thinking about and and whether we can get any support in the in the upcoming work plan that i know you're working on uh to try to speed this up because it's it's just really hard for me to look my constituents in the eyes and say we're not doing everything we can to just make sure they've got they've got water so would appreciate both your input on that, and again thanks for you know your engagement on this.

1:05:07 – 1:05:34
Assistant Secretary, United States Army (Civil Works)

Congressman Ryan, uh just to respond uh thanks to your advocacy for this community, I think I was on the phone with General Gibbs a few hours after he met with um your constituents I think General Graham was also getting that update at the same time this is something you brought very clearly to our attention. We're currently in the process of working with Office of Management and Budget to develop our twenty twenty-six work plan in response to the Energy and Water Appropriations Act, and appreciate your advocacy on this program.

1:05:35 – 1:05:39

When are you guys roughly expecting that? I know we we finally did our

1:05:37 – 1:05:42

Yeah. The date escaped me. The law says we have sixty days to deliver that work plan to Congress from the date of enactment.

1:05:42 – 1:06:12

We did we did our part and and certainly, you know, you need adequate time to do yours. Um, I I appreciate that. Um, again, I just I just wanna um thank you both for the work that you're doing and your teams, um, and ask really just on behalf of my constituents as you're making those hard calls. I know EI projects in particular are often seen as as lower priority and I, and I understand that there's a huge need across the country, but this one has just reached a a really critical point. So, um, thank you. I'll yield back the balance of my time. Thank you, Mr. Chair.

1:06:13 – 1:06:17

Uh, the chair now recognizes a Mister Westman, for five minutes.

1:06:20 – 1:09:54

Thank you, Mister Chair, and thank you to the witnesses for for being here today. You know, I grew up listening to uh President Reagan tell stories to illustrate uh some hard facts in life, and one of them he used to tell was about the uh Communist Soviet Union and the Gab uh, bought a new car and he asked them when he would have it and they said six years from now. And he said, " Is that morning or afternoon?" And the, uh, the guy said, " What do you mean six years from now? Why why do you care if it's the morning or the afternoon?" He said, " Well, because the plumber's coming in the morning." And when I think of some of these projects with the core, I can see stories that make six years look like a, uh, uh, a very short amount of time. There's some great illustrations I've dealt with the corps since I've been in congress, and then some not so great ones. The the first not so great one was uh my hometown needed uh one quarter inch of water out of a lake that's um about two hundred and sixty feet deep in places. They needed one quarter inch of water per year out of that lake, and it took sixteen years to get the corps to uh authorize the project. while the cost of building the water supply system skyrocketed. Um, we we finally got that done. No common sense whatsoever in in doing that. Then uh I reflect back to a flood on the Arkansas River five or six years ago. Um, terrible flood, took sections of levee out. and i had all these farmers wanting to uh they were trying to figure out whether they're gonna be able to plant their crop in the fall and they couldn't get an answer from the federal government on whether they could get crop insurance, if they if the levy wasn't in place uh and colonel eric noy he's he's my corps of engineers hero he's retired now but he came out and looked at the project and started talking about how many years it would take to go through the environmental assessment and historic preservation And uh he got it though. He he realized that was a lot of nonsense that was holding up progress, and he fixed that levee in about two or three months. So I know that when the uh right efforts are put forth, the Corps can can move mountains, they can move a lot of dirt in a short amount of time, and uh that gave me great faith in the Corps. Which brings me to my next issue, and that's the twelve-foot channel of the Arkansas River on the MCARN system. So it was first authorized in two thousand four. And here we are, twenty twenty six, and there hasn't been one effort made to deepen the the channel in the Arkansas River, even though a few years back I was the ranking member on the Water Environment subcommittee, and we put new language out there to deep in the channel there was two hundred million dollars uh that the corps had for uh maintenance on the mkarns and still nothing's happened. So, uh my question is when's something going to happen on the the mkarns and what else does congress have to do other than authorizing and you have funding to do it, how do we get this project to actually happen? Because when I'm back home um the the people who use the MCARNs, that's the pretty much the number one and only question I get asked.

1:09:55 – 1:10:45

Uh, Congressman Westerman, uh, the frustrations you expressed are exactly uh why we're getting after the building infrastructure not paperwork uh initiative. Uh, we're hoping that we hear fewer and fewer stories like this. As it relates to the MCARNs, Uh, I'm pleased to say that I I I was there recently. Um, it is an incredible uh facility, an incredible uh capability we have as a nation. I was at the Port of Catusa, which is upriver from you and uh even even past Tulsa. Uh, what an amazing facility to deliver uh products that are created right in America's heartland to the world. Um, with regard to the twelve foot uh channel depth, I'll defer to General Graham on that. I do know that when we're looking at these types of systems, making sure we don't strand uh deeper channels against shallower channels is a big consideration but general graham i don't know if you wanna provide an update.

1:10:45 – 1:11:40
Chief of Engineers and Commanding General, United States Army Corps of Engineers

sure thank you first if i'm just gonna pivot to the to the levees absolutely when a flood hits we need to stay in army mode and to get those levees repaired not within six years not within five years before the next storm hits that that's our absolute goal and we're here to protect the people's livelihoods behind there we're not here to um, defend any of our bureaucracy. So, Representative, you have our absolute commitment to that. On the MCARN system, uh, understand your, uh, the folks you talk to, their number one concern is, uh, getting more savings by a deeper river. My number one concern for that system is the reliability of it. It's about fifteen years behind where, say, the Ohio River system is, in terms of needing major recapitalization. So, when I look at the - all the engineering reports that come in, making sure that what we have stays reliable is my number one concern.

1:11:40 – 1:12:25

i understand that and that that two hundred million i was talking about eh got moved down to the three rivers project which is infrastructure which is very important uh but unfortunately it wasn't used so it went back into the maintenance fund so i'm i'm i wanna work with you i i get it that that infrastructure needs repairs up and down the river uh but it just seems to take forever to to get things done in the the it's not like you gotta dig a new channel the full length of the river. There's a few places where it's not twelve foot deep that need to be uh dredged out and fixed so that the river can be used. So, Mister Chairman, I appreciate the uh indulgence and I yield back.

1:12:27 – 1:12:30

The chair now recognizes Miss Friedman for five minutes.

1:12:30 – 1:13:43

Uh, thank you, Mister Chair. Um, uh point of personal privilege uh after his military service my grandfather spent his entire career with the army corps so i have a tremendous amount of respect for the organization and for what you all do so thank you so much for being here um lieutenant general graham i had the opportunity to ask you a few questions the last time you were here about the packer for the la river restoration project a very important long time project in my area in los angeles During that hearing, you had told me that the Corps was committed to completing the PACER in time for the twenty twenty-six WERDA. Unfortunately, on February ninth, after asking for a status update on the PACER, my staff received communication from the Corps that stated, quote, "federal funding is not available to continue the project's PACER completion in support of the WERDA twenty twenty-six timeline", end quote. Now my staff and I have sent several follow-up questions, which of as of now have not been answered. So I'd like to use part of my time to get some clarity on the status of this very important project with which LA has invested millions of dollars over the years. Uh first, Lieutenant General Graham, can you provide me with a timeline for the completion of the PACR?

1:13:44 – 1:14:57

Oh. Representative uh Freeman, I will not be able to honor the commitment we made at the last hearing to finish um, that packer before the next word of bill is due. Um, a multitude of reasons are are behind that. Some are the challenges, the absolutely uh ballooning astrome- astronomical costs of real estate. question the viability of it and the ability of our non-federal sponsor, um, to provide the funding to get that real estate. There's also some environmental concerns. Uh, I've walked that whole region. I understand how important it is to the community. And, you know, nobody likes large concrete trapezoidal ditches running through their community although in the the recent rainstorms out there, LA River did its flood risk management job magnificently well. So we are committed to working to see can we balance the flood risk management needs and the aquatic escrow system restoration needs. But in the case of LA River, we're - we're challenged to f- um, put the conditions together that we believe we're gonna have a - a viable way forward.

