- The subcommittee held no vote but spotlighted competing visions for expanding transmission to meet rising demand while protecting affordability and reliability.
- Rob Gramlich (President, Grid Strategies LLC) said grid congestion costs doubled and larger high-voltage lines deliver far more power at lower cost.
- Rep. Peters pressed Clay Rikard (Senior Vice President of System Planning, Southern Company) on federal planning, and Rikard warned mandates would raise customer costs.
- Republicans defended state siting authority while Democrats urged fixing federal backstop authority to lower bills and expand interregional transmission planning.
- Rising data-center demand and aging lines increase pressure on Congress to advance permitting reform without preempting effective state planning processes.
Morning digest
Get hearings like this in your inbox
Transcript
Well, good morning, the subcommittee on energy will now come to order, and the chair recognizes himself for five minutes for an opening statement. Welcome to today's hearing and we thank our witnesses for Today, this today's discussion will be an important opportunity for our subcommittee's continued work to modernize the power sector and chart a path towards energy abundance affordability and economic growth. The witnesses before us will provide practical insights into why states need to maintain authority over permitting decisions as well as the engineering and affordability considerations utilities account for through their integrated planning processes. Throughout this congress, our subcommittee has received extensive expert testimony on key issues facing the electric system. We discussed the affordability challenges for American families. We've heard directly from NERC and our grid operators about the reliability crisis. We've also examined the need for reliable energy during winter storms, and power for future industries like AI and manufacturing. Demand for reliable energy is rising faster than at any point in history. Clearly, we need more generation, transmit and transmission, and a and a great deal more of it. Significant investment is flowing into the power sector. To protect rate payers, states, utilities and grid operators alike, must employ methodical planning practices to ensure investment is going to the most reliable and affordable infrastructure needed to keep the lights on, twenty four seven three hundred sixty five days a year but today's discussion doesn't occur in a vacuum for years policymakers and stakeholders have called for permitting reforms that make it easier to build in this country there is insurmountable evidence that certain federal authorities have been in incessant impediment to the timely construction of infrastructure energy projects of all stripes are heavily litigated challenged in court in fight in uphill battle against the seemingly endless regulations The situation for transmission is no different. Time and time again, transmission development is impeded by the weaponization of federal environmental permitting laws that extend project timelines and raise costs. At the end of the day, those costs are borne by the consumer and limit economic growth. However, the term permitting reform is grounded in the idea that we need to get the federal government out of the way not to add more bureaucracy. This brings us to today's topic, proposes to federalize transmission processes and usurp state authority to serve the interest of a few while placing the costs on all. Transmission planning across the country varies depending on market structures and regulatory models. What they have that they have all in common is an extensive bottom-up planning process to produce the most cost-effective and reliable options to connect generating resources to load centers. when approaching and when approaching a reliability challenge sometimes the solution is building more transmission sometimes that solution is building generation closer to the load and like all decision making processes some options are tossed aside the phones have big wires to connect to weather dependent resources often say that they're cheaper because no one pays for the sun to shine, or wind to blow simply put if there were if this was true utilities we'd already be doing it In reality, multi-state inter-regional transmission lines can come with billion dollar price tags and bring engineering complications that raise costs and undermine system reliability. We find ourselves in a reliability crisis because of the disastrous public policies that drive out base load power and increased reliance on intermittent resources. These policies ignore the reality of transmission costs stranded us since a prematurely retiring base load power and the need for backup during extreme weather events. just like we've seen during winter storm fern. At the end of the day, these costs are all placed into the utility bills of American households. The data speaks for itself. For the last two decades, utilities the utility spending on generation has plummeted because of abundant sheet natural gas while transmission and distribution spending have skyrocketed because of intermittent energy mandates permitting reforms is necessary but we need to correctly diagnose what issues are practically inhibiting efficient transmission development. I look forward to today's discussion to examine how states are best suited to examine those costs and weigh the pros and cons of transmission infrastructure, not Washington bureaucrats. With that, I yield back the balance of my time and recognize the General Lady from Florida, the ranking uh member of the subcommittee for five minutes for an opening statement.
Well, thank you, Mr. Chairman, and good morning, everyone. Electric bills are just way too high right now and Republican policies are making it worse, so it is very important that we work together on a, to chart a course correction uh as soon as possible. One of the most important things that Congress can do to lower electric bills and address the new demand for electricity is to modernize America's disjointed electric grid the grid is old it's inefficient and its modernization is stymied by too many outdated barriers. How old? Um, most power lines in the United States are fifty to one hundred years old, and many were not built to withstand the more frequent and intense extreme weather events. How inefficient? Typically, we are using only fifty pre fifty-three percent of the existing grid capacity, because the grid is built for peak energy usage, so we are not using what we already have. Uh, and you may have abundant power generation, a state or two away, but barriers keep it all disconnected. We should improve early planning to move power where it is needed, when it is needed. The planning, permitting, and payers are too complex, and Congress needs to address it. Plus, the increases in energy demand present an opportunity to build a modern electric grid and transmission system that meet the challenges of the twenty-first century, and benefit everyone. And the good news is that when you invest in transmission you save Americans money. For every one dollar invested in well-planned, long uh long-distance, high-capacity transmission, we get five dollars back in reliability and economic benefits. These benefits aren't just hypothetical. If everyone, if every region embraced robust transmission planning, like the Midwest, we could save every household in the United States over a hundred dollars on their annual electric bill. A robust transmission grid also makes our energy system more reliable. In its long-term reliability assessment released this year, NERC highlighted how transmission can help grid planners take advantage of geographic diversity during extreme weather like winter storms. NERC called on policymakers to streamline siting and permitting processes to remove barriers to transmission development. Utilities. We intend to spend about thirty five billion a year on transmission, however most of those investments occur in siloed local projects. Essentially no major inter-regional transmission projects have been planned and built in the last decade. They made up only two percent of new lines installed from twenty eleven to twenty twenty. Two years ago NERC recommended adding thirty five gigawatts of inter-regional transfer Studies show that inter-regional transmission could save customers billions of dollars a year. And smart transmission policy insulates consumers from uncertainty. If we all agree that AI data centers should pay their own way, then let's address that so that the higher costs are not forced on ordinary consumers. Well-coordinated transmission helps the power system adapt cost-effectively to future changes. And as our grid becomes more interconnected, it will be easier to bring low-cost generation online faster and get that electricity to where it is needed. Well-planned transmission must be a key part of our energy strategy, and Congress should pass thoughtful policies to reform the ways we plan, permit, and pay for it. It is clear what we need to do. In the near term, we must get more out of the existing grid, uh, that we've already paid for. We can pass policies that increase grid utilization and incentivize incentivize the deployment of grid enhancing technologies and virtual power plants. These are quick, ready to deploy, and proven solutions that have scaled, could unlock hundreds of gigawatts of capacity and save billions of dollars annually. On transmission, we should focus on targeted policy reforms, such as streamlining streamlining the backstop authority for interstate transmission lines, while providing guardrails to protect con customers, benefit local communities, and respect state authority. Congress should clearly establish the benefits of transmission. The cost of that transmission should then be allocated consistently among con customers who benefit. We've done this with the interstate highway system. There is no reason that we shouldn't replicate that. We have the know-how. We have the experts. We can do this. This is the United States of America. These are challenging issues, but this committee should be able to tackle complicated issues on a bipartisan basis. I look forward to hearing from our witnesses today as we work towards solutions that result in a more reliable, resilient grid that can deliver affordable energy to our neighbors back home. Thank you and I yield back.
Well, thank you very much. The gentleman yields back and the chair now recognizes the gentleman from Kentucky, the chair of the full committee, for five minutes for an opening statement.
Thank you, thank you, Mister uh Chair. Appreciate um the opportunity to be here and our witnesses for being here today. The American electric system is one of the most complex machines ever built. Uh, it delivers four point four trillion kilowatt hours of power year-round, twenty-four hours a day, seven days a week to our homes and businesses. Requires one point two one thousand two hundred gigawatts of generation, three thousand utilities, sixty-four thousand miles of high voltage lines and many millions more miles of distribution lines connecting to meters. While a few, with a few exceptions, amazingly this engineering marvel was permitted and built under the jurisdiction of state regulators, not the federal government. And while the Power Act establishes FERC as a rate regulator that oversees transmission to wholesale rates in interstate commerce, decisions about physical, electric, infrastructure has been a state responsibility under federal law. In today's hearing, we'll examine the long-standing role of states permitting process and how best to ensure transmission, permitting and construction is efficient, predictable and provides affordable and reliable power. Testimony from utilities, grid operators and state regulators before the committee, uh, this Congress has repeatedly underscored their critical role of bottom-up, integrated planning, which accounts for both generation and transmission and when deciding what and where to build. As a practical matter, this enables consideration works best for what works best for communities and states that is most affordable for rate payers in those areas. As we have heard and and throughout this year there's been a lot of discussion about replacing bottom-up integrated planning and state authorities with more federal control over what and where generation transmission should be built. Part of that, if you look back at the FERC issue order nineteen twenty, is make it easier to socialize cost of transmission for renewable energy thereb- undermining state planning. I I do appreciate the the comment on the the highway system. And as you can drive, gosh, you can go I ten, goes through North Florida from Jacksonville to m- to uh California, but everybody along the way uses the interstate as they go. So we just wanna make sure it's it's a issue for us that if power lines travel through a state but they don't draw off the power line, that it's not the local rate payers paying the cost of that. So those are some things that we have to work together to figure out where we go. Uh, we're going to need more transmission. Uh, I like the system that we have and where it's been built. We are also uh open, we're gonna be discussing where we go, and we're going to need more transmission. Well, we uh, we must build in a way that works for rate payers and for uh, taxpayers, and we need to ensure we have abundant energy. We have to generate it. So what we need to come out of this next few weeks is we need to generate, so we're gonna have to permit generation. We need to draw more electrons, we need to transmit more electrons. And so that's the discussion we'll have and I appreciate um the the the discussion and the words of doing it in a bipartisan way. Uh appreciate that and I yield back.
Thank you. The gentleman yields back the balance of his time. The chair now recognizes the gentleman from New Jersey, the ranking member of the full committee, for five minutes for an opening statement.