1:14:58 – 1:16:57

Thank you, it's disappointing to hear and I would love to have more communication um with the Corps as we move forward. I mean certainly LA has put a lot of their own resources into this project over the years, it's been promised to the community, um it serves a very important function but could also serve a more important function if we can do the investments to help capture more water and um my fellow representative from california mentioned water storage and we've got a lot of water that runs down the river out to the ocean every time it rains and there are reclamation and capture projects as part of this project that are planned but you know for the communities that have lived alongside of this for years and have been promised an amenity that they can use the communities that have been divided from parts of the city because of this infrastructure project who want crossings want to be able to have this not be blighted but be an amenity for their children. Uh, moving forward, this would be a huge disappointment. And as the project continues and as it drags on, the costs are only gonna increase. So if we just kick the can down the road because of current costs, we're looking at ballooning costs over the years. And again, there's a lot of sunk investment into this. So I would hope that we can keep finding ways to move this forward. Uh, in my last uh minute here, I do wanna also mention the deeply concerning directive issued on October fifteenth, twenty twenty five by the Department of War, which requires the core district to obtain approval from the Office of the Assistant Secretary of War for Legislative Affairs before engagement with federal or state elected officials and their staff. I mean, this is something as we're talking about removing red tape. and that seems to be a priority of the Trump administration and of yours, this is adding layers of red tape that we're just never gonna be able to to unstick. So, Lieutenant General Graham, how has this directive impeded the Corps' ability to work with Congress, and how do you plan to ensure timely communication with offices regarding time-sensitive informations like the LA Re- River restoration projects, if you can't talk to us without going through another uh agency?

1:16:58 – 1:17:51

Thank you for that question. The Army Corps of Engineers, we strive every day to function as one team, one team from the district level that are interfering with your or interfacing with your constituents, uh, up through our division level, through my headquarters, and up to Mister Telle's office. Our goal is to function as one team. And as my interpretation of the guidance from the Secretary of War and the Secretary of the Army, it revolves around the basic principle that the left hand of the organization should know what the right hand of the organization is doing. And it's also around the basic principle that the uh at the lower levels of the organization they should be entirely nested with the guidance and direction um that senior leadership is providing and so I think that's all well just and proper if the actual execution of that um is clunky right now, that's my responsibility to fix it and that's our commitment to you here today.

1:17:52 – 1:17:59

Well, it seems to me that adding this layer of bureaucracy is gonna make things slower, and maybe us not getting a response is part of that. With that, I yield back. Thank you.

1:18:00 – 1:18:04

The chair now recognizes Mister Onder for five minutes.

1:18:04 – 1:20:27

Thank you, Mister Chairman. Secretary Telle, General Graham, thank you for being here today. WERDA works best when Congress sets clear priorities and the core delivers real infrastructure not just process milestones. Uh, Secretary Telle noted that the core performs best when it's unburdened by red tape and is free to focus on execution. I couldn't agree more. I in Missouri, we don't measure success by how many reports are issued, but whether our levies hold, whether our locks operate, and if our communities are protected. Missouri's third district depends on reliable inland uh a a reliable inland river system the missourian mississippi rivers which converge in my district support agriculture manufacturing energy and multiple businesses throughout the district we have also a a we also have aging infrastructure that the federal government built decades ago and then sold off and abandoned so as we work to develop ward uh twenty twenty six i want to focus on three things first delivering on the already authorized projects and clearing the construction backlog. Second, prioritizing flood risk reduction and ecosystem restoration projects that address the real and present risks to Missouri families and landowners. And third, improving transparency and accountability so Congress and local sponsors know exactly what projects remain unfunded and more importantly, why. Uh, Secretary Telle also pointed out that we have over forty-five billion dollars sitting in undelir sitting undelivered nationwide much of it decades old. That's unacceptable, especially when we have communities awaiting for much needed infrastructure upgrades. So I look forward to discussing how WERDA twenty twenty six can sharpen focus, restore fiscal discipline, and ensure the Corps builds what America and Missouri actually need. Secretary Telle, uh, you stated that the Corps currently has forty-five billion previously appropriated but not yet delivered, uh, with fifteen billion of that being more than six years old. Are there specific reforms that you would like to see implemented in more to twenty twenty-six to help prioritize completion of these already authorized construction projects? Particularly flood risk and navigation projects in states like Missouri before authorizing new ones.

1:20:29 – 1:20:40
Assistant Secretary, United States Army (Civil Works)

Congressman, uh, thank you for the question and, uh, congratulations on representing the part of America where the longest river, uh, intersects with the second longest river, uh, the longest being Missouri, uh,

1:20:40 – 1:20:40

Yes.

1:20:40 – 1:22:11

just slightly. Um. Look, I've been over it. I think some of this stuff is very fundamental and may not require an act of Congress to deliver on, just simply a changing culture. We have to empower our commanders. We're not doing that today. We're asking them to do everything all at once with the same level of effort. Uh, the reason a lot of this funding is stranded is because we get caught in endless loops of uh negotiation and back and forth and this bureaucrat talking to that bureaucrat. uh, this agency talking to that agency, um, and so I would say that, you know, that fundamental management change will do a lot to help, uh, free that unstranded, those un- unstranded resources. I think a directive from Congress, uh, to us to re-examine whether, uh, that forty-five billion dollars that's currently stranded, if it can be applied somewhere else more efficiently or appropriately, would be useful. Um. But I think more importantly, we have to just get out of, we have to make sure that um, and in particular we get caught up in uh arguments with other federal agencies, our partners. My my view and what's part of building infrastructure not paperwork, is that if we elevate these challenges uh here to Echelon and Washington, we can look across at another agency and say, " Hey, let's solve this problem." Uh, I think about a project in Florida, uh, in South Florida, Port Everglades. That project cost, to deepen and widen that port, cost six hundred million dollars. But the current price tag for that project is three point two billion dollars. That means we, the United States of America, are paying five X for a port on the basis of haggling uh between the inter-agency.

1:22:07 – 1:22:10

What it could have. What it could have. Right.

1:22:11 – 1:22:14

And we can do a lot to fix that if we, uh elevate it.

1:22:11 – 1:22:13

Yeah. A lot better than that.

1:22:14 – 1:22:15

So thank you for bringing that up.

1:22:14 – 1:22:43

Thank you. Well, also for you, Mister Telle, the um the Secretary Telle, the federal government constructed and later abandoned the L- Lock and Dam number one on the lower Osage River in Missouri. It now possesses uh or poses safety and liability risks. Given that this is a clear legacy federal project, will the administration's support word of twenty twenty-six authorization and funding author uh funding prioritization for removal and ecosystem restoration on Lock and Dam number one.

1:22:44 – 1:22:47

Sir, I'm gonna let General Graham take that one, he has the latest on that project.

1:22:47 – 1:22:48

Thank you.

1:22:48 – 1:22:59
Chief of Engineers and Commanding General, United States Army Corps of Engineers

Sir, uh, quite versed in the challenge with Lock and Dam number one on the Lower Osage River, uh, our commitment to you is to have a chief's report that I'll sign by the uh end of May.

1:22:59 – 1:23:02

Thank you very much. I yield back.

1:23:03 – 1:23:06

The chair now recognizes uh Mister Figures for five minutes.

1:23:07 – 1:26:02

Thank you, Mister Chair, uh and thank you Secretary Till and Lieutenant General Graham for being here today. Uh, Secretary, it's good to see you again. Uh, we were down had the privilege to spend a little time with you down in Mobile, a few months back when we were celebrating the deepening of that port, uh which is an example of of what happens when communities uh can work together with the Corps to prioritize uh local and regional uh priorities from an infrastructure standpoint and now we can proudly say Uh, no disrespect to any of my other colleagues on the committee that the port of Mobile, Alabama is the deepest port in the Gulf. Um, the deepest. So deeper than Houston, deeper than New Orleans, deeper than Miami, deeper than Tampa. Um, we are uh hopefully soon to be home to the largest amount of imports and exports uh coming in and out of the Gulf. Um, as we begin work uh towards winter twenty twenty six, it's important that we recognize the breadth of water infrastructure challenges facing communities across the country. Uh, while navigation and major coastal projects often receive the uh brunt of the attention, uh many cities, large and small and rural especially, are grappling with aging water systems, inadequate storm water infrastructure, sediment management challenges, and mounting wastewater needs. Uh, in my district these are not abstract concerns. Communities are dealing with recurring flooding, uh failing or outdated water systems. In fact, one of uh one city in my district, Pritchard, Alabama, has a water system that has been described by experts who have worked in Flint, worked in Jackson as America's worst water system. Um, the, you know, this certainly creates challenges that affect public health, economic develop- uh, development, environmental quality, and - and overall quality of life. And WERDA has long served as a bipartisan vehicle to address pressing water resource needs as you guys well know. Uh, as we consider WERDA twenty twenty-six, we must ensure that the Corps is equipped not only to maintain major navigation channels in large-scale projects, uh but also to partner with local communities on comprehensive water management solutions, particularly in areas facing infrastructure deficits. Uh I look forward to discussing with you guys and working with you guys how the administration will prioritize water supply wastewater storm water and sediment management projects uh inward of twenty twenty six and how we can insure communities especially small and mid-sized cities and rural communities, uh can effectively move projects forwards through the through the course process. Uh, our goal should be clear. Uh, we should be striving for a word of bill that strengthens infrastructure resilience, improves water quality, uh, supports economic growth, and delivers meaningful long-term benefits to communities across this country both large and small. Uh, many of the core projects authorized under Water Resources Development Act are vital for community safety, economic growth, and environmental and coastal uh resilience. Secretary Telle, I will start with you. Um, how could underfunding, how could us not providing enough funding um in WERDA uh for operations, maintenance, and construction affect the Corps' ability to deliver these authorized projects effectively?

1:26:04 – 1:26:18
Assistant Secretary, United States Army (Civil Works)

Uh Congressman, thank you for the question, and um I would note that uh you invited me to join you in in Mobile at the event that we attended together uh in this room uh from that very chair and we wind up sitting next to each other so that was uh that was great um

1:26:15 – 1:26:15

Yeah.

1:26:18 – 1:27:18

In terms of uh resourcing uh operations and maintenance, this is critical. You'll see um us emphasize operations and maintenance. General Graham just did. Um and we a- absolutely there are key issues where additional funding uh c- included in the President's budget is required, but I believe that we can accomplish so much with the authorities and the funding that we have. We're not delivering uh sufficiently in my view on schedule and cost with what we have. And that's why Uh, you saw us yesterday introduce the Building Infrastructure, not paperwork initiative. This is designed to squeeze more out for every American community out of the resources that you provided. These decades-long schedules, these billion do- billions of dollars in cost, we can do better as America. Uh, our water infrastructure is really the secret ingredient to our community's health and safety. It's a secret ingredient to our economy. And we have to, as a nation, I mean, this is the greatest civil engineering entity humanity has ever known,

1:27:18 – 1:27:18

Yeah.

1:27:18 – 1:27:19

sitting next to me.

1:27:19 – 1:27:20

Well, thank you for that.

1:27:19 – 1:27:20

Um

1:27:20 – 1:27:22

I don't wanna cut you off, but I do wanna cut you off,

1:27:21 – 1:27:21

Yes, sir.

1:27:22 – 1:28:24

Lieutenant uh General Graham. Uh, I first wanna highlight the work and and reputation that your District Commander in Mobile, Alabama is establishing for himself. Kelsey Shaw is doing a hell of a job. uh by all accounts that we receive from um local uh authorities mayors you know members of the city council people that he engages with across my district which is broad and vast um they are thrilled to have him there they are enjoying working with him and they feel heard more than anything else and so uh wanna give him that acknowledgement um lastly look i live in you know i represent part of hurricane alley and from an engineering perspective obviously given funding uh, cuts and and staffing changes that we've seen over the past uh year plus, uh, wanna make sure that the Corps is ready and able. If a category, if a major hurricane uh today is to hit the Gulf Coast or anywhere in America, uh, are you confident in the Corps's ability uh with its current resources uh to be able to respond effectively and efficiently uh to provide a timely response uh to major infrastructure uh damage that may happen from those storms or do you need more?

1:28:25 – 1:28:45
Chief of Engineers and Commanding General, United States Army Corps of Engineers

Uh, Reverend Figured, I, we absolutely are, with leaders like Colonel Shaw, um, making sure that we're staying in army mode, whether that being under core authorities or whether we're working under Stafford Act or under FEMA's authorities, our goal is always to help people as fast as we possibly can. And in your vulnerable part of this country, the, uh, that's absolutely true.

1:28:48 – 1:28:48

Thank you. Now you're back.

1:28:50 – 1:29:08

Thank you, and as somebody that wanted to attend that that event, I I couldn't and I hated, cuz it was a it was a great project and a good example of what the Corps can do under came in under budget and under times. So, it's good good project. Uh, the chair now recognizes Mister Burleson for five minutes.

1:29:10 – 1:31:10

Thank you, Mr. Chairman. Um, you know, after decades of frustration, um, and myself being frustrated, um, representing my district for three years, coming here to the, our annual hearing that we would have. Um, I What a change. What a change. Um, Secretary Telle, I cannot thank you enough for the, for the sea change in attitude and respect for the citizens and the taxpayers and their and their neighbors. Um, what a difference. Uh. Thank you for the, your leadership, General Graham. Thank you. Um, I have, you know, you and your, y- you know, Brigadier General Walter have just demonstrated tremendous leadership that we haven't seen in decades. Um, and I am so impressed with Lieutenant Colonel Jesse Carter. And, and uh, just last week he led a team from Little Rock office to my district to have a series of community meetings um to to explain the changes in the policies of that uh that they're gonna have. And it, they were welcomed with, you know, positive feedback from the constituents in my district and I cannot thank you enough. And first I just wanted to say thank you. Um You you have clearly demonstrated, Secretary Telle, a a a almost a private sector attitude, the way in which you address trying to streamline processes, make the core um faster, quicker, responsible, and and ag- again, this is this goes to both y- y- both of you. Um, I ju- it's it's it's impressive to see happen. Um, can you highlight some of the new initiatives that you guys have worked on and and um, and if you wanna make any comments about your experience at Table Rock Lake, that would be that would be great.

1:31:12 – 1:32:53
Assistant Secretary, United States Army (Civil Works)

Well, Congressman, I will just say, um, we made a commitment to you, um, in this room in September. And, uh, we followed through with that commitment, and I'm pleased to see, uh, that the situation has improved in Table Rock Lake. Um, with regard to our initiatives, we're so proud of our building infrastructure, not paperwork initiatives. there are so many uh ways that we can improve here. I I wanna I wanna hit on something, since you've given me the opportunity, um that we that General Graham hit on earlier, but we haven't we haven't fully articulated, which has to do with the way we contract for dredging. If you think about dredging, this is really it's the equivalent of a snow plow plowing your street. It allows you to get back to work and it's the equivalent for our nation, uh of a snow plow clearing your street and enabling uh enabling productivity. Um, unfortunately, the way we contract for this is regional in scope. We talked about this. Um, we have less intelligence, uh, about, uh, the dredging activity across the nation when we're sitting across a negotiating table from a dredging provider than they do. And they're, and, and, and, and they're, we're often competing against ourselves, driving up cross-costs across the country, having to run errands across the country in a way that's incredibly inefficient. Um, we're already underway under building infrastructure and not paperwork to elevating that contracting activity to a place where we have a national view and it's gonna make us far more efficient. It's gonna make us squeeze mon- uh allow us to squeeze uh every drop out of taxpayer dollars that we can. Um, and so, I I I'm extremely excited about that. There are a number of o- other ways that we can get into. I've got a minute and twenty-three seconds left. I can provide uh another uh uh another vignette for you um if you'd like, or I can answer another question, sir.

1:32:54 – 1:33:50

Well, I wanted to make sure that I I didn't miss thanking you also for, um, the water allocation that we got from Stockton Lake after after decades of of of southwest Missouri sweating and worried about having drinking water availability in the future that was something that was finally accomplished and I and I can't thank you, and my district cannot thank you enough. Um, I wanted to ask about some of the the m- the funding that uh the corps has, um about forty five billion in in a a congressionally appropriated funds, um that included about fifteen billion that was, that had re- remained unspent for about fifteen years. Knowing that in in my district there are there's infrastructure that needs improvement, Um, can you can you address that issue and what what we may need to do if we need to make any changes in order to make sure that that those funds are utilized?

1:33:51 – 1:35:08

Uh, Congressman, thank you for the question, and and this is something we're working on every single day. We've analyzed every dollar of those forty-five billion uh that are out there. Some of them are still uh part of a project that's active, and for one reason or another uh we just haven't gotten to the point where we can start spending it. Some of it is stranded, uh some of it will never be spent uh unless we repurpose it. And so we've been working with the Office of Management and Budget, uh we'll wor- work with the Appropriations Committee, we'll work with this committee uh to try to make sure that one, we're carrying through and executing the dollars that Congress has provided, but to the degree that those dollars are not I mean the enterprise, the core, has never had anyone, most agencies have co- funding that expires. Much of our funding never expires. And the Corps has rarely had anybody come around and say, " Hey, if you don't spend this money, it's gonna go away." Um, we're gonna execute the law and we're gonna spend the money that Congress has given us in the way that uh we that the Congress expects. However, um, someone needs to put some discipline into the system to make s- to get some decisions made on how to execute this money and I've been doing that. Uh, I've been letting the enterprise know that if you don't spend the money you have, eventually Congress is gonna take it back. And so, uh, we've been getting that message out, it's put a shock into the system. I think our fiscal folks across the board are now awake and interested in spending this money.

1:35:09 – 1:35:33

Thank you. And lastly, I just wanna invite you again to come back to Table Rock. Every Veterans Day we have an amazing event where we're our fishing guides, dozens and dozens of fishing guides. offer free guided service to our veterans. It is one of the most beautiful and, you know, Americana kind of event that you could ever see and, and you both are invited to come. I, I would, I would greatly appreciate it.