Thank you, Chairman Lila. We're here today to talk about affordable and reliable power, something that has been seriously lacking since President Trump was inaugurated for his second term. I'm sure we all remember Trump's promise that he would cut electricity bills in half in his first year. Well, two thousand twenty-five is past and electricity prices have risen by as much as thirteen percent. And they're not likely to go down as a result of the Republicans' big ugly bill, which is expected to increase prices by another sixty percent. And just yesterday new inflation data showed that overall energy prices are up nearly eighteen percent over the last year republicans have spent the last few months scrambling to blame anyone but themselves for skyrocketing energy prices. But here's the truth, republicans are threatening the reliability and affordability of our nation's power grid, and we have to find a way to fix it. The reality is that we're simply not expanding our grid quickly enough, in an era of rapidly increasing power demand a critical way to keep power affordable for americans is to build. Yes. we need to build new power plants but we also need to ensure that the electricity from those power plants can actually move around the country to where it's needed if we don't have a big enough grid we can build all the generation we want but we simply won't be able to actually power anything with it during winter storm fern earlier this year there was ample available power in the great plains but it physically could not move to areas that needed power because of grid constraints and this led to price spikes in the mid atlantic in the southwest and texas that could have been avoided if we had a more efficient grid. It's always been important to ensure that transmission developers have the tools they need to enhance the backbone of our nation's power grid as efficiently as possible. But the challenges associated with AI data centers have firmly moved the build out of our grid from something that was simply a good idea to something that is national that's a national necessity. Our power grid faces unprecedented challenges. Unfortunately, Republicans have waged war on some of the cheapest sources of energy, just because Trump doesn't like how they look. The Trump administration has illegally thrown billions of dollars of investments, Democrats made in our power grid into jeopardy. Now, if those projects are built, they'll be paid for by higher monthly power bills for American families, just another way Republicans are increasing bills nationwide. Instead of encouraging utilities to invest in new low-cost sources of electricity, Trump's Department of Energy is forcing old inefficient and expensive power plants to stay on-line despite local grid operators and utilities often begging the administration to let the plant shut down and be replaced by more efficient and affordable sources of power. So I'm afraid the Republicans are trying to move us backward rather than forward. In two thousand five Congress recognized that the federal government should play a role in siting the most nationally important power lines. But unfortunately the new the law never worked. In the twenty-one years since it passed, not a single power plant has been built using these authorities. Surely now is the time for us to update the law to allow FERC to fulfill its intended purpose. And while we need to make it easier to build power lines, we must make sure that our process to plan them makes sense in the first place. Right now, grid planning processes are far too fragmented, utilities each exchange in piecemeal planning, resulting in customers spending a lot of money for an inefficient power grid. If we build out the grid in a smart way, it will improve reliability and affordability. So utilities and grid planners should be focused. on building more efficient and cost-effective power plants, even when those lines may cross over the territory of several different utilities, or may introduce competition that monopoly utilities would rather avoid. Finally, FERC should require utilities to engage in more efficient inter-regional grid planning and should determine who benefits from new power plans, new power lines, I should say, and therefore who is responsible for the cost. Frankly, these shouldn't be controversial concepts, uh planning smarter and make it easier to build the lines our nation needs. Should be common sense and should be bipartisan. But in any case, uh, I appreciate having this hearing today, uh, Mister Chairman. It's very important. Uh, yield back the balance of my time.
Well, thank you very much. The gentleman yields back the balance of his time. And this concludes member opening statements. The chair reminds members that presumed to committee rules, all members' opening statements will be made part of the record. The subcommittee thanks our witnesses appearing today and taking the time to testify for the subcommittee. Each witness will have the opportunity to give an opening statement, followed by a round of questions from our members. Our witnesses today are the Honorable Tony Clark, former AFER Commissioner and Executive Director National Association of Regulatory Utility Commissioners. Mister Randy S. Howard, the General Manager of Northern California Power Agency. Mister Rob Gramlich, the President of Grid Strategies. Mister Michael Skelly, the CEO and Co-founder of GridUnited. Mister Clay uh Rickard, the Senior Vice President of System Planning, the Southern Company. And the Honorable Mark Christie, the former uh Chairman and Director, Center of Energy and Law at the William and Mary Law School. Again, we appreciate you all being uh before us today and just a quick uh thing if you pull those mikes up close when you uh speak, that'd be great. And also, just again, you probably heard about the lights, uh, you each have five minutes. Four minutes uh will be green, the last minute will be yellow, and if you could wrap up when it turns red that'd be great. So again, we appreciate you all for being here, and Mister Clark, you are recognized five minutes to give your opening statement.
Thank you, Mister Chairman, uh, Ranking Member Castor, and appreciate also the attendance of Chairman uh, Guthrie and Ranking Member Pilon. It's a pleasure to be with you here today. Uh, my name is Tony Clark. I'm Executive Director of NARUC, the National Association of Regulatory Utility. commissioners and i'll be testifying in that capacity but will also be drawing on my experience uh for about sixteen years as a regulator either at the state or federal level about twelve of those years at the north dakota public service commission and a little over four at at FERC uh i'll briefly summarize my testimony there are really five main points that i make in it um the first is that on the issue of of planning regional planning inter-regional planning things like that from a a uh uh a scenario planning standpoint within and across regions states are generally um supportive of the concept of of planning it now why is that it's because state commissions depend on uh a set of facts in front of them to make decisions about what is the best mix of resources for customers so more data and more information that can form that process is a good thing now i say this even while acknowledging that there are sometimes questions about the outer limits technically of for jurisdiction in planning matters and sometimes our members may litigate some of those points, but conceptually the idea of planning, providing information to regulators, I think is a sound concept that's generally uh supported by our members. Um number two, given FERC's prescribed jurisdiction over many parts of the of the grid, states believe that the these planning exercises should build upon and work in harmony with state public policies and decisions um with regard to to planning. federal planning that doesn't build upon state decision runs the risk of of uh contravening the decisions that are made in states and can sometimes result in plans that lead to transmission plans that may be a sub-optimal answer to what the best resource is for customers states have the responsibility given our authority of ensuring that transmission distribution and generation work together to result in the lowest cost retail bill and it's states at the end of the day, who have Um, number three. States are generally supportive of common sense federal permitting reform to the degree that federal permitting reform is defined as as reforming some of those federal statutes that have uh in some cases blocked needed transmission projects and pipeline projects. Um, state commissioners have more interest in this than probably anyone, because we can see how certain investments may be able to result in lower costs for consumers. And so, once a need is established, getting that built is important. And there have been instances where federal laws have made it very difficult for the federal permitting agencies to get that done. And and so, reform of that kind I think is generally well supported by states. Um, but this leads to point number four. Uh, state commissions are generally opposed to permitting reform if it's defined as further preemption of state authority over uh these permitting decisions. We believe that that federal preemption of state authority can lead to a number of bad outcomes. Number one is with regard to that affordability issue, because that assessment of need and comparing transmission projects to other potential investments is very very important. And that by necessity has to be done at the state level because of the retail rate setting authority that we have. And number two, from a landowner access to their permitting authority standpoint, we believe that uh transmission and other projects can be much more effectively cited in a way that doesn't lean on eminent domain and condemnation by having a local permitting authority that can work through those issues, as opposed to having those decisions made here in Washington. And then finally, I would say as a general matter, uh point number five, state commissions are concerned with just the general trend greater federalization of electricity policy. Many of the cost drivers that are now showing up in in folks' retail bills are things that are beyond the oversight of state commissions, but legally have to be passed through. Transmission charges are largely a federal responsibility. Wholesale charges for generation capacity, largely a federal responsibility, especially if you're in an ISO or an RTO. Even things uh with the distribution grid where states have more authority are being greatly impacted. by decisions that are made in Washington DC about investments that need to be made on the distribution grid. So all of these things can combine to create retail bill pressure, and we think the general trend towards making dec- taking decision making from those who oversee directly the retail bill to other officials elsewhere further up the chain um is a concerning trend. Thank you.
Thank you very much. And, Mister Howard, you are recognized for five minutes for your opening statement.
Good morning, Committee Chair Guthrie, um Committee Ranking Member Pallone, Subcommittee Chair Lata, and Ranking Member Castor, and members of the subcommittee. Thank you for the opportunity to testify. My name is Randy Howard. I am the General excuse me, General Manager of Northern California Power Agency, which serves approximately seven hundred thousand customers through sixteen public utilities. and communities across northern and central California. I'm also here today on behalf of the Transmission Access Policy Study Group, or TAPS, which represents municipal utilities, cooperatives, and other transmission-dependent utilities serving communities in thirty-nine states. For public power and other transmission-dependent utilities, transmission is not an abstraction. It's how we keep hospitals running, water systems operating, and community safe and affordable every hour of every day. Your hearing title, wires, rates and states, captures exactly the balance Congress must strike. First, wires, we do need more transmission. Load is growing in many regions driven by industrial development, data centers and electrification. Generation is changing in location and operating characteristics. A strong, well-planned transmission system is essential to the reliability and to accessing least cost resources but transmission is not just about building lines faster. Done wrong, it can raise costs without delivering benefits, and that brings me to the second point, rates. Transmission is paid for by our customers. Every dollar of unnecessary transmission cost shows up in electric bills. especially for public power utilities that answer directly to local communities. That is why speed alone is not success. Permitting reforms must reinforce rather than bypass regional planning, alternative analysis, and cost discipline. If permitting shortcuts allow projects to leapfrog, planning scrutiny, consumers may pay for infrastructure that is not the most efficient, or cost-effective solution. Congress can help by ensuring that any special federal permitting ref pathway is tied to participation in regional planning and a clear demonstration that a project is the best solution among all the reasonable alternatives. And third, states. States have historically led transmission siting and permitting, and that should continue. States are closer to the local conditions, the community concerns, and environmental trade-offs. Broad federal preemption risk are more, or not less, controversy, and litigation and delays will be a big part of any preemption. That said, there are real federal bottlenecks, particularly when projects cross federal lands or require multiple federal approvals. Congress can improve the coordination, the modernization, environmental review, and establish clear timelines without displacing states' authority. Let me emphasize three additional points that are often overlooked. First, inclusive joint ownership works. When public power and cooperatives are meaningful joint owners of transmission projects, projects are better planned, sighting outcomes improve, financing costs decline, and customer risk is reduced. Second, grid enhancing technologies can help, but incentives matter. Grid enhancing technologies can increase the capacity and reliability at a lower cost in many situations. But mandatory shared saving incentives risk creating windfalls and driving up rates. A better approach is baseline expectations, transparency, and carefully targeted incentives. Third, something that's not talked about enough, but supply chain realities are constraints. Large transformers and other critical equipment now have procurement timelines measured in years. Permitting reform alone cannot overcome these limitations. In closing, permitting modernization is important, but the ultimate goal is reliable and affordable power for our customers. That means focusing on smart transmission, projects that come out of transparent regional planning, respect state leadership, evaluate alternatives, and protect consumers through established Federal Power Act standards. NCPA and TAPs stand ready to work with the subcommittee as you consider reforms that accelerate the needed infrastructure while safeguarding the ratepayers. Thank you and I look forward to your questions.
Thank you very much for your statement, and Mister Gramlich, you are recognized for five minutes for your opening statement.