1:35:34 – 1:35:39

Uh, thank you, Congressman. Uh, if not for the laps in appropriations, uh, we might have joined you for that, uh, back in November.

1:35:40 – 1:35:41

Thank you, and I yield back.

1:35:42 – 1:35:48

Thank you, Mr. Table Rock. The chair now recognizes, uh, Miss Norton for five minutes.

1:35:53 – 1:37:57

Thank you, Mr. Chair. The Army Corps supplies the District of Columbia Columbia's drinking water and the Potomac River is the only source of that drinking water. With only one day of backup water supply, man-made or natural events, that make the river unusable for drinking water would put residents the district government and the regional economy at risk at twenty uh in twenty twenty-two at my request the congress authorized the corps to conduct a feasibility study of a project uh quote project for the water supply including the identification of a secondary water source and additional water storage capability for the washington metropolitan area end quote congress has appropriated two billion three hundred thousand dollars for the study two weeks ago the corps informed me that it will likely limit the scope of the study to an expansion of the existing primary storage ba basin. That violates both the study's authorization and appropriation. Expansion of reservoir of the reservoir is not a secondary water Source. Lieutenant General Graham, why has the Corps decided to limit the study of the expansion of the reservoir?

1:38:00 – 1:40:12
Chief of Engineers and Commanding General, United States Army Corps of Engineers

Uh, delegate Holms-Norton, thank you for that question. First off, I just wanna assure the committee members and everybody listening that the water supply for the city f- parts of Fairfax and Arlington County are safe. The army's been entrusted to run that water supply since right after the Civil War. So I know there's concerns with the sewage spill, uh, from the Potomac Interceptor up there, up by four ninety-five, but that is a completely different system. We provide the - the - the treated water, um, and, uh, DC Water is responsible for distributing that water through the city, and they're also responsible for collecting and treating, uh, the sewage. Um. Fortunately for the Washington Aqueduct, and ma'am you're absolutely correct, our sole source of water, raw water is the Potomac, and we have two intakes in the Potomac River, one at Great Falls and one at Little Falls. The sewage interceptor leak was in between the two. And so the the source of uh raw water coming into our treatment plant is pristine Potomac water right now and we've shut off the Little Falls uh intake that's below the sewage spill. The Corps is, under FEMA authorities and under EPA guidance, responding to assist as part of the federal response. Our job right now, uh, we have crews out there making sure that no additional storm water, um, interferes with what DC water's doing to fix i- the interceptor, and we're also keeping additional storm water from flowing to where the contaminated um bio-soil had accumulated after the after the break. Ma'am, to your question directly on the feasibility study that's going on, to Mister Telle's point that we need to get to um quick, immediate decisions on what can we do now to make things better. So the expansion of the Delacarla reservoir would add an additional twelve hours of supply that's a thirty-three percent increase that's achievable near term. Ma'am we're absolutely not taking off the table a look at say the Trafalgar yeah if I said that right quarry to look at a more longer term um off Potomac tertiary source of water. So that certainly is not off the table.

1:40:14 – 1:40:28

Well, w- will you commit to expanding the scope of the study to identifying a secondary water source and additional water storage capability as required by federal law?

1:40:29 – 1:40:41

Uh, ma'am, absolutely, uh, we are not limiting the scope of this study, but we are looking for early actionable elements that we can put to make the resiliency of the city's drinking water safer as soon as possible.

1:40:43 – 1:41:08

What is the federal government's plan uh to provide emergency drinking water to DC in the event that the Potomac River becomes unusable for drinking water? as could have happened, had a different portion of the potomac uh in- interceptor collapsed last month.

1:41:09 – 1:41:09
Assistant Secretary, United States Army (Civil Works)

Yeah.

1:41:10 – 1:41:43
Chief of Engineers and Commanding General, United States Army Corps of Engineers

Um, like at home zone, that that's absolutely a a important question that we need to address. Our our sole source is the potomac, and as I said, we have built redundancy into that with an upstream intake and a downstream intake. But there is no primary source that's off of the Potomac. Um, they are looking to see if there's other interconnects we can possibly do with the other water treatment of or or water providers around the city, but that's the question that we will continue to explore.

1:41:44 – 1:42:25

Uh, thank you. Last month a section of the Potomac interceptor collapsed. causing hundreds of millions of gallons gallons of wastewater to flow into the Padma River. Not only is this an environmental disaster, but it also underscored the urgency of a secondary water source. Lieutenant General Graham will record provide DC water financial assistance for the long-term rehabilitation of the Potomac Interceptor?

1:42:28 – 1:43:23
Assistant Secretary, United States Army (Civil Works)

Ma'am, uh, thank you for the question, uh, and I'll just say this is this, uh, challenge in the Potomac River is one of the, uh, greatest ecological disasters of its type to ever occur in our nation. We share your goal to ensure that the Washington DC water supply is has the necessary redundancies, given that the seat of government is here in Washington. It's a critical, critically important uh goal. This is National Engineers Week, and I'd I I just want you to know I've I've done a special uh message to congratulate all of our engineers on the occasion of National Engineers Week, and I did it from the Washington Aqueduct. uh because it is such an important facility. Um and I do think that this uh disaster uh underscores the importance of this facility for our nation. We you we're in the same we're in the we're in the same position that you are. We agree, and I think it's a question of getting it right uh for the citizens but also for our the functioning of our government.

1:43:25 – 1:43:26

Thank you and I yield back.

1:43:27 – 1:43:31

The uh the chair now recognizes uh Mister Crawford for five minutes.

1:43:32 – 1:43:35

Thank you, Mr. Chairman. Uh, thank the witnesses for being here.

1:43:35 – 1:43:46

In January of this year, you announced the removal of the Little Rock District Commander, citing quote, a loss of confidence in his ability to command. This commander had assumed command less than six months prior to that decision.

1:43:46 – 1:43:47

As you both know,

1:43:47 – 1:43:54

leading an Army Corps district involves significant responsibility, and I'd say a pretty steep learning curve, particularly for an individual who may not have served in that capacity

1:43:55 – 1:43:56

uh before.

1:43:56 – 1:44:07

Given the relatively short tenure, it would be helpful to fully understand the context surrounding that decision. Can you share some details regarding the factors that led to the removal of Little Rock District Commander?

1:44:08 – 1:46:08

Uh, I'm gonna let General Graham uh address that question, uh, Congressman Crawford, uh, but I I will just say uh, I we talked with Congressman Burleson uh a few minutes ago uh when we were in this hearing room uh in September, uh I announced to Congressman Burleson in response to his question that we had paused uh enforcement of encroachment at Table Rock Lake in order we had analyzed the information that his office had sent us uh really we were doing case work on behalf of one of the members of this committee I and I let Congressman Burleson know that we had paused enforcement while we came up with a common sense solution. Um two months later, uh, I called down to the Little Rock District and said, " Hey, we're still hearing you haven't paused, uh, this activity." And I again, uh, directed them to pause this activity, uh, in in in in in accordance with the commitment I made to Congressman Burleson and other members of Congress. Um, it wasn't until December when I was on the ground there in the Little Rock District that I was talking to one of uh Congressman Burleson's constituents in her driveway, and this individual told me that she was facing DOJ heading to court under criminal accusations with DOJ as a result of the la- the the inability of the Little Rock District to follow the directions that General Graham gave them, gave them. And, uh, it w- broke my heart. It was right before Christmas. And this, uh, this constituent of, um, of, of Congressman Burleson's who I happened to meet that day let me know that General Graham's direction had not been followed and that uh, she was headed to court uh with the federal government chasing her uh on criminal accusations related to encroachments that we viewed as um encouragement enforcement that we viewed as overly uh heavy-handed, and not in the interest of the American public. And I will let General Graham take it from there.

1:46:11 – 1:46:30
Chief of Engineers and Commanding General, United States Army Corps of Engineers

Representative Crawford, thank you for that question, and I'll just elaborate a bit on what Mister Telle outlined. So it was my decision to remove the Little Rock District Engineer from command, not as a result of any ethical or moral fail failings, but rather because I lost confidence in their ability to exercise sound judgment.

1:46:30 – 1:46:32

K, let me, I'm gonna ask you to pause right there.

1:46:33 – 1:46:37

So this was strictly the colonel's lack of judgment.

1:46:37 – 1:46:47

Was there any assessment of the staff there that played a role in in the decision to continue after you'd been given h after they had been given the direction to cease?

1:46:47 – 1:46:48

But they continued,

1:46:48 – 1:46:53

was there any action taken against those uh staff, those uh civilian staff?

1:46:53 – 1:47:04

So, Rep. S. Van Crawford, the commander is ultimately responsible for everything that organization does. That's the bedrock principles of the United States Army and that's what makes us the best in the world.

1:47:01 – 1:47:05

Okay. Right, fair enough.

1:47:05 – 1:47:05

So

1:47:05 – 1:47:06

I'm but

1:47:06 – 1:47:35

So the answer to your question, sir, is um there were some additional individuals, uh many who have since retired or or well or have left government service. we're right now moving in a uh a seasoned second year or who uh commander or colonel who has commanded before and he will take a look at all the individuals and all of the policies of the district to see if any additional actions need to take place or what needs to change on the ground.

1:47:35 – 1:47:51

okay let me ask you this so this is kinda where we run into a little bit of a gray area here because you know the the individuals in the office are civilians long-term been there for many many many years. And then you have a colonel that comes in, he's brand new, he's six months on the job.

1:47:51 – 1:47:55

And you issue a stand-down. Is that is that accurate?

1:47:55 – 1:47:59

You issue a stand-down on that particular operation on Table Rock Lake?

1:48:00 – 1:48:01

A pause on enforcement.

1:48:00 – 1:48:01

A pause?

1:48:01 – 1:48:04
Assistant Secretary, United States Army (Civil Works)

A pause on enforcement so that we could assess

1:48:02 – 1:48:03

Pause on for- And a and a

1:48:04 – 1:48:05

and come up with a common sense solution.

1:48:05 – 1:48:05

Gotcha.

1:48:05 – 1:48:08

And we've had similar instances

1:48:09 – 1:48:10

not on Table Rock Lake,

1:48:10 – 1:49:12

but say for example Bulls Shoals or um Norfolk Lake or whatever, similar types of dynamics that have taken place there. So, not faulting you at all on the um cease enforcement notice. That's fair enough. The question I have is when there is a um a violation of this nature and it was so egregious that you removed the colonel from command, what further steps are taken to address this downstream of the colonel, because he may be one of two or three that are actually active duty military present in that office the rest are civilians. I'm curious what you do and how that chain of command works, and how you address that problem going forward. If you have another colonel that may be being led by the office staff to do one thing after he's been given another, um set of instructions like a cease of enforcement um what are you gonna do in the future are we gonna continue to fire colonels or we gonna look at the the office staff below the colonel

1:49:13 – 1:49:48
Chief of Engineers and Commanding General, United States Army Corps of Engineers

uh rep sir Crawford it it's a great question and uh way the again the army works we uh wanna make sure that the chain of command is responsible for the changing that culture that um should never have existed at Table Rock Lake. That is the chain of command's responsib- it is the chain of command's responsibility to make sure that those folks underneath them um aren't being overly harsh on on the enforcement of these rules, as we saw up at Table Rock Lake. That's That's their responsibility and we're gonna hold them accountable for it.

1:49:48 – 1:49:48

I appreciate that.

1:49:48 – 1:49:58

The chairman's been very gracious in the latitude of all say that Table Rock is not the only place that that's taken place. And I would also say that there is a cultural issue that needs to be addressed below the level of kernel.

1:49:58 – 1:49:59

So, acknowledge.

1:49:59 – 1:50:00

Thank you. Appreciate it.

1:50:01 – 1:50:04

Uh, the chair now recognizes Mister Detsonye for five minutes.

1:50:05 – 1:51:27

Thank you, Mister Chairman, I wanna um first of all thank you for being here in the Corps and also my deep uh appreciation and respect for the Corps' work representing a district, an area for a long time at multiple levels of government in the San Francisco Bay where the uh delta meets it. Uh the Corps has traditionally been um very engineering-like and professional to work with irrespective of administrations, uh frequently. However, um not so much today, and that's a concern for me that I wanted to bring up for Smith to tell. Um, the number of authorized projects, and this is nationally, not just regionally, um, that aren't actually getting funding is a real problem because of the unique partnership that we have here with the state and local officials, particularly in sensitive areas like the one I get to represent. So, we have asked you, the Congress, in two thousand eighteen, two thousand twenty, and two thousand twenty-four to give us an update. so we just wanna know why it is that these are authorized but funding has not been allocated given the pressure and the addition i think i mention every year is uh the addition to the change in weather irrespective of how you believe that's happening it's really important for our local and state officials to be able to do the engineering fund these projects and rely on you to get them out after they've been authorized

1:51:27 – 1:52:40
Assistant Secretary, United States Army (Civil Works)

congressman you're correct um the current uh authorized but un- unfunded total uh of our portfolio is seventy-eight billion dollars. Um that number's likely an underestimate of the work that has been authorized by this committee in cooperation with the Congress at large. Um one thing is for sure, the demand on the services that the Corps of Engineers provides is higher than the supply that we can provide. But as we just had a discussion a few minutes ago about uh forty-five billion dollars of funds that have been appropriated but unexpended, our problem is not that we need more money, all in in every case. In most cases, we need to be better at executing uh that funding. We need to be better at delivering that funding. We need to be be better at overcoming obstacles. That's why the building infrastructure not paperwork initiative that we announced yesterday is going to empower our commanders. It's gonna empower our commanders to identify which priorities are important for their district, and then we're gonna hold them accountable year to year for executing against them. And that includes moving projects from authorization to feasibility, to engineering, to design, uh, and then to construction and eventually to operations and maintenance. And so, uh, I share your frustration. That's my perspective on it.

1:52:40 – 1:53:12

Yeah, and I just, again, having been at this for a while, my hair is changed uh color it's just frustrating and engineering is engineering and to the degree that we we trust you to do the engineering side of it but the project delivery uh there sometimes is uh lack of urgency from my perspective and if it needs permitting if it's rational and makes it more efficient but doesn't we can analyze what were we may be losing from permit uh effic- efficiency and not just opening up further problems

1:53:13 – 1:53:13

S- sir

1:53:13 – 1:53:26

uh should be should be completely bipartisan and my experience on this committee is it is so from an analytical stand point let us know what the problems are and just get down and figure out what it is to get make sure we get this done

1:53:26 – 1:53:34

Sir I i- if I could just let you know my perspective. This is including in the building, it's included in the building infrastructure not paperwork initiative that we rolled out yesterday.

1:53:34 – 1:53:34

Right.

1:53:34 – 1:53:47

One of the odd things about the civil works missions, mission is that the project funding that Congress provides to the Corps of Engineers is then the also the funding that pays for the salaries of our district employees,

1:53:47 – 1:53:47

Right.

1:53:47 – 1:54:02

who are wonderful, um in most cases. Um That means that if you, if you, if this committee uh or the Congress appropriates a hundred million dollars for a project, thirty-three million of dollars of that project on average is paying the salaries of our employees.

1:54:03 – 1:54:03

Mm.

1:54:03 – 1:54:42

In my view, this c- c- can create a perverse incentive to our employees, our districts, to continue projects long be- beyond uh when they could have delivered them, because there's an incentive to always add a new bell or a new whistle, study something a little bit longer. That actually sustains the district. um, or to grab a project off the shelf that maybe isn't, um, a strategically important project in order to sustain it. And I think if we separate project, um, exec- fund- execution of project funding from, uh, the district's salaries, I think it will remove that perverse incentive and we ca- and General Graham will be able to manage his organization in a way that where delivery is the objective, not sustainment of districts.

1:54:42 – 1:55:05

i just wish as i wish we could be more analytical about this i represent an area in region nine and when you cut epa that affects everybody uh and if you get rid of really good employees because as you said not everybody is good in any organization but we've lost really good employees in other agencies that affects your work and you know that general graham just briefly how do you prioritize these projects given everything we just said

1:55:05 – 1:55:20
Chief of Engineers and Commanding General, United States Army Corps of Engineers

Uh, Representative Delsane, I thank you very much for that question. If I could just quickly go back to y- your previous question. The, one of the initiatives under building infrastructure, not paperwork, is let's get the project right at the beginning.

1:55:20 – 1:55:20

Mm-hmm.

1:55:20 – 1:56:12

I, which is what your frustration. All these projects we sometimes lose sight of this. There there's a need out in somebody's community for um, to fix a navigation project or there's a flooding challenge. Right? If we don't get the engineering up front, this committee can't authorize to build this scope of project correctly. And if we don't get the engineering right up front, we can't possibly give you um a good cost estimate. And so that's what's bedeviled us on a a lot of that seventy-eight billion dollars, is it's sitting at really immature engineering, so we haven't really told you what we're gonna go build and we certainly haven't made solid commitments on what the cost is going to be. prioritization on my end to answer your second question, sir, directly is finish what we start. Efficient funding for the work that we've been told to start is the the best way to project delivery and delivery for your constituents.

1:56:13 – 1:56:14

Thank you. Thank you, Mr. Chairman.

1:56:16 – 1:56:18

Uh, the chair now recognizes Miss Poe for five minutes.