OK, thank you, Chairman Latta, Ranking Member Caster, Chairman Guthrie and Ranking Member Pallone, distinguished members of the subcommittee. Thank you for the opportunity to testify and for the mandatory civics lesson for my two of my kids sitting behind me. My name is Rob Gramlich. I am founder and president of Grid Strategies, a consulting firm providing research on the US transmission grid and power markets. Uh, I would like to explain today the importance of transmission to consumers, uh, and suggest some actions Congress can take. First and foremost, uh, transmission can be a part of a strategy to reduce electricity bills. The grid is congested. Uh, congestion costs have doubled in recent years, meaning wholesale power prices are rising because of limited delivery capacity. It's like dozens of straights of Hormuz all around the grid. We see grid constraints, uh, also in the increasing time and cost of connecting new loads and generation. A few years back, Uh, in fact, when I testified in this committee maybe five years ago, it was all wind and solar in the queue, and that's probably what you heard screaming about high congestion costs and interconnection. Well, guess what? It's a very, uh, different portfolio now. It's more diversified. And if you're a gas plant or a new large load or anything else trying to connect to this grid, you're saying the same thing that they were saying five years ago. The interconnection costs and timelines are extreme. And that's because the grid is congested. Benefit cost ratios are very high, typically right now for transmission, uh because of the the congestion. If you unlock that that congestion, you can flow more power to consumers. Transmission also supports reliability, perhaps more than any other single option. Transmission lines themselves typically have ninety-nine point eight five percent reliability or availability across all voltage levels, far higher than any generation source. And then what we see in severe weather, events. We see this time and time again when there is a polar vortex or other type of severe weather. You have tens of gigawatts that are moving from region to the uh one region to the next, that is, when there is enough capacity, but often there is not enough capacity, and so lights go out because of insufficient inter-regional transmission. Uh, transmission also f- supports US global economic competitiveness in an electronic era. China, Southeast Asia, India, uh other leaders and competitors in technology recognize the importance of of grid capacity. uh They are building at far higher rates, faster rates than we are. China was building eighty times more high voltage transmission than we were in this country in the last decade and that's continuing into this decade. Planning uh can achieve the efficient scale. Larger lines deve- deliver much more power for less money. They're a massive in economics jargon, massive economies of scale in transmission. The cost per megawatt delivered is a quarter as as much for seven sixty-five KV lines versus the smaller two thirty KV lines, while also requiring a quarter as much land to li- to deliver the same amount of power. So we wanna minimize impact on communities and land use. We want the larger lines, which means you have to proactively plan for all the purposes together to get those efficiencies for consumers and efficient land use. There's a lot of talk about data centers and on-site generation, uh and islanded or off-grid types of uh solutions because a lot a lot of the new technology companies want speed to power, they want it yesterday, the grid is too slow, utilities are too slow, et cetera. Well, if you really ask them, every single one of those customs customers would far prefer to be attached to the grid. They want grid access, yes they'll do some other things in the interim, but only as a pathway to get full grid network access and if you connect those loads to the grid, you have to bolster the grid not just locally,
Mm-hmm.
but around the region. Action i- in Congress is needed. What you might say, well um, you know utilities are are great organizations and companies are taking care of this problem, why is Congress even, why are you even having this hearing? Action is needed because the fragmented grid we inherited cannot deliver what modern society needs from the power system. We have uh three thousand owners of transmission around the system. That's how the industry grew up. Uh, and yet in the eastern and western interconnection, they are two physically uh synchronous machines. They are single machines from Maine to Louisiana to North Dakota down to Florida. Uh, and yet it's almost all managed at the local level. So we're not saying federal takeover, I certainly not, but we're saying more federal coordination or just fix the federal coordination that exists, the federal backstop siting that exists in law since the two thousand three blackout congress put federal backstop in the two thousand five act it's broken it doesn't work as chairman Pilon mentioned so uh just uh fixing some of these federal authorities uh and clarifying some other things cost allocation gets uh a lot of discussion what's being discussed in the senate really just defines what the benefits are so we don't litigate for ten years over those those terms and with that my time's up thank you very much for the opportunity
well thank you very much and mister skelly you are recognized for five minutes for your opening statement
Thank you very much. Thank you, uh, Chairman Latta, ranking member members of the subcommittee. Uh, thanks for the opportunity to talk about the urgent need to build out America's grid. My name is Michael Skelly, and I'm one of the founders and CEO of a company called GridUnited based in Houston, Texas. And we develop large multi-state transmission lines, typically uh hundreds of miles long. We focus on connecting the grids that Mister Gramlich referred to. We have several grids in the country and we work on connecting the two, uh, because that's one of the best ways to get a more reliable grid, uh, a more secure grid, and a grid that can take advantage of all the resources, uh, that we're blessed with in this country. And our days are spent, uh, working with landowners, with communities, with state regulators, county officials uh with grid operators with the supply chain and with uh utility partners to put together these large uh ambitious projects and like almost all transmission that gets built we are utterly generation agnostic uh we don't check what kind of electrons would go on to our wires uh as with all types of transmission the grid is kinda open to all and if you connect a generator the electrons will flow and so um we are uh open to whatever type of generation uh might connect to the grid because we're connecting the grid as part of a a network system many many of you all on the subcommittee are uh represent areas where we're active and take a great interest in our projects and we appreciate that interest and uh Thank you for your interest in this topic. So, let me just talk for a moment about one of the big projects that we're doing called North Plains Connector. This line goes from Bismarck, North Dakota uh to Cold Strip, Montana. And we connect the eastern grid with the western grid. And when you connect these two grids, you get a much more uh efficient system, cheap power can flow in one direction, to the other and you also get a more reliable system. You've heard references to big uh uh weather induced events when one region of the country is short on power and the other region needs it our lines can help uh solve that and this is typical of other transmission when you build transmission that's bigger than the weather you can help solve some of the reliability challenges and meet new load growth that we that we very much want to meet. Um, our uh projects, we we uh on North Plains Connector, we have brought together uh ten different utilities, uh including some of the uh uh cooperatives that that Mister Howard referenced in in his remarks. Um, and we bring put the projects together and then utilities come and participate alongside of us. So, why do why does this the transmission grid matter so as i was writing this testimony sunday night i i checked in with the grid prices around the country this is a dangerous obsession i might warn you uh but in most of the midwest power prices were around three cents uh in the east the mid-atlantic they were fifty percent higher at four and a half cents uh in the west they were negative in many places because we had too much power at that time and in new england they're around five cents so these price disparities which are not atypical show the need show you that something is wrong with the system if we don't have a infrastructure that can make markets work uh then we're gonna be paying uh too much so what are the solutions these you'll you'll you've been hearing a lot about them but uh the first big solution that we gotta work on is permit reform It takes far too long uh to get projects done and our world, it's it's it we live in a world where it's not death by a thousand cuts, it's death by a thousand delays. And it just takes too long to get through processes. And we need processes that uh respect the the different layers of government, but that also help us work towards a decision. And the other issue that we need to focus on is cost allocation, because we can come up with ways to measure the benefits of new projects and the costs of new projects and we have ways we do this at a regional level we can do this at a inter-regional level to come up with projects that are beneficial to the grid as a whole, and we can come up with machi- mechanisms to determine who benefits and who should pay. Thank you very much.
Well, thank you very much for your opening statement, and Mister uh Rickard, you are recognized for five minutes for your opening statement.
Thank you, Mister Chairman. Chairman Lada, Ranking Member Caster, Chairman Guthrie, Ranking Member Palone, and distinguished members of the subcommittee, thank you for the opportunity to testify today uh on behalf of Southern Company. My name is Clay Rickard, and I'm the Senior Vice President of System Planning, where I lead both generation and transmission planning. My job is to design the least cost, most reliable system for all customers. I appreciate the invitation to testify today to share Southern Company's story as an example of a region that is using smart planning to rapidly build generation and transmission to meet rising demand while making sure growth is benefiting everyone especially existing customers. The Southeast is experiencing unprecedented growth, and our electric utilities are moving quickly to continue delivering affordable and reliable power. Today, the demand for power across our electric service territories has culminated in twenty-three thousand megawatts of contracted or late stage load. Beyond that, there are over seventy-five thousand megawatts in our queue, which, combined with what is already contracted, is more than double the size of Southern's existing system. The growth is real, and it is why Southern's operating companies are currently taking on one of the largest expansions in any utility in history bringing more than ten thousand megawatts of diverse new dispatchable resources online, including over four thousand megawatts of batteries. We're also making substantial investments to enhance our grid by building over seven hundred and fifty miles of new line, reconducting or rebuilding over thirteen hundred megawatt thir thirteen hundred miles of existing line, and installing grid enhancing technologies, or GETs. And we are accomplishing all of this without any delays in our generator interconnection queue process. In short, we are relentlessly executing to make sure the energy is there when it is needed by our customers. Just as important in meeting this growth is doing it in a way that benefits our customers, through smart planning and robust contracting We're making sure that new large customers like data centers pay their full share and that costs are not passed on to families and small businesses. With this policy in place, we have committed to multi-year rate freezes in Alabama and Georgia and further committed to customer savings of at least one point six billion in Georgia due to the results of the revenues from these large customers. We are proving that growth done right can benefit everyone. This success is due to our vertically integrated, state-regulated market structure and our long-term integrated resource planning or IRP process, which determines the least cost, most reliable energy solution for our customers. This transparent and orderly process enables us to holistically plan our system under the careful oversight of our commissioners who hold us accountable for reliability and affordability and they are best positioned to understand the energy needs of their states. In addition to evaluating all forms of generation, demand response, energy efficiency, and power from other regions transferred across inter-regional lines, our IRP process also includes long-term transmission planning designed to deliver the lowest cost, most reliable power for all customers. We run thousands of simulations to make sure that we are designing the most optimal grid for our customers. Our planning process does not prejudge outcomes. If a project makes sense for our customers, we will evaluate it. We also evaluate whether we have sufficient inter-regional transfer capability to import power from our neighbors. Importantly though, we have never been transmission constrained during a peak event. We evaluate inter-regional lines as an option, and our experience at this is that these lines have not been economic compared to other solutions. If those lines were the least cost, most reliable solution for our customers, we would build them. Congress can do two things to enable transmission and energy infrastructure. First, Congress can enable growth and protect customers by allowing state processes that deliver reliable affordable power like our state-regulated IRP process, to continue working. While we recognize that there are areas of the country that experience challenges building transmission and discussions about potential solutions are taking place we respectfully request that Congress avoid actions that would disrupt the least cost reliability-based planning system that is working well in the Southeast. Second, Congress can expedite critical energy infrastructure development, including transmission, by passing permitting reform, including changes to NEPA, the Clean Water Act, and judicial review in order to provide more certainty in the permitting and construction process. These changes would unlock transmission, especially in areas of the country that struggle with transmission development. Thank you for the opportunity to testify before this subcommittee today. I look forward to your questions and explaining more about how Southern Company's holistic planning process is delivering growth and benefiting customers in the Southeast.
Well, thank you very much for your opening statement, and Mister Christie, you are recognized for five minutes for your opening statement.
OK. Chairman Latta, Ranking Member Caster, uh, I'm gonna recognize Chair Guthrie and Ranking Member Pallone, thank you all for the honor of appearing uh in front of you again. I've spoken in front of you as a former FERC Commissioner and Chair, and prior to that I spent seventeen years as a Virginia Utility Commissioner, so I'm speaking to you from the perspective of somebody who's been both a federal and a state regulator of the very issues we're talking about today. Um, state regulators want to build transmission. I personally voted for well over a hundred transmission projects in Virginia. uh, state regulators wanna build transmission, the premise that they don't and they have to be overwritten, I think is totally false premise. There's four points I wanna make in in summary uh for you. First of all, we need to build transmission. I mean as a state regulator who voted for a lot of transmission, we need transmission. But transmission is very costly. It's been one of the fastest growing parts of consumers' monthly bills. And transmission ought to be built to serve consumers, with all due respect, not to serve transmission or generation developers. It ought to be built to serve consumers. That's my first point. Second point I wanna make. Transmission should not be considered in a vacuum. Transmission is part of the entire utility system, which has three major elements. Transmission is only one of them. The other two elements are generation and distribution. And all of those should be planned together as a process of what's called integrated resource planning. To produce a document with another acronym in this business, IRP. State regulators have been doing this for decades. I sat on a lot of IRP proceedings. And so, state regulators are in the position of balancing the needs, whether the transmission solution is the best, whether the generation solution is the best, whether the distribution upgrades might be the best, that's that's all of what goes into integrated resource planning. State regulators do that. Third point I wanna make, which is based on the previous two. So-called backstop citing authority is based on a false premise. The premise is that state regulators, number one, don't wanna build transmission, so when they say no, uh a federal agency like FERC ought to swoop in and say yes, you're gonna build it anyway. The false premise is number one, the state regulators don't wanna build transmission, they uh we do, when I was a state regulator I'd say we, state regulators do wanna build transmission. The premise of saying well let's give FERC backstop sighting authority so they can override a st- a state utility commission that says no first of all why'd the state commission say no? In all likelihood they said no because hundreds of people came out and didn't want the project built, so it's you're really overriding people that state more than you're overriding the utility commission, which is inclined to say yes. Secondly, backstop siting authority violates the very principle that the utility system is the transmission's not in a vacuum. It's part of all three elements, generation, transmission, distribution. And all three ought to be considered and planned comprehensively. And when you slice out one part like transmission and say, if the state says no to a project, we're gonna take it to FERC, and let them override the state. And I can tell you, FERC h having been there, FERC does not have the local expertise to to be doing uh permits for literally hundreds of transmission projects across this country. Fourth point. And I know that's not the the big issue today, but but it's been proposed up here. Any proposal to do like a mandatory inter-regional transmission mandate where you f- you tell FERC to enforce uh, pick two regions, pick two RTOs, and there has to be like X percent of transmission built. Again, you're taking transmission in a vacuum instead of looking at it the way it ought to be looked at which is it's a utility asset just like generation assets, just like distribution assets, and it should not be the subject of an a priori mandate that says we're gonna pick a number in order to be built. If y- if you're really concerned about consumers mandating literally tens of billions or hundreds of billions of dollars worth of transmission which is very costly, to be built through some mandatory inter-regional mandate is not gonna serve consumers. It is not gonna serve consumers. And I would add this point. Almost all the transmission that's that's built in America, certainly in the RTOs, is going into what's called rate base. The utilities, the transmission owners are getting formula rate treatment, of course. They're getting dollar for dollar recovery, plus they're getting a profit on it called ROE, consumers pay every nickel. So if you're concerned about consumers, that's not the way to go. So, he, my final conclusion on this is we need transmission. Transmission is costly. It needs to be built to serve consumers with reliable power. If you put consumers first, we'll build the transmission we need along with other utility assets. Thank you again, Mr. Chairman. I'm, enjoy being here.