1:56:21 – 1:58:46

Thank you, Mr. Chairman. Um First, let me just say uh I wanna thank uh both the Assistant Secretary and Lieutenant Graham for being here uh you know the work of the US Army Corps of Engineers, deeply personal for the families and small businesses in the New Jersey ninth congressional district. My district includes communities along the Passaic uh River Basin, one of the most uh flood prone watersheds in the United States. towns like Patterson, Clifton, Edgewater, Lodi and Elmwood Park have suffered from repeated and devastating flooding needing our help. Heavy rains, higher tides and coastal storms have caused repeated flooding erosions and new threats to infrastructure. When these crises arise, we need to quickly communicate with the Army Corps. Sadly, Recent politicizing effort by the Pe- Pentagon has made quick and unnecessary communication all but impossible. Now the Army Corps must get approval before even speaking with congressional offices. And here I thought this administration wanted to cut red tape instead of cause more. Fortunately, WERDA gives us a unique opportunity to streamline the backlog Army Corps' Army Corps' projects and mitigate identification challenges that have left communities like mine waiting for far too long. That is why I introduced a clean up act legislation that allows the army courts to remediate contaminated set uh sentiments under the by using an epa approved cleanup plan developed with local partners for authorized water projects assistant secretary tell's uh tell and lieutenant uh general graham this question is for both of you do you believe an epa approved identification uh waiver for the army court would reduce decades decades l old projects uh timeline like the ones we have in the lower saddle river and if yes can you please talk about how it would help

1:58:47 – 1:59:27
Assistant Secretary, United States Army (Civil Works)

congressman poe thank you for the question and um i'm not i haven't been able to review your legislation yet i'm happy to take a look Um, I will say that a project in your district, uh, New York, New Jersey Hats, which is a broad, uh, an important project, uh, large in scope, we believe may be one of the first projects in the nation to benefit from the rapid process that we're instilling, uh, as a result of building infrastructure, not paperwork. I'll let General Graham, uh, hit the specifics of that, but we actually we think we have a real opportunity in your district, uh, to start bringing uh a very complex project breaking it up into the piece parts that are most important to your constituents, get to work, and then move on to the next steps.

1:59:27 – 1:59:30

That's wonderful. Thank you uh Secretary.

1:59:30 – 1:59:37
Chief of Engineers and Commanding General, United States Army Corps of Engineers

So Representative Oh, yep certainly the East Riser ditch project as a spinoff from the Hudson River and Tributaries project,

1:59:37 – 1:59:38

Right.

1:59:37 – 2:00:19

was a great one for us to get started to better provide flood protection uh to your constituents. To the indemnification issue, uh we greatly appreciate you taking a look at that. So, under your um some authorities, if there's a contaminated area, if we go in there and say it's a sp- uh highly contaminated, um we then potentially could become a principal responsible party. And that sometimes gets us just stuck. that we can't move what's needed, uh the contamination's not gonna clean itself, and so I think exploring that topic um would be a a a great way to clean up the environment more readily and I think it's much needed.

2:00:19 – 2:02:17

Thank you, thank you so very much for that answer. Let me just say, you know, and I believe you just mentioned some some The New York, New Jersey harbor and tributary studies um is also essential, as you've just mentioned, for preparing the region for s- future storms and increasingly uh frequent uh flooding. Congress as as you know has directed the Corps in the last three wor uh wordas to leverage the HATS uh HATS analysis to address all types of flooding, for the entire study. area. Um, it is also it also requires the court to advance interim projects that are smaller in size lowering costs and prioritize nature- uh-based solutions to reduce risk in the near term. Uh, now section, uh, thirteen forty-three of the twenty twenty-four word, uh, uh, directs the court to investigate and re- recommend projects that reduce flood risk in the Hatch area. This includes examining individual flood risk and the combined heavy uh, uh, combined effects of heavy rainstorms, storm surge, river flooding, sea level r- rise, and groundwater. Uh, this directive also emphasizes not just uh preventing damage but producing new public benefits that habitat and natural uh systems as well as benef- uh community benefits like safety, resilience, and q- quality of c- of life. Uh Assistant Secretary Tells uh and Lieutenant Governor Grant, what actions does the Corps plan to take to implement the word of twenty twenty four section thirteen forty three, specifically what is the court specifically going to evaluate and recommend projects to address both, individual and combined flood risks while maximizing benefits for New York New Jersey uh harbor and tributary uh studies.

2:02:18 – 2:02:28

Well, Representative Hoyle, I'll take that start, um, we will have the East Reiser-Ditch chief's report over to this committee by, I'm tracking right now in June, I know the committee,

2:02:28 – 2:02:28

This June?

2:02:28 – 2:02:29

but this June.

2:02:29 – 2:02:29

OK.

2:02:29 – 2:02:45

Um, for us to do just that, right? Large problem flooding throughout the Hudson uh, uh, Bay, Raritan Bay, and to break that down into chunks that we can get after, certainly East Riser ditch is one we're going to recommend for approval, uh, in word of twenty-six.

2:02:45 – 2:02:51

Thank you. Thank you so very much. Um, it's vital that we work together on this. Thank you, Mr. Chairman. I yield back.

2:02:52 – 2:02:55

The chair now recognizes Mister Ezel for five minutes.

2:02:55 – 2:03:25

Thank you, Mr. Chairman. It's good to seeing both you guys here today, and I really appreciate all your hard work and the hard work of this committee. Thank you for letting me wave on. Secretary Till, non-federal stakeholders in my district are often given cost estimates from the Center for Cost Expertise. But there's no transparency into how those costs were calculated. Is there any way that we can that we can address this in WERDA, or or is this going to be a a an administrative priority?

2:03:27 – 2:04:12
Assistant Secretary, United States Army (Civil Works)

Well, Congressman, uh, I share much of your frustration. Uh, you've been a great advocate, um, for the Port of Gulfport. A lot of the work that you have done to identify this problem for us has caused us to relook and work with the non-federal sponsor to get an answer that, uh, makes more sense. I think General Graham may have t- some news to share with you there. I'm not gonna I'm not gonna get in front of him on that. Uh, but this is a challenge. Um, we have a benefit to cost ratio in both uh math problems, the numerator and the denominator um often confuse our non-federal sponsors. So I think transparency, which is exactly what we did in your district with your non-federal sponsor was to sit down at the table, share our math, compare notes, and get to a result that everybody can stand behind. Thank you. General?

2:04:12 – 2:04:42
Chief of Engineers and Commanding General, United States Army Corps of Engineers

I represent so absolutely we're looking for more transparency, more partnership with our non-federal uh partners, that as its name implies. Somewhere in that mix though is this is a contract that's gonna go out and we've just gotta be careful on some of our acquisition pricing um to make sure that that information um well, remains with the confidentiality that it deserves. But I think we can absolutely strike the right balance and become much more transparent.

2:04:42 – 2:05:10

Thank you. Uh, to follow up on that, uh, Mister Taylor. Is it an administrative priority to implement a stakeholder review of the cost estimation process? For example, Gulfport was given a cost estimate of forty million for its overhead dredging facilities. Yet there's no appeal process to help us understand where that number came from, likely because the Port and probably even the Mobile District don't believe it's accurate.

2:05:13 – 2:05:23
Assistant Secretary, United States Army (Civil Works)

Uh, Congressman Ezell, uh, I share your frustration. Again, I I think that, um, this is something we can do better at. I think we can be more transparent.

2:05:23 – 2:05:23

Yep.

2:05:23 – 2:05:31

Um, I think, uh, we could save our non-federal sponsors a lot of, uh, a lot of time and effort. if we would um share with them our math

2:05:31 – 2:05:32

Yep.

2:05:32 – 2:05:35

and uh work together. And it doesn't always mean they're gonna get a BCR above one,

2:05:36 – 2:05:36

Right.

2:05:36 – 2:05:38

but uh we can be we can do much better.

2:05:39 – 2:05:59

Thank you. Uh, I wanna turn to dredging just for a second, and the dredging material. Uh, the Gulf Coast uh, as you know, uh, could use dredging material almost anywhere. I'll ask both of you. Uh, is there any update on where the Corps is uh is with implementing uh reus reusable dredging material?

2:06:01 – 2:06:03

General Graham, I'll let you take that one.

2:06:05 – 2:06:09
Chief of Engineers and Commanding General, United States Army Corps of Engineers

Representative, absolutely. Treating dredged material not as a waste product,

2:06:09 – 2:06:10

Yes.

2:06:09 – 2:06:33

but as a valuable commodity is our absolute commitment. We have been doing about thirty percent what's called beneficial reuse. taking that mud or sand where it's in the way of our ships and moving it somewhere, usually in the environment where it'll do something good. Our goal is to get to seventy percent. So we're kinda moving past thirty percent right now and our goal is to get to seventy percent. And this committee has given us some additional authorities to do that, which we appreciate.

2:06:33 – 2:07:06
Assistant Secretary, United States Army (Civil Works)

I'll just add, Congressman Ezell, that under building infrastructure not paperwork, one of the initiatives we have is to, a couple of the initiatives we have, one, encourage non-federal sponsors ports like the Port of Gulfport or others. um, to have a plan of what they do with their dredge material ahead of time, so we're not confronting these issues in the middle of a project. Uh, we can inc- we can incentivize and encourage that type of behavior. And the other is to open up uh mitigation uh banking in a way that allows for uh more flexibility and better out- environmental outcomes when we do the work we have to do to dredge important ports like Gulfport.

2:07:07 – 2:07:39

Thank you. Uh, Mister Taylor, we talked about your initiative to build infrastructure, not paperwork. And I want to say that this is the best news I've heard coming from the Corps in a long time. I think everyone here would agree that the Army Corps needs to build, uh, or assist with building and move away from the burdensome bureaucratic process that have hindered states and local communities for decades. Uh, if I can be anything I can do to help with this, please let us know. And thank you both for your time today and all your hard work. And I yield back, Mr. Chairman.

2:07:47 – 2:07:50

The chair now recognizes Mr. Stanton for five minutes.

2:07:50 – 2:08:35

Thank you very much, Mister Chairman, Assistant Secretary Telle and General Graham, thank you for being here today. I don't have to tell either of you how urgent water security challenges that Arizona faces, how bad they are with national security impacts that go far beyond state lines, particularly with our leadership in the critical semiconductor industry. Uh, they demand quick federal action. Yes, Secretary Hegg says October twenty-five directive that all congressional communications from the Corps be funneled first through the Pentagon has interrupted regular communication and close collaboration my between my office and the Corps. Congress cannot be left in the dark on project limitation and delays in our districts. I trust our conversation today will be quickly followed by a commitment to schedule a meeting with myself and my staff.

2:08:38 – 2:08:40

Sir, we're we're at your service anytime you wanna talk to us.

2:08:41 – 2:10:41

Thank you very much. I look forward to working closely together as Ward O twenty-six progresses. Arizona and the rest of the West have long suffered a historic drought, but we are operating on an increase increasing uncertainty over the diminishing Colorado River. Negotiation over the river's future have not led to a lasting agreement between the Colorado River Basin states, despite a strong offer by Ara- from Arizona, Nevada and California. And worse, the Bureau of Local Relations' back-up plan for the river threatens deep cuts to Arizona's water supplies. Look, Arizona knows how we do more with less regarding water. Arizona's leadership in water conservation storage, particularly in high-tech irrigation and water recycling, means we already use less water now than we did sixty years ago, even with a growing population. But with these looming cuts, make continued support for environmental infrastructure assistance in the twenty-six WERDA, even more critical. In Arizona, EI dollars support meaningful drought resiliency efforts in communities and tribal nations. That's water lines, wastewater improvements, and aquifer recharge projects that will make a real difference as we make the most of limited Colorado River supplies. But getting to groundbreaking has been beyond frustrating. Just one of two dozen funded projects under Arizona EI has started construct uh construction. That is unworkable. Unfortunately, we've seen lengthy environmental reviews put hold put a hold on project Arizona needs today. I appreciate that the Corps has streamlined its NEPA processes last June. It utilizes more categorical exclusions exclusions for EI projects. But our water sister situation demands we work faster, making more improvements to expedite these reviews. Assistant Secretary Telle, how is the Corps working to ensure that EI projects funded by Congress get out the door to communities in a timely and efficient manner? What additional resources or authorities, like expanded category exclusions or flexible funding reallocations, will help move these important projects forward?

2:10:42 – 2:12:18

Congressman, thank you for the question, uh, and I will just say we uh, we, General Graham and I were recently in Phoenix together. This is a community uh, that has been figuring it out when it comes to water, since before uh Arizona was a state, before the United States of America was a country. So, uh, it's a community that understands it, uh, understands this challenge. Um, with regard to NEPA, I will say thank you for recognizing um, the reforms that we implemented last year to NEPA to follow the law, but um, But but it, as you said, it includes categorical categorical exclusions, which is sor- almost like a TSA pre-check uh for environmental review. It makes things faster. It uh uh clear rules of the road um here. This is what we're doing uh throughout building infrastructure not paperwork, is reducing the the regulatory challenges by implementing smart policies that will allow projects like this to move ahead. Um, and obviously, when it comes to environmental infrastructure, it's a, it's a different type of project, uh, and something that we, uh, you know, frankly, it's not within the core missions, the core expertise of the U. S. Army Corps of Engineers. Um, we're, we're in the business of major flood control projects, major navigation projects, major aquatic ecosystem restoration projects. uh General Graham and his team don't have particular expertise when it comes to municipal water systems. So one of the ways that we can actually deliver these projects more efficiently is by going out to the private sector folks who uh municipality would otherwise contract with for this and when Congress does provide money for this purpose uh we we believe that our private sector partners can quite often execute it much more efficiently than we can.

2:12:18 – 2:12:38

Thank you very much. I was able to secure authorization for increased spending limit for Trace Rios in the Phoenix area. in word of twenty-four, but it's been years with no substantive movement towards resuming construction. It's a critical project for my community. Assistant Secretary Telle, will the Corps commit to prioritizing funding and staff resources to finally move Trace Rios forward?

2:12:39 – 2:12:42

Congressman, I will defer to General Graham for an update on Trace Rios.

2:12:42 – 2:12:43

Thank you.

2:12:43 – 2:13:08
Chief of Engineers and Commanding General, United States Army Corps of Engineers

Uh, so we understand how important that project is with you or for you and your constituents, and the fact that that's been ongoing for a while. I don't have the specifics with me, but we're happy to get back to you on when we're moving forward. But the what I do recall is that this last increment was gonna be positively received and and we'll we'll get the exact specifics back to you but it is on,

2:13:07 – 2:13:08

I'm looking forward to that.

2:13:08 – 2:13:10

um, my radar as a very important project.

2:13:11 – 2:13:13

Thank you very much. I yield back.

2:13:14 – 2:13:17

Uh, the chair now recognizes Mister Fong for five minutes.

2:13:18 – 2:14:03

Uh, thank you, Mr. Chair. Um, Assistant Secretary Telle, uh, Lieutenant uh, General Graham, thank you for uh being here. Thank you for your leadership. Um, Secretary Telle, uh, especially for you. Uh, thank you for coming to uh my district to see uh our water projects firsthand. Um, you know, your personal attention. Um, you know, words can't describe how important that is uh to my community. I was encouraged uh to see your announcement of the Corps' new initiative of building infrastructure, not paperwork. Uh, I see this as an exciting, promising uh step towards delivering more cost-effective water resource projects on time uh and on budget as I've outlined to you just in my district alone uh there are a number of feasibility studies in the queue and cur- and that are currently underway, or hopefully will be currently underway. Uh, how do you foresee this initiative delivering more projects to the construction phase in the near term?

2:14:04 – 2:15:05
Assistant Secretary, United States Army (Civil Works)

Garfinfeng, thank you for the question. I mean, I'll just say as we were uh putting the finishing touches on building infrastructure not paperwork, there was a moment we had when we were out in your district and one of the local officials was talking about um his hope that the investments that we make today might benefit his grandchildren. And he had a realistic perspective on our program, which is it takes generations quite often to deliver things like pine flat dam, which is important to your district. I mean, it was a sad moment for me because I I I don't we've almost conditioned our stakeholders out in the field to to think that our work's gonna take generations, and it shouldn't be that way. A member of Congress who gets elected to represent their district ought to have the ability to deliver um results for their district while they're a member of congress not decades later and so i just want to tell you how much our interaction out there um in the fresno ar area really informed our perspective on how important what we're doing is and we believe this will benefit every project including uh important projects like the raising of pine flat dam

2:15:05 – 2:15:34

perfect well that's music to my ears and and certainly uh appreciate uh you acknowledging the importance of of the raise of the of of of pine flat dam Um, in the last word of bill, Congress called for expedited cert- uh, uh, called for expediting certain studies, uh, including this project, uh, but have yet to discuss a c- a cost sharing agreement, uh, with our water districts. Um, if you could, could you provide an update, um, uh, on, uh, the Pine F- Flat Dam Reservoir Rays project? Uh, can we commence, uh, the feasibility study by twenty twenty eight?

2:15:35 – 2:15:41

Congressman, I don't have the latest on Pine Flat. I'm not sure if General Graham does, but we you you can rest assured we will get you an answer immediately.