Well, thank you very much for your testimony, and that will conclude our witness testimony today, and we will move into the question and answer portion of our hearing. And I will begin by recognizing myself for five minutes for questions. Uh, to both uh, Mister uh, Rickard and Mister Howard. Both Southern and NCPA work to build additional infrastructure to meet rising electricity demands. What are your greatest impediments to timely permitting construction of energy infrastructure? Mister Rickard, if you'd like to go s- go first on that. Oh, you want your mike please? Thank you.
Thank you for the question, Chairman. we are experiencing tremendous success right now, both planning with speed and executing with speed to meet this load, uh, this growth in a manner that benefits everyone. I think if there's anything that could help us, it would be providing certainty. Building energy infrastructure is capital intensive and our customers need reliable service. And so providing certainty in that infrastructure expansion, both cost and time, would be extremely helpful. And I think permitting reform, including NEPA, Clean Water Act, and judicial review could help provide that certainty, and therefore that cost protection for our customers.
Thank you. Mister Howard?
So, thank you as well for the question. We're in the midst of building a new transmission path to serve a a critical load, a military load, uh where there's a high fire risk area. And so, uh one of the things that we've seen recently is again the the NEPA reform is necessary uh we continue to have significant delays associated with that as well as the multiple agencies to participate not being well coordinated but uh what we see is it's a sequential process versus a parallel process and then once we complete a lot of that permitting activity then we have to go out and then procure the materials necessary to build the line and again we can do all all kinds of things with permitting, but until we get to a better place as to supply chain in the logistics, we're gonna continue to have very lengthy timelines associated with building new transmission.
Thank you. Uh, next uh question is to both Mister Christie and Mister Clark. Both of you have reviewed and approved uh quite a few transmission cases to the State Commissioner and regulated transmission service at the federal level. And again uh just to ask this question, why are states best suited to consider permitting with their own borders? Mister Christie? Oh, i- is your mike on, please?
I gotta learn. Um, actually I know by now. States, frankly, when you're a state regulator, you're, you are an expert at the local conditions in your state. Every one of the states is different, and so state regulators are well aware of the local conditions, the local challenges for their utility system and for their consumers. FERC is not, it can't be. Uh, it it's it can't be an expert in all fifty states the way states can. And so that's and and not only that, but again to make reiterate my point, states are the ones who conduct the integrated resource planning, where you look at the entire system, you look at generation, you look at transmission, you look at distribution, all of which are integral parts of one whole, the utility system. And states look at that in a holistic way to come out with the best deal for consumers, and that ought to be the goal. What's the best deal for consumers at the least cost?
Thank you. Uh, Mr. Clark?
Uh, thank you, Mr. Chairman. So, uh, two things I would say. Number one is the issue of assessment of need. Uh, and Chairman Christie has talked a, a little bit about that. It's, is this project needed in light of other alternatives that could be, uh, done to more equitably serve, uh, customers from a cost and reliability standpoint? So it's a neat assessment, which states excel at. And then number two is that local touch with regard to to siting transmission. Having sited a lot of miles of it and sat in a lot of those hearings, I can tell you that when it comes to electric transmission siting especially, oftentimes it's not really just pure NIMBYism, like don't build this project at all, that a landowner will will come to a commission about. It's can you move the line from this side of my pasture to that side of my pasture, because my farming operations go on here and not there, And so it becomes a poll by poll, mile by mile analysis of what's the best way to cite this particular project. States are uniquely cited to doing that sort of thing, have a lot of respect for FERC, served there for several years, they have a lot of areas of expertise. That type of expertise, citing transmission lines in the middle of North Dakota is probably not the highest and best use of a federal agency as opposed to a state one.
Well, my last twenty-three seconds, let me just follow up with you real quick. On the federal side, have you seen that happen where the the feds didn't listen to where to put put lines because uh they weren't uh in the backyard there with people in my last twelve seconds?
So, I mean, federal siting tends to be on the interstate transmission gas line side, interstate gas line side, and it's a much different process with with gas line siting. But I, I mean, just to reiterate my point, I think that states are gonna be more attentive to the individual concerns of landowners because they And if you're on a state commission, you've probably driven by that particular parcel of land however many times, because you're from the state, you're familiar with the area, you're gonna have a better sense of that, sort of local issues that that come into play.
Well, well, and thank you very much, my time has expired and I recognize the ranking member of the subcommittee general leader from Florida five minutes for questions.
Uh, thank you, Mister Chairman. I think it's very clear that the the status quo just is not working, and I hear a little bit of defense of the status quo, and I hope we can we can move uh beyond that because um costs are high and we know that our existing grid is old, it's inefficient, it's now more susceptible to these extreme weather events, putting people's lives in peril. So, Mister Grimley, you thank you for your very specific recommendations here. Um one is that I I hear general consensus on inter-regional planning. I think folks understand the value in that, can save a lot of time and money. doing s- doing that up front. It seems like you get bogged down when we're talking about the cost allocation of things. Um, how do you propose that we we solve that, because people obviously don't want to to pay in if they're not gonna receive a benefit.
Yeah, thank you for the question, and thank you for your you for your leadership on these topics over uh recent years. Um, yeah, I mean the large scale transmission uh tends to benefit many people across many states, it is a public good. It's a classic public good, meaning sort of everybody benefits and you can't keep others from using what you pay for. So if it were only a voluntary pass the hat type of recovery of cost, you know, you you put in this because you want to and you put in contribute that, you're gonna under-recover. We if you read, you know, anything about public goods across national security highways, uh, anything else, you're not gonna fund the things we need that way. So there has to be, and that's what regulators are for, and it has always worked uh at the state level and the utility specific level, uh but now as we have a more regional grid, the reality is we do have and we do need more of a regional and inter-regional grid. We need uh to clarify what FERC's authority is on that. And it's the rule is beneficiary pays. If you don't benefit, you don't pay. We just need to clarify what are those benefits and put that in law so again we don't litigate for ten years.
So Congress should
Yes.
OK. Um, uh, s- Florida is very special, uh, it's very special, but it's also special right now because people are burning their electric bills. They are just sky-high. The utilities get the highest rate of return in the country. We have a very high rate of shut-offs. Uh, also a study last year by the Brattle group found that the southeast, including Florida, is the only major U. S. region that has not pursued significant regional transmission projects over the decade. And yet, in twenty twenty four we have the FERC's order nineteen twenty that required grid operators to implement proactive long-term uh multi-value regional planning. How should grid planners in my region use the the evolving world to modernize their processes and invest in in a regional in their regional transmission systems? And if they won't do it, what should Congress do?
Sure. Well, I don't want to pick on any specific utility and i don't know enough about the specific circumstances but i will say as a general matter utilities do a great job there they tend to be vertically integrated meaning the generation transmission distribution in a vertical line work ok but they don't have an incentive to look outside that vertical silo so we have a bunch of vertical silos all around the country and there are many affordable options that tend to be outside of that silo but that utility doesn't make any money from that and you can't blame them and you can't blame them for doing what they're obligated to do for their shareholders, uh with their fiduciary responsibilities. So I think the role of policymakers to answer your question is to make sure that they do plan sufficiently outside of their borders as well as inside.
OK. Um, Mister Skelly, uh you have some experience in that uh as well, what do you recommend? And and I'm also thinking about the twenty twenty-four inter-regional transfer capability study, NERC, that NERC did, they recommended
So, um, without getting into the details of each particular region, what we can do and what we do to the way we plan the grid today is, for example, the Southwest Power Pool looks uh ahead at what where are we today, what do we need in the future, where do we expect low growth, what sorts of resources do we have. And then they plan the grid along those lines, sorta like the IRP process that we heard about from Southern Company, but at a larger scale. OK, what we don't do is take those same planning principles and use those principles to uh plan inter-regional transmission. And that's where we leave a lot of money, and a lot of efficiency opportunities on the cutting room floor. So if we can sort of widen the aperture,
Mm-hmm.
then we can identify a number of projects of better connections among the grids that uh will enable a more reliable and more efficient sort of like I talked about prices. I I think I looked this morning again, it's a dangerous obsession and prices in the mid-Atlantic were about fifty percent higher than the Midwest, okay? If we had better connections
Oh, pardon me, the general lady's time has expired.
Okay.
Thank you very much. And the chair now recognizes the chairman of the full committee, the gentleman from Kentucky, for five minutes for questions.
Thank you very much. I appreciate it. And and and I think all of us on on this committee understand we need massive amounts of new power. So it can be affordable and the and the grid needs to be um updated and it needs to be fixed. And so we're Uh, that's what we agree. We're trying to go how do how do we get there? And so that's why we're having this hearing, cuz I'm trying to learn. And so as we look at, we know we need to update the grid, but I'm trying to understand what we're trying to fix with transmission uh reform. And so for Mister Clark, you know, the proponents for FERC permitting the inter inter-regional transmission say there'll be reliability and affordability benefits, and rate payers should pay for those benefits. From your perspective, what's missing from the cost allocation argument uh when assessing what's best for rate payers?
Mister Chairman, thank you for the question. So I think there are - there are sort of two issues. One is, with regard to cost allocation, it probably does make more sense to have better signals for what cost allocation will look like for projects so that they and the regulators who oversee them know exactly how those costs will be allocated out. And perhaps there can be more signals in certainty given from FERC with regard to - to cost allocation. But there are Cost allocation is a separate issue from the question of what other alternatives could be built that might better serve customers. Sometimes the big transmission solution might be the right answer.
Mm-hmm.
There may be other times where locating generation closer to load, or maybe a state has had a public policy where they support nuclear, they want gas-sided closer to load, or they wanna lean into energy efficiency and and demand resources and non-wires alternatives. all of those things have to be taken into consideration as well, and that really is what falls to states to assess and to state commissions to assess. So I think that's a very, very important part of the uh equation, and that we worry about greater federalization perhaps encroaching on that, because once the federal government selects a f- a line, cites the line, but it is it's not well integrated into what the individual states are doing, you can end up with a less cost-effective solution for customers than if it works within the state planning process um that drives towards least cost planning.
Thank you. So, uh, this question is for Mister Reichert. I said that correctly, right? Yeah, I knew some Reicherts back where I grew up, so maybe that instead of Rickert, Reicherts. So, Mister Reichert and Mister Howard, uh, you each plan for different types of utilities in different regions, Southeast and then California. So my questions are too, if you can answer it. So integrated planning enables you to evaluate the best options for rate payers? Generation, transmission, et cetera. Is is that the process you follow, and why is integrated planning critical for building utility infrastructure? So, Mister Reichert, if you wanna go first.
Integrated planning is critical for designing the least-cost most reliable system for our customers. We enjoy the benefits of all of our planners sitting around the same table, generation, transmission, distribution, and fuel, working off a common set of assumptions and inputs, to design the fully integrated optimal solution. In this era of rapid growth and significant growth, it's important that when we're designing transmission, we know where the generation's gonna be sided, and we know where the load is going. Without that insight, you would lead to a suboptimal plan and therefore additional cost for our customers that they can't bear.
Mister Howard?
So, similar in California, for our agency where we have sixteen different utilities, many of the utilities develop their own integrated resource plan, they meet regularly with their customers so they understand where the growth is, the timelines of that growth, we look pretty far out into the future. At our agency we combine all of those various uh integrated resource plans and make a master, we bring that forward to the California ISO as part of the transmission planning process, we identify types of loads that we believe we're gonna see the timelines we're gonna see those we also try to identify what are the types of resources that we're gonna need for meeting those loads because it might not all be the same some of those loads are just during the middle of the day some of them are twenty four seven with a large load like a data center so we try to identify what will be those resources we're gonna need where those resources located and then what is the best solution sometimes again it could be a transmission line sometimes it's building local sometimes it's better building a new gas line in, build a local generation versus building a transmission line.
Thanks, I'm about out of time. Oh, that's Mr. Christie. So, uh, so we do have these big weather events and it may be really cold one region of the country, not as cold any other, so you can move power. Is there a role for the federal government in in transmission lines in terms of just being able to move power around the country as we need it? Or can that happen with the local planning?
I think the role for the federal government is embodied in the federal power act, FERC's job is to be a consumer protection agency and protect consumers from rates that are unjust and unreasonable for both transmission and wholesale sales that's that's what the federal power act says the planning
Mm-hmm.
process we have RTOs who actually do a very good job at planning certainly PJM historically has done a very good job at planning I've always had a lot of respect for PJM planners and to follow up on your question on cost allocation Mister Chairman um as a Virginia regulator in PJM Cost allocation worked fine as long as PGM was designing projects that serve consumers with reliable power. The curveball that came in is when they were told to start planning projects to incorporate state public policies. Then, that's when cost allocation became a much tougher nut to crack.
Oh, excuse me, the gentleman's time has expired and yields back.
The chair's expired, you're back.
The chair now recognizes the gentleman from New Jersey, the ranking member of the full committee, for five minutes for questions.
Thank you, Mr. Chairman. For years, Democrats have called for reforms to the way our power grid is permitted, planned and paid for, and I'm glad the Republican majority has finally decided to have a hearing on this topic. But a hearing is not enough. We actually have to make policy changes, not just talk about them. But, Mister Gramlich, uh, I was struck, uh, by a mention in your testimony where you talked about how the cost to deliver energy over a high voltage transmission line are just a fraction of the cost of delivering energy over a smaller less efficient line. And Americans are hurting due to the sky-high electricity prices that are we're seeing. So, planning for a more cost-effective grid makes a lot of sense to me. So, uh, let me ask you a question, Mister Gramlich. Can you talk about how regional and inter-regional grid planning requirements can drive investments towards cost-effective lines and away from inefficient investments? and why do we need these planning rules to dissuade utilities from building a more fragmented, expensive power grid? I have three questions for four minutes and I'm gonna come back to you, so maybe a minute or so.
Thank you for the question. Yes, there are massive economies of scale and the larger scale transmission, which means if you plan proactively to to achieve all of your uh short, medium and long-term needs and multiple purposes, reliability and economic needs, then you can uh plan those higher voltage lines that are that are much more efficient uh utility incentives matter in this regard as well they uh they definitely get to own and build uh what is in their local area they don't necessarily get to own or build what is outside the region so we've seen uh a trend where uh there's little bit more activity in fact we're spending about thirty billion dollars on transmission around the country country but almost all of that is on the local system and not so much on the regional and barely anything on the inter-regional system.
Well, thank you. I'm gonna come back to you, but I wanted to go to Mister Skelly. I'm glad we have a witness today with experience developing power lines outside of the traditional utility model. And one thing you mentioned in your testimony was the importance of having a one stop shop for federal coordination of permitting efforts, similar to the role Fert plays for natural gas pipelines. So, my question, Mister Skelly, is why is that one stop coordinating role so in getting projects across the finish line and how can we enhance it.
So, uh, we have a couple of projects that are working through a system called SITAP which the DOE uses under the Energy Policy Act and, uh, that process is moving fairly quickly. We the project that I mentioned a few minutes ago, uh, will be less than two years in and out of the NEPA process. And that's thanks to really great leadership on the par on the part of the Department of Energy. Um and but that's a permitting process, okay. That that process does not confer rights of eminent domain or some of the other issues that that we've heard expressed concerns about. It's just a coordination of the dozen or so federal agencies. Uh, it's important because it's a there's a federal entity that kind of leans in and wants to make a project happen. So we find that that uh leadership is is is really important and helpful to move things along.
All right, well thank you. And I I wanted to go back to Mister Gramlich again, but I I wanted to point out that a lot of the ideas Democrats are talking about today aren't that drastic. Fixing the backstop transmission sighting authority that we gave for two decades ago just seems like common sense to me. But my question, Mister Gramlich, would would a fixed to first backstop citing authority to make it usable really be that radical given the trump administration's proposals related to connecting data centers or forcing coal plants to stay online
i mean as you say it would be just fixing an authority that's there a lot of the the theme of a lot of permitting reform is streamlining right and the national interest electric transmission corridor program as doe go through a whole process with nipa one agency and then for the same line, first go through the whole same, it's the double NEPA. What's the point? Just streamline that.
All right. I appreciate it. Thank you so much and thank you, Mr. Chairman.
Well, thank you very much, the gentleman yields back the balance of his time, the chair now recognizes the gentleman from Georgia's twelfth district for five minutes for questions.
Thank you, Chairman Latta, uh just for holding this important hearing today to discuss transmission Policy I thank the witnesses, particular Mr. Rickard uh from Southern Company, my uh home state of Georgia, Georgia Power, for your test testimony before the subcommittee. Uh, as our energy demand increases, it is critical, and I think we all recognize it, that we build the infrastructure necessary to meet uh the growing demand. I'm a big proponent of how we run our energy policy in the Southeast, uh, and that is why Georgia has been named the best to do business in twelve years in a row. Folks, it's all about energy. And, uh, the result of strong state oversight, integrated planning by the utilities has resulted in significant econ- economic d- development while also protecting our everyday customers. This has resulted in Georgia Power committing to freezing and, uh, unlike, uh, as mentioned here earlier about electricity costs going up, look what we're doing in Georgia. at least one point six billion dollars in cost savings for our customers. Maybe Washington needs to come down to Georgia to see how we're doing business.
One hundred percent.
I read your testimony and I appreciate the detail about how you planned transmission systems for Southern Company. A lot of what this committee and our colleagues in the Senate have considered around transmission seems to be trying to fix problems that Southern Company and Georgia Power have already solved. You're not having tr- transition uh constraints, you're not having interconnection queue delays, and you're not uh and you're able to get generation connected quickly. I mean, we had the worst hurricane in history in my district, hundred and fifty years we haven't had a hurricane, and we had power back in ten days, and it wiped out everything. You have the right amount of transition, transmission that you need to be able to import power from your neighbors, but you do not have more than you need, which would result in higher costs for your, our customers and and and my constituents. Mister Rickert, can you please explain how your planning process works in detail and why it has already solved the the the issues that much of this legislation we see around transmissions trying to address?
Thank you very much, Representative Allen, and We would love to host this subcommittee in Georgia any time you wanna come down.
Yes, sir.
Thank you for that. And we're very happy and we're very proud of the success you just mentioned. And I I will tell you, I think it stems from one advantage the Southeast has that other regions don't have. And that is our vertically integrated, state-regulated business model that allows for holistic integrated resource planning. Again, like I said earlier, all the planners working together to find an integrated optimal solution that results in cost and high reliability. I think our transmission planning process is a perfect illustration of how that coordination works. And if you don't mind, I'd like to quickly walk through that.
Yes, sir. Mm-hmm.
It starts with understanding the demand, understanding the growth. But not only the magnitude, but where it's going. We have multiple data center customers that have peak loads greater than a gigawatt. That is larger than a single unit at Plant Vogel. And transmission is highly location dependent. It matters where you put the load. But then the second step is for us to model our entire system. We model every line, all twenty-seven thousand miles of line, enough line to go around the earth. We model all thirty-seven hundred substations. But more importantly, we model all five hundred and fifty discrete generating units. And that's not just the existing generators. that's the ones we're planning for. And that's the value of our generation planners and our transmission planners working together, because that transmission line is only as good as the generator on the other end. Once we have that model, we can then run thousands of simulations to account for things like a simultaneous loss of a line in a generator, so that we can keep the lights on in all those situations. And by modeling that, simulating that, we can see where does a constraint occur on the system. Whether it's a thermal overload or drop in voltage support. Once we identify that constraint, we then look at our entire menu of solutions. There is no one size fit all solutions for a complex energy system.
Mm-hmm.
We look at standard conductors, advanced conductors, grid enhancing technologies, and we apply the right solution for that constraint. The result is we are embarking on our largest transmission expansion in the history of our company. we're deploying seven hundred and fifty miles of new transmission, reconductoring or rebuilding over thirteen hundred miles of existing, and over half of that is advanced conductors,
Mm-hmm.
and we're the industry leader in grid enhancing technologies.
OK. Well, I'm out of time.
OK.
Uh, don't wanna cut you short, but I noted too what you were requesting Congress to do. We need to get this done so you can continue this progress and hopefully uh others will
Thank you very much. The gentleman's time has expired and he goes back.
Thank you.
The chair now recognizes the gentleman from California's fiftieth district, with five minutes for questions.
Thank you, Mister Mayor, I do wanna thank you for having this hearing, um, it's it's uh been something I've looked forward to for a long time. Um, here's our challenge, the North American uh Electric Li reliability Co- Corporation or NERC has said that an additional thirty-five gigawatts inter-regional transfer capability across the country would reduce grid congestion, lower cost for consumers, and generally enable us to to better meet load growth. Um, a a recent a recent um study showed that transmission connections among US regions would have saved in twenty twenty-two between five point eight and seven point one billion dollars. That's when natural gas prices were a little higher. In twenty twenty-three, between three point four and five billion dollars in twenty twenty-three. The issue we have is that we have a national interest in inter-regional transmission. A lot of the discussion has been um about uh in-state or very localized transmission. But we up here in Congress, we have to figure out a way to recognize these savings and build out inter-regional transmission at least to the to the extent of of thirty-five gigawatts. And I'd ask unanimous consent that we can uh admit to the record a utility drive write up of this study that says more regional inter- more inter-regional transmission could save consumers billions.
Without objections to order.
Um, Mister Skelly, there's a there's a process in theory that's outlined in in law that they, we do these national quarters of interest where the government decides where to site um to site uh power lines where the government decides what's needed you're actually doing something called merchant building, where you look at the market and you try to as a business matter connect um one place or another where you decide as a as a business person what the need is when you do a multi-state transmission line can you tell us what permits you need and what agencies you need to work with and how those challenges contribute to the willingness of companies to invest in transmission
uh yes so let me just reference back for the study that you mentioned so the what you said is with this investment you get huge savings that's generally our experience is that we're able to show that if you connect two spots on the grid that are not connected uh otherwise, that this produces big savings and that's why we're able to attract utilities that wanna invest in the projects because that produces savings for their customers. So I completely agree with many of the findings in the study. So what we do um is we work through the process. So we get out and we talk to landowners, we we work to to find a route that works for them, we heard mention of you know the front of the pasture the back of the pasture that's the kind of
yeah right
stuff we're doing all day every day then we work with uh counties to get county approvals sometimes there's uh township approvals as well uh then we'll go through a state siting process where you go to the state commission and uh you uh propose a project and and they look at your routing and how you came up with that particular route uh
what are the what are the federal obstacles to what you
it's a And then at the federal level, we would have on a given project probably a dozen different federal agencies that would have a say on the project and and whether or not um the impacts of the project
Right.
are too much or pro- really properly considered.
Right.
And then they come up with a record of decision. So we're in the middle of those processes.
And then we wou would be helpful to you if the federal government had standards by which we judged who pays For the benefit, right?
Yes.
OK. Mister Gramlich, what is the big number one barrier to connecting new energy resources to the grid?
It's really transmission capacity. Uh, there's been a lot of work on the process and further work I think would be helpful on the process of generator interconnection. Uh, but really what we find, uh, especially if you look at when, uh, say, uh, an RTO actually plans transmission and the lines get approved in the plans, automatically the generator interconnection quickly becomes faster and cheaper because those lines are assumed and you don't have individual generators having to pay for a regional network that benefits everybody across,
Right.
you know, a dozen or more states.
Just for record, I just want to compliment you on your testimony. I thought it was very well written and, um, very impressive. Um, there's nothing about a federal process that wouldn't that could s- that was trying to do inter-regional transmission that might say as you as you suggested in your testimony, uh, inter-regional is appropriate in other places, but maybe Georgia's good on its own, right?
Uh, no, no, sir. I would we are I would respectfully disagree with my fellow witnesses here. We are highly incentivized to look at any solution that is for the benefit our customers.
I'm just saying if we had a federal process that tried to
I'm just saying.
decide where to put inter-regional transmission, a federal process that took the evidence you gave us in your testimony might say, okay, maybe Georgia doesn't need inter-regional transmission, right?
If If it is a line from California or a string on a kite, if it's a good deal for our customers, we will evaluate it.
OK. I'm just saying you're not, you're not gonna be forced to do anything if, if the, if the numbers don't show it, right?
Our concern about prescribed outcomes is it will lead to costly solutions for our customers. And we think our integrated resource plan results in the best cost solution for our customers.
Ho- hope you'll accept my question as a statement then, cuz you didn't really acknowledge it. But I think there's nothing about a federal system of planning that would require you to do anything. And I would just say, um, I hope we can solve this, cuz it's part of a bigger plan to get a lot of the other things that you need, including NEPA reform and um, pipeline reform. Uh, let's see if we can't come up with a solution other than leave it the way it is. I yield back.
Thank you. The gentleman's time has expired and yields back. The chair now recognizes the gentleman from Alabama sixth district, five minutes for questions.
Thank you, Mister Chairman. Um, Mister Rackert, your testimony mentions that all transmission in the world cannot fix generation shortfalls. You also note that during Southern Company's peak events, transmission capacity was not so much the concern, but there was not excess power to buy from other regions of the country. Building more transmission has been a debate in this committee for years, but it seems to me the problem is more about the need to build dispatchable base load generation. Uh, can you expand on that, if additional transmission would have solved the shortage and explain how you're making sure that the company has enough generation to uh serve the customers.
Yes sir, thank you for the question.
That's I'm a customer.
Very certain. Transmission, again, is only as good as the generator on the other end. And much like our transmission planning process, our generation planning process is just as robust. One of the key metrics for resource adequacy is something called reserve margin. It's essentially the percent of capacity you carry above your projected peak load. It's your insurance to account for things like extreme weather events or loss of a major unit. We go through an extremely detailed analysis to figure out what is the economic optimum amount of insurance we should carry for our customers. If we're overinsured, we're gonna crush them with cost. If we're underinsured, we expose them to more reliability events. And by the way, we have not shed firm load since nineteen seventy-seven and we're very proud of that. The other step is technology provides a different value proposition. There's a difference between capacity and energy. Capacity is knowing that on that cold winter morning, when we need heat, that I can go to that technology and it will produce megawatts. Firm dispatchable capacity like gas generation has higher capacity value than say an intermittent resource. But intermittent resources have energy value as well. So we are gonna always pursue an optimal mix that not only hits that target reserve margin, but at the lowest cost. And I think the thing that really differentiates us from the rest of the region is everybody has a target reserve margin. We're the only market, a vertically integrated state regulated market, that has the mandate to build or buy to meet that target reserve margin because our state regulators hold us accountable for maintaining reliability, and that's why we haven't shed firm load since nineteen seventy-seven.
Well, one of the things about building transmission lines and usually when we're talking about it in this committee, um it's about um wind farms or solar farms and uh we don't talk so much about it uh in in the context of of what we need uh in terms of the dispatchable power. And one of the things that that I think gets lost is the longer the transmission line the less efficient it is in in in delivering power. I also look at at um the whole issue of of battery storage. um again most people think of that in the context of renewables when the wind's not blowing or the or or the solar panel's not producing the power you need but it's also essential for peak periods uh uh even with dispatchable power and i i think uh southern company's doing a lot in that area um one of the the the things that i wanna ask you about is to to just highlight is what southern company's plant vocal is doing and and as you mentioned there are reliable, sustainable, scalable energy is is one of the most prominent needs in the US. Nuclear energy is is is one of the options to see that through. It's the first newly constructed nuclear unit in the United States in in a lot over thirty years. Uh, so what do you believe has been the key to success in initiating the commercial operations and and and and it's also a model. I mean, I met with uh representatives from Poland, they wanna they wanna build a Vogel type. uh generator in in Poland.
Yes, sir, I think the c-
Only got a minute left if you could be as concise as you could be.
Yes, I think the key to our success again is our vertically integrated model and our constructive state regulatory environment. Plant Vogel is twenty-two hundred megawatts of carbon-free energy, but it's also firm dispatchable capacity. It will be there on that cold morning. And working with our regulator we were able to demonstrate that value and also drive that to completion. And it is going to be an asset that operates for eighty plus years, and it's tremendous value to the citizens of Georgia.
You're looking at seven hundred and fifty miles of new transmission. That's one, that's not one transmission line. That's multiple transmission lines. I think it's important to note that, because uh with the permitting uh problems that we've got right now, it takes ten to twenty years to build uh uh transmission lines. But it I'm also very concerned about our reliance on China for critical components. And a lot of the components that that we manufacture here are reliant on China for rare earth elements and and critical minerals that that only China processes and refines. So are those uh some of the concerns that you have about uh some of the company's ability to build these transmission lines? Uh having be being able to get it done in a reasonable amount of time, having um a cert- a level of certainty that that will not drive capital investment away, allow you to get affordable money.
No, sir, we are open for business and we will remain open for business because we're coordinated and we s-
Well, I'm I'm sorry, the gentleman's time has expired and he goes back, and the chair now recognizes the gentleman from New Jersey's eighth district for five minutes for questions.
Thank you, Chairman. Building out and upgrading grid infrastructure is a key piece to meeting addressing sk- addressing skyrocketing energy bills and growing energy demands from AI data centers. Mr. Gramlich and Mr. Scully, just yes or no, would you agree that building transmission is essential to meeting growing electricity demand?
Yes. Yes.
And we hear from Republicans on this committee about the need to compete with China when it comes to energy and the AI race. That's their justification for propping up fossil fuels and attempting to revitalize coal despite China's embrace of all types of energy. Mr. Gramlich, your testimony describes China's effort to build out transmission lines. Would you say that China is outpacing us in terms of building out transmission?
Absolutely, by a lot.
Yeah, according to the New York Times, China built roughly twenty-five times more transmission than the United States. They're connecting energy from where it is to where it is needed. So China is building out their inter-regional transmission to take advantage of all types of energy sources. Mister Gramlich, would building out inter-regional transmission help us meet our growing energy needs and in turn help us to compete with China?
Absolutely.
And building out our grid and inter-regional transmission can help lower energy bills in the process. Is that correct?
Yes.
Could you briefly describe how?
Uh, it provides access to cheaper generation, which is not necessarily always one generator in one location. It goes both directions. At any given time, the cheaper generation might be to the east or the to the west. Transmission is bidirectional. So at any given moment, transmission allows access to the cheapest generation.
Matching supply with demand.
Yes.
Um, House Republicans and President Trump have spent the last sixteen months rolling back investments clean energy to prop up fossil fuels cancelling hundreds of energy projects across the country and now they're arguing against inter-regional transmission which will allow regions to tap nearby generation sources with lower energies but by contrast china is embracing all forms of energy and rapidly building out the necessary infrastructure to connect resources to where they are needed meanwhile house republic and president trump are actively hamstring our ability to harness all tools at our disposal to truly compete with china to bring down energy costs and our proactively uh choosing energy winners and losers in the process despite almost every witness before this committee agreeing that we need an all the above strategy to energy production in this country now let's talk about permitting reform. Mister Gramlich, can you talk about the need for meaningful permitting reform to deliver the grid upgrades we should all know we we should all know we need?
yes i mean simply uh we like to describe it as the three p's planning permitting and paying
Yeah, there've been good bills and there've been bad bills. Last year, Republicans attempted to pass a permitting package that only helped the fossil fuel industry, and did nothing to support cleaner and cheaper energy, that is needed to meet skyrocketing demand. They even went as far to amend the bill to
A technology neutral approach would be far better.
Yeah, I agree. We need to have meaningful discussions on permitting reform, but that's hard to do when House Republicans and the Trump administration have yet to show they can be trusted to implement any deal in a way that is balanced and does not harm cleaner and cheaper. energy since trump took office electricity prices have risen as much as thirteen percent nationwide in new jersey electricity bills have risen as much as twenty percent and the one big beautiful bill as described by republicans is expected to raise electricity prices sixty one percent over the next decade and for the folks back home those who are listening if you hear about trump's ratepayer protection pledge know that it is nothing more than a handshake deal with big tech companies. Instead of thinking about a balanced, comprehensive approach to America's energy policy, Trump and House Republicans are more occupied with settling political scores, and in doing so are crushing Americans with increased energy costs at a time of an affordability crisis. And yesterday, the President said the quiet part out loud when he stated that he doesn't think about Americans' financial situation. Unfortunately, House Republicans in this committee and in this Congress, their actions have shown they don't care either. Thank you, now you're back.
Well, thank you very much. This gentleman yields back the balance of his time. The chair now recognizes the gentleman from Ohio's twelfth district, for five minutes for questions.
Thank you, Chairman Latta, and and thank you all for being here today. My first question and just uh is for Mister Howard. Mister Howard, thank you for being here. While Ohio does energy policy differently than California, I think we can agree on one thing, you'll you local utilities matter. Based on your experience, what practical value does regional and local expertise bring to planning and setting transmission lines that a federal agency like FERC, no matter how much staff or authority it has, just can't re- complicate from Washington, replicate from Washington, excuse me, sir.
Thank you for the thank you for the question. Um, excuse me. i think as we've stated earlier uh the integrated resource planning from the bottom up uh really identifying what are the needs what are the types of alternatives we have available to us those are very well done at the local level in determining where those resources might be located that we wanna access and then bringing that up to what what is the transmission that's necessary what is the size of that transmission can we do it through upgrades of existing versus building new looking at all those options we're really better at the local level and the regional level to do that.
Thank you, sir. Appreciate that. Uh, my next question is for Mister Christie. Mister Christie, thank you for being here. Some folks seem to think that renewable intermittent projects and uh and the inter-connection cues could solve the resource adequacy problems facing the g electric grid all on their own. During your time at FERC, you worked on order twenty twenty-three to modernize the d- generational inter-connection process. What do these thousands of giga gigawatts of renewable energy mean to resource adequacy and what problems do you see facing the interconnection queue process?
Well, we made a lot of progress under rule twenty tw- twenty twenty three. The queues have been rationalized. The whole point of twenty twenty three was to go from a a first come first serve to a first ready first serve, so that the generators who were ready to go, they had financing, they had site control, would would move up to the head of the line. And we already see in PJM, for example, they had about sixty gigawatts of new applications that were ready to go. So it it twenty twenty-three, I would tell you, is is is working. The issue about, you know, intermittent versus, uh, dispatchable, we we have to have dispatchable resources because there's a huge difference between energy value and capacity value and you have to understand that to understand how to evaluate a generating resource. Wind and solar have very good energy, uh, values and they're and they're cheap, they have low marginal cost, but they have very low capacity values. uh you have to have the dispatchable resources like gas, nuclear, to have and coal to have the the the capacity value. Now in PJM, and I'm very from PJM, coming from Virginia, um PJM has retired way too much in the way of dispatchable resources over the last twenty years because of the of the market structure that's an hour long conversation but we have to have both we have to have sufficient dispatchable resources with high capacity value uh, to make sure that the lights stay on. That's literally a reliability issue.
Thank you, sir. I appreciate that. Um, my next question is also for you, Mister Christie and Mister Reichert, and I'll let Mister Reichert go first. Um, there has been a reference to the NERC findings that increasing inter-regional transfers of power will benefit reliability and affordability. Would you each comment on whether FERC should mandate some amount of inter-regional transfer capacity based on the this congressional requested study? is the first question and then to follow up with that is, and is there a way to plan the system without federal mandates that will better assure reliability and affordability for our constituents? And Mr. Reichert, you may go first, please.
While we appreciate the NERC study, it is admittedly by NERC incomplete. It fails to consider cost-benefit analysis. As a part of integrated resource planning, that is all we do. We do a full accounting of the cost and the benefits. And our concern with a federal mandate is it will prescribe outcomes that are uneconomic for our customers, and that our IRP process already finds the least cost solution for our customers, and our state commissioners hold us accountable to do that.
Thank you, Mister Kusty.
The NIRS study didn't didn't say that we needed a a mandated minimum amount of inter-regional transmission. What the NIRS study said was we need inter-regional transmission. I agree with that. Of course we do. We already have inter-regional transmission. During Hurricane Yuri, a power was shipped from PJM into MISO and from MISO into SPP. So we have inter-regional transmission, we need more inter-regional transmission, but the point Nurk was making, and I would certainly make that point too, an inter-regional line needs to be evaluated individually between the two planning regions to make sure that line is the most cost-effective for consumers. That's the way you do any utility asset, is you look at the facts of the individual asset, whether it's transmission, generation, distribution, and make a decision that serves consumers, not some pre-existing mandate before you've even looked at the facts.
Agree. Thank you both very much. Mister Chairman, I yield back.
Thank you. The gentleman yields back. The balance is time. The chair now recognizes the gentleman from California's fifteenth district with five minutes for questions.
Thank you, Mister Chair, thank you to all the witnesses for being here today. There are indeed major challenges to building transmission lines in this country and as many of you have noted, uh, we need solutions to improve the permitting, planning and proper allocation of costs for grid infrastructure. One promising approach is to cite transmission lines on existing transportation rights-of-way. For example, near railroads and highways. This could eliminate pushback from private landowners, make it easier to access for maintenance, and may unlock new financing models for transmission. Several states, such as Iowa, Montana, Wisconsin, and others have recently passed laws allowing dual-purpose rights-of-way. So, uh, Mr. Gramlich and then Mr. Reichert What are some challenges to building transmission and infrastructure on transportation rights-of-way, and how can Congress help address that issue?
I think uh building transmission and highways is a pretty daunting challenge for most develop- there are many uh rules and regulations that apply. Any effort that the federal DOT or state DOTs can uh execute to make that easier would be welcome and is often a very good solution there's a great line on I-ninety-four in Wisconsin,
Yes sir, thank you for the question. You know, physics determine transmission paths? But we are highly interested in any time we can expedite transmission siding, transmission construction, and we're very interested in this potential legislation how we could our customers could benefit from it.
We know nothing is easy in this regard, but um I introduced a bill earlier this year directing the department of energy to lay the groundwork for a path forward with this approach. And I look forward to working with my colleagues, hopefully in a bipartisan way to advance that effort. So, um, I'd like to now focus on grid component supply chains, a challenge some of you noted in your testimony. Right now there is a nationwide shortage of transformers, circuit breakers, cables, and other materials that has doubled in prices and pushed procurement lead times out by years. If Congress is going to address uh this issue, we have a few levers to pull, for example incentivizing domestic manufacturing, investing in workforce development, and accelerating the commercialization of new grid technologies. So uh, Mister Skelly, then Mister Howard, if you will, could you describe the supply chain challenges your companies are facing right now, and more importantly, how federal support could help alleviate those challenges?
So, uh, these challenges are real. Uh, it's it's very difficult to get, uh, everything from towers to wires to, uh, HVDC equipment that we rely upon. The, um. You you mentioned some of the things that the federal government is doing. I think the best thing the federal government can do is give us a little more certainty around the ability to get projects done because We, a couple years ago we placed uh an order for uh some about a billion dollars of high voltage, direct current equipment uh from a company called Hitachi. And we did so with some trepidation because we weren't really sure if our projects were gonna move along or li- or not. And so, to the extent that we can create more certainty in terms of project timelines and and we don't need guaranteed outcomes but some assurance like, okay, we're gonna go through a process, and if you get through this process you will build this project that's probably the best thing because then we and others uh can step up and make commitments that will be the the sort of uh underpinning of more investments in the manufacturing sector
so thank you for the question we do need more manufacturers of some of this equipment and appropriate incentives for that But I would also echo what Mister um, Skelly put forward, and that is um, in the project that we're working on, we're waiting almost to the end of the permitting process before we're ordering these very lengthy long duration materials. Instead of doing it in parallel because of the risk of not getting the special permits that we need, and not knowing for sure that we're gonna build it. So it's such a high risk, high cost uh type of process. The other thing is, some of the procurement rules now have changed dramatically. you know as a public agency uh putting very large deposits up front for something you might not receive for four or five years out and then having maybe sequential payments and then they're not firming the end price until six months before delivery because of the the the potential of changing of cost of the materials. So the procurement rules for us are very very daunting.
Thank you all for that. I look forward to work out legislation uh on all those issues and yield back.
Thank you very much. The gentleman yields back. And the chair now recognizes the gentleman from Texas eleventh district,
Oop.
for five minutes for questions.
Thank you, Mister Chairman, um, and I appreciate the witnesses being here, uh, the discussion's so important to our future, our security, and, uh, the ability for us to continue to produce what we need with demand growing. It's just, uh, this this is such a it's not just a timely discussion, it's something that, uh, quite frankly, we're we're behind on. Um, so, uh, thank you for that. Um, and, and I strongly support, um, the, every aspect of generating more power, of getting that to consumers, of competing with China. Um, you know, and, and there's so many different things, and I think we should be clear-eyed on this is a competition with the Chinese Communist Party that would really like to take data centers in particular back to the mainland of China, instead of allowing them to be here. Uh, so, yes, I think we can do all of it, and I've got a couple of questions that I'll uh jump into. Um, you know, there's there's a variety of ways to do this, but when when lines are built and they go through private land, um, I think the the onus is on all of us to to really tell that story about what we're doing. And there's a lot of concerns back in my home district. Uh, so know that I'm supportive of hav- having lines transmit electricity, uh, more electricity. Um, but We've heard a lot of um just a lot of concern and this is mostly a state level issue in the state of Texas, so uh less federal interaction, but I think the nexus here is I'll start with Mister Clark on just what the um what are the best practices for ensuring that landowners and the local communities um can have a meaningful voice in transmission siting decisions?
Congressman, thank you for the the the question. The first thing I would say is that if I'm making recommendations to to project developers, the the best recommendation I would have is make sure you have really good land agents, because that's where it starts. I've seen a number of occasions where a project will really get off track. And it's not always electric transmission lines, it can be pipelines too. But if you have land agents who aren't working well in the community and with landowners, um, that can be a problem. A second recommendation I would have is anything that you can do from a congressional standpoint to open up opportunities to use things like rights of way um to streamline the federal permitting process so that project developers don't avoid multi-use federal land i've seen many projects where it would be better to place it on the multi-use federal land keep it off of private land owner's land but the project developer won't choose that route even though it's most cost effective it would be better put on on we're not talking about wilderness areas or things like that multi-use land um but they don't go that way because they don't trigger federal nexus which then triggers all sorts of federal permitting. So I think those two things um will help with landowner relations and get projects done more quickly and efficiently.
Thank you, and I'll come back to that uh in just a second, your point as well, taken there. I wanna go to Chairman Christie. Uh, do you believe states are better positioned than than the federal government uh to weigh landowner concerns and and to deal with that?
Absolutely, uh Congressman, I'll give you a an an example, so we had a very controversial project when I was uh on the Virginia Commission. It was called the Trail Line. It ran from Pennsylvania through West Virginia into Virginia. It was the largest regional line in PGM. And we had hundreds of people that came out to high school gyms complaining, opposing the line. No one came out in favor of it. Hundreds came out against it. And but they had their they had their chance to speak. They had the hearings. And ultimately, we decided that the facts showed that that line was needed to avoid line overloads, which would have caused blackouts and brownouts. So the facts justified the line, we approved the line. It got, continued to get litigated for years, we won all the litigation, we got it built. The lesson is, state regulators are in that position to listen to the people, to give the people a chance to come out, by the hundreds, literally, and and and speak their and speak their will, but at the end of the day when a state regulator says, " The facts show this needs to be built." We we had a credibility that came from from the fact that we were a state, a state utility commission. Bottom line is, I don't think FERC would have that. If if if we had said no to that line, Yeah. and FERC had come in and said, well, we're gonna order you to build it anyway, I think frankly the political blowback would have been so fierce that the members of Congress from Virginia would have wanted to do away with backstop sighting authority. That that's a good point. And it's another reason it's never been used. State regulators have a credibility with the people of their states, Well because they're there all the time and they know what the states uh uh need. And that's why I think from a credibility standpoint, the states have got the credibility that FERC is just
I'm gonna, I'm gonna, let me real quickly, thank you.
stuck in a half.
Um, m- mister Clark, existing right-of-ways but also bolstering the existing system and making these lines more productive can you quickly uh and then in writing follow up on, on how we should be looking at that and what impact that'll have uh on our ability to transmit electrons?
Happy to do so. I think state regulators are definitely interested in ways that the existing system can be bolstered increased capacity utilized without requiring new siting of transmission and and infrastructure.
Uh I'll submit questions for the record. Uh thank you Mister Chairman, we're back.
Thank you very much. The gentleman's time has expired and yields back. The chair now recognizes the young lady from Virginia's fourth district with five minutes for questions.
Thank you chair Lata and ranking member Castor for this important hearing today. Thank you to our witnesses and especially my former constituent. Uh Mark Christie it's nice to be on this side of the dais with you at the table. Um, energy demand in the United States is forecast to explode over the next few years, and we must upgrade our grid, increase transmission capacity, and improve efficiencies in the grid's ability to transmit energy, especially during emergencies or periods of extreme weather. We must advance meaningful reforms to expedite grid and transmission modernization in order to address skyrocketing energy prices, and prevent greater harm to Americans in the future. And in a world in which US households have an average of roughly twenty-one connected devices, our current grid cannot handle the increase in energy generation necessary to support the increased electrification of everything from transportation to advanced manufacturing data centers and AI. And one of the themes of today's hearing has been getting the proper balance between the federal government's responsibility versus the state's responsibility. And as a former state legislator, I get it, and I agree how important it is to get that balance right. But what's been missing from our discussion today is the sheer difference in permitting an interstate natural gas pipeline, versus an interstate transmission line. For the natural gas pipeline, it's a one-stop shop. You go to FERC, you apply for a permit, FERC gives you the permit. For transmission lines, you have to apply for a permit from each state's utility commission, that your line touches. Mister Gramlich, does that make difference make a lot of sense to you? And given fears around all the power lines being cited at the federal level, how many transmission lines do you expect these reforms will actually impact in real life?
Thank you for the question. Uh, well, f- uh, for sure it is easier to build interstate natural gas pipelines than transmission. We have a whole federal regime for natural gas. uh the Natural Gas Act and FERC's uh authority there. There are certainly proposals and discussions of moving the electricity system to replicate that and have full parity uh of transmission with natural gas um sort of being a a practical purpose person I'm aware that there's an opportunity in this Congress to do something that's much more modest than that and simply clarify the federal backstop citing authority that exists and even if that is done uh that would really I think only affect a small minority of lines less than ten percent some people say a couple of percent of the transmission line so states would stay in the lead and would still by and large uh permit most transmission but there would be that um uh you know narrow few for the bigger lines multi-state lines that where there would be a federal role
and i wanna switch gears to data centers uh mr. gramlich i think you correctly noted that uh state utility commissions are addressing the most important questions in electricity policy these days on how to best shield families from paying for infrastructure used by data centers and other large users of electricity as a matter of fact the virginia s. c. c. just adopted a new rate class for dominion energy uh for large industrial users like rate data centers as one example uh so mister gromlich and mister skelly can you talk about how establishing certainty around the question of who is responsible for paying for specific infrastructure will help us build everything clean energy, transmission infrastructure, and facilities like data centers that use a lot of power more quickly.
Well, I'll start on the um you mentioned large load uh tariffs and a lot of the state initiatives and uh, you know, I'd agree with uh Tony Clark in the Nehru testimony, the l- states are doing a lot in that regard and that's uh that's really important work and that these are retail customers that it is currently in state jurisdiction, and that's really important. It's um uh providing first of all dollars into the system to pay for the grid also shielding existing rate payers but also improving our forecast because when they when they pay up, then you know how much to plan for on the system uh so that's that's really helpful. Uh now um the broader question is well you know again they do wanna connect with the grid and the grid is strained and we need more capacity and the grid is by its physical nature a multi-state uh machine and so there has to be also a
Well thank you very much. The General A yield back, and the Chair now recognizes the General Lady from Tennessee's first district for five minutes for questions.
Thank you, Mister Chairman, and thank you to the witnesses for being here today. Um, I'd like to take time to recognize the great work of the tennessee valley authority's done on transmission uh they built more than sixteen thousand four hundred miles of line to provide upwards of thirty five thousand megawatts of energy to ten million people across seven states, and that's no small feat. uh They've been successful at building the transmission they needed to rate they require without for getting unnecessarily involved. In return, we're seeing t. v. a. operate to the benefit of the rate payers by keeping those costs low. And Tennessee residents have some of the lowest electricity rates in the nation, even with the skyrocketing demand. In the western part of the state we have AI's Colossus in Memphis and Oak Ridge is front tier in the east and what are what they're doing to make sure that rate payers have affordable and enough in uh electricity is that they're building transmission but more importantly they're building a lot of new assets, and TVAs in the to bring online sixty two hundred megawatts of new energy pri- organizing permitting reform to rapidly build more energy generation, just a critical piece to meeting new demand and keeping prices low, and it's not just about transmission. So, Mister Clark, I have your letter to the Senate Energy and Natural Resources Committee outlining the Rook's uh permitting reform priorities. In your letter you write that undue delays do not come from the state railroad process but to creation of a federal nexus and can you give some examples of what the delays are in that federal nexus?
Sure, uh thank you for the for the question. I mean first of all the as we state in the letter state commissions have permitted something like close to three thousand miles of of three forty five KV and above lines over just the last five years so s so lines can get permitted through the state uh process in terms of some of the federal stoppages that we've seen that have caused concerns, I'll give you
Mm-hmm.
projects that I saw personally as a state regulator where developers, and it didn't stop the project, but it added cost and time to the project to have to avoid federal lands, to avoid um uh triggering federal nexus.
Yeah.
So that's sort of one negative outcome. A second one that just a concrete example that I'll give you, twenty ten, twenty eleven, there were a tranche of different projects that were determined to be needed in the upper Midwest, inter- regional projects, crossing state lines, interstate projects. Um, most of them were built, sited by the states, handled very efficiently, took a few years to get done, but they got done. There was one that was hung up for I think thirteen, fourteen years. It was the Cardinal de Hickory Creek line. The states had done their job. The Iowa regulators had done their job. The Wisconsin regulators had done their. There's the problem with that one particular line was it crossed the Mississippi River and it triggered federal jurisdiction relative to certain public lands. That triggered all of the opportunities to hang that project up
Yeah.
through federal court, through federal litigation, for year after year after year. Those are the sorts of federal permitting reform efforts that we think can speed transmission, but uh without impinging on the sensibilities to get things done.
So, some some of those developers of the major transmission lines are pushing back on the the reeks' position and they say the states are blamed. Um, Well, what kind of examples for states where have you seen states denying permits?
There are a few. Um, as I said, I mean the the vast majority of lines are getting permitted across country, but there's a few that that states have declined to permit it uh to permit candidly. Usually when it happens as identified in my testimony, it's one of three issues.
Yeah.
Number one, it's a project that leans very heavily on eminent domain and condemnation, and it creates a lot of landowner um concern.
Yeah. Yeah.
Number two is there may be a need-cost-benefit analysis that happens, that hangs the project up. That recently happened with one in Pennsylvania that then became subject to, um, federal court litigation. The state lost in that case, and they were, thought that was a disappointing decision, but, um, it was related to the, the deve- the commission decided that that project was no longer the least cost alternative for the customers in, in Pennsylvania. And then sometimes there are, um, Give an example of a project, SunZia, um, which was delayed for a long time in the Southwest. That was both a federal and state issue. It crossed a lot of federal land, and so it triggered a lot of federal litigation. Um, originally the state did decline that application.
Mm-hmm.
It was because it was deemed to be a deficient application. A project developer later came on, a more experienced developer, who had built some of those projects and was able to get state certification once the the record was more fully developed.
OK.
so it's really the states are pretty good at at doing the permitting it's just sometimes it gets caught up like in mississippi with the federal nexus things of that nature and i've got more questions for the record but with that i'll go back
thank you very much the general general lady yields back the balance of her time the chair now recognizes the general lady from california seventh district for five minutes for questions
thank you mr. chairman i wanna thank all the witnesses for being here today and i wanna a special welcome to randy howard of the northern california power agency this uh power agency serves the city of lodi which is now part of my district and the city of roseville which borders my district now most of my district is served by public power utilities and we enjoy some of the lowest rates in california so i am particularly grateful to the northern california power agency and our sacramento public utility smut i am glad republicans are holding another hearing on transmission capacity because I think the solutions the Republicans proposed in the previous hearing were incomplete. I support advanced transmission technologies, but we need a more comprehensive approach that also assures we can build new long-distance transmission lines on a reasonable time scale. It starts with good planning. Mister Gramlich, your company has published a transmission planning report card for a few years. It shows California is leading the country in regional and inter- regional transmission planning. Mister Gramlich, what is California doing differently?
Yes, the California ISO has been proactively planning transmission consistently for the last fifteen years. They're the only ones who have really been doing it consistently.
Okay, so is California on track to meet our transmission needs?
Uh, yes, California's been doing a lot both within the region and accessing resources around the entire west with uh new lines.
Okay. All right, um. good planning is a prerequisite for good projects and that's why I supported legislation like the Energy Bills Relief Act, which will improve the inter-regional planning process. Um, let me see now. Transmission cost saving, now apparently this all comes back to cost, inadequate transmission capacity has significant cost that gets paid by rate players. Mister Gramlich, your company has written about congestion cost, including during winter storm Fern, can you explain what that means and how much money we're talking about.
Sure, uh, there we in that storm there was about a a hundred million dollar value for uh, just if you had sort of been able to bring power from Chicago to here and in DC, just during that
Mm-hmm. OK.
short period of time, and that's what happens is that the clogged
OK.
transmission prevents that power flow.
Sure. Now, a bigger, more efficient grid is more reliable and more cost efficient. And that's why the California Grid Operator, Kaiso, we've seen it launched a new west side energy market, the so-called day ahead market. Mister Howard, can you explain how the day ahead market works and how you expect it to improve reliability and save costs?
Thank you for the question. Um, today we operate the energy imbalance market, which is a real-time market. It's about the the hour, fifteen minute and five minute, and it's currently saved about eight billion dollars since it came into inception in Um the parties that have been doing that uh are around the west and the decision was, let's go to the next step, which is the day ahead, to the extended day ahead, and that's just uh started up earlier this month, and we're already seeing some very significant benefits, so it's how do you optimize the current transmission system to ensure
Sure.
that the best resources are being utilized to save our customers.
Okay, thank you. Um, delay also has a cost that can be passed on to rate payers. Mister Skelly, in your experience as a developer, how do permitting delays for a new transmission line impact the overall cost of the project?
Well, it, you know, in our business, time is money, and so that's a big factor. But I think the biggest issue is that because it's so difficult to to permit things, there's a lot of projects that nobody even tries to do. and therefore the the penalty that we pay as a society is we have congestion and higher prices than we need because people simply think it's impossible to do some of these projects
ok thank you um mister howard it's important to make the most of the grid we have i understand the silicon valley power which is one of your member companies is pioneering the flexible operation of data centers what does that mean and how can flexible operations help save time and protect rate payers.
Currently in Santa Clara, we serve about sixty data centers currently with expansions planned uh for additional data centers and growth in the existing data centers because of the time line associated with the infrastructure necessary to serve them, uh there's a pilot program going on with NVIDIA, a utility, and a company called Emerald AI which is based here locally. to try to use software and ensure that these loads are flexible, meaning that they can work within the existing system today, and recognizing that they could uh reduce the load requirements under extreme weather events or loss of a generation, loss of a transmission. So we're working with these large loads to ensure that going forward,
Okay.
we can use the infrastructure we have while we're building out additional infrastructure.
Thank you very much and uh you're back, Don Smatresk.
Thank you very much. General Lee's time has chair now recognizes the general lady