2:15:42 – 2:16:08

Perfect. Um, uh, also during our discussion in my district we touched on the potential of the Corps, uh, continuing to use, uh, forecast informed reservoir operations, otherwise known as FIRO, and incorporating airborne snow, uh, observation flights to better predict and manage snowpack, uh, which is extremely important in California, especially with the snow storms that just came through. Uh, how does the Corps plan to incorporate advanced technologies into their water control strategies uh uh especially in the western United States?

2:16:08 – 2:16:59

Well, Congressman Fong, what we learned when we were in your district uh recently was um, you know, we like to talk about Furo. It's a great tool to squeeze as much water as we can, as much flood uh relief as we can out of our existing facilities by looking at weather patterns and making uh smart judgments about when to take risk. What we really learned, though, from your district was that uh, S- S- what's called SIRO, snow informed for uh reservoir operations, is even more important. And this is where uh we or our partners uh fly LIDAR flights above the mountains, uh when there's no snow, and then we fly uh LIDAR uh LIDAR above the mountains when there is snow, and we make a determination about the snowpack. And this actually uh, as an area where we can do more and better, uh, to again continue to squeeze, uh, as much as we possibly can out of our existing infrastructure at a relatively low cost.

2:16:59 – 2:17:48

Well, thank you for that. Uh, as you know, water is life for us, uh, I represent the food production capital of California, so, uh, we look forward to the partnership, uh, in in in incorporating this new technology, um, so that we can move, uh, more water in real time a- as we get it. Uh lastly, uh as you saw in your visit, there's a significant potential to provide additional water resources in California through the Red Bank and Fancher Creek project, uh which is also undergoing a feasibility study. Uh during your visit, um I believe General Kelly uh offered his team's assistance in re-scoping the existing study to incorporate a more streamlined and scalable decision-making scope to be aligned uh with uh the transformation initiative that you've outlined. uh which would significantly reduce the budget of the existing study. Uh can the Army Corps' leadership work with the Sacramento District in reducing the scope even more while remaining compliant with the Corps' uh new initiative here?

2:17:48 – 2:18:27
Chief of Engineers and Commanding General, United States Army Corps of Engineers

Uh Representative Fong, if I could, going back to your earlier question, um when we you spoke to pine flat study, um funding will be uh one of the the needs to move that dam raised study forward, turning to Red Bank and uh Fancher Creek. as General Kelly probably talked to you about, carving off the Dry Creek uh portion of that, taking a look and see what we can do with that dry reservoir to see if we can hold on to more flood water longer and release that um for managed aquifer recharge. Um certainly that's a a bit of a low hanging fruit that we ought to work together on.

2:18:27 – 2:18:35

Well, these projects are certainly very important, I've run out of time, but uh Secretary Telle, uh General Graham, thank you for your leadership, thank you for your partnership, and I look forward to working with you. Thank you. You're back.

2:18:36 – 2:18:39

Uh, the chair now recognizes Mister Karbahoff, five minutes.

2:18:41 – 2:21:14

Thank you very much. Um, thank you Assistant Secretary Telle and Lieutenant General Graham for testifying today. When you went to my colleague, Representative Fong's district, you should have come over the mountains to paradise, which is my district right on the coast. Um, but I'm sure uh his district was almost as beautiful as mine. Uh, I represent the central coast of California, which encompasses a diverse portfolio of core projects that promote public safety, strength and economic vitality, and support Coast Guard operations and national security. Um, I I've always appreciated the work that the Corps does through Democratic or Republican administrations. You guys always do extraordinary work and oftentimes in a nonpartisan way, which is really what the American people expect. Secretary Telle, for some reason Santa Barbara harbored dredging was left out of the President's budget for fiscal year twenty-six. Despite its critical role in supporting the Coast Guard, national security, our regional economy, and coastal operational needs, I sent you a letter on January twenty-six following enactment of the energy and water appropriations bill, advocating on behalf of Santa Barbara Harbor and the four million dollars they need in the fiscal year twenty-six core work plan. I bring this to your attention to ask that you give it your full and fair consideration. I hope I can get your commitment that you will take a look at this and my office can follow up with your team on this. Perhaps you could come out to paradise, just like you did to Mister Fong's district, uh to see some of these projects. Secretary Tal, the Salinas Dam in San Luis Obispo County is currently owned by the Corps. San Luis Obispo County has indicated their interest in taking ownership of this project. We have had numerous conversations with the Corps. both the LA District and Headquarters regarding this ongoing back to my first term in Congress, in the hundred and fifteenth Congress, almost ten years ago. In the last bipartisan word of bill of twenty twenty-four enacted into law, I was able to successfully include a provision that allows the court to convey the Salinas Dam to the San Luis Obispo County Government. This was section thirteen O six of the bill. Can you provide me with an update on ongoing discussions with San Luis Obispo County regarding this conveyance?

2:21:15 – 2:21:21
Assistant Secretary, United States Army (Civil Works)

Uh, Congressman Carbajal, uh, I I I looked at General Graham, he does not have an update on that. We commit to get you one here before the end of the day.

2:21:22 – 2:21:22

Great.

2:21:22 – 2:21:40

Um, and I will say that, uh, Congressman's Fong's district is beautiful and I I hope to visit yours. I also gotta say, uh, we, uh, our pi- our the manager of Pine Flat Dam is a Son of a citrus farmer and um we managed to find our way to some oranges and some clementines and some lemons while we were out there, and I gotta recommend them to everybody. They're the best thing I've ever tasted.

2:21:41 – 2:21:54

Well, that's cuz you haven't tasted the wine in my country. The Central Coast. Should we make the law more clear, uh, as it relates to uh the conveyance uh language that I got in the bill? To help?

2:21:55 – 2:22:01

Congressman Carbajal, I'm not aware of any need we have related to legislation, uh, but we will get you an update by the end of the day.

2:22:02 – 2:22:59

Thank you. I I let me just say that it's it feels like I've we've just been going in circles on this issue, so to the extent that you could give your attention and help us resolve a clear path forward, I would greatly appreciate it. Uh, Secretary Telles, you are probably aware construction of the Lower Mission Creek project in Santa Barbara has been authorized since the year two thousand. and was later amended in two thousand and seven to reflect the cost share between the federal and non-federal partners. Despite this project being shovel-ready, our local government, having invested over eighteen million dollars in non-federal resources, federal dollars have not been made available. I understand the Corps' recent updated the principles, requirements, and guideline procedures to more accurately capture total public value and taxpayer return on federal investments. Would these new standards help with the positive PCR score for the low emission creek?

2:23:01 – 2:23:44

Uh, Congressman, we just had a an outstanding conversation with Congressman Ezell about this same issue uh we believe that I believe that we could do more in terms of providing transparency to, uh, non-federal sponsors in relation to the costs and benefits and how we calculate them. Um, we don't need to be doing this math in a black box. We need to be sharing it, uh, and making sure we're, everybody is in agreement, even if the non-federal sponsor disagrees. But I would anticipate that the updated uh guidance that you mentioned will benefit uh projects like this one, because uh we're always ab- able to take into consideration more than just the raw economic numbers and and consider other factors.

2:23:44 – 2:23:44

You're really good.

2:23:44 – 2:23:56

Thank you very much. You have a standing invitation to visit my district any time. I know traditionally administrations make visits to only members of their parties. But I sure hope you'll consider coming to my district.

2:23:56 – 2:24:02

Sir, I'm happy to do it. Uh, we we've been out to California n- uh, numerous times since I've been in this role, and I look forward to getting back out there.

2:24:03 – 2:24:04

Great. Thank you so much.

2:24:05 – 2:25:30

Thank you. The uh gentleman yields back. Are there any further questions from any members of the subcommittee who have not been recognized? All right. Seeing none, uh, the chairman's gonna indulge cuz he can, cuz he is the chairman. Just thought I'd take a couple of minutes, you know, as as I sat through this whole hearing and listened, I think y'all understand a little bit of the issues, and that's the fact that people are always asking about the same projects over and over and over that haven't been authorized and the studies aren't complete. And as a small business person, been in small business all my life, it's nice to see that sometimes you're taking a look at just what the problem is. And it may not be bad people, it may be the process. And you take an inwardly look and it's it's exciting to see that both of you are doing that. And to just look at the process maybe. Maybe we're looking at the process wrong so that we can speed up things for Mister Carbajal who probably would love to come to Georgia to get some good barbecue. But it is good to see that. And I, even though this will be my last water bill as a member of the house, or I won't be at the next one anyway, um it's exciting to s- I would love to see just how many of these projects that people just come in and sit down and say thank you it's it's completed, or it's in the appropriation phase. So with that, I appreciate you all hearing uh coming today, um thank you for your testimony, and uh this subcommittee stands adjourned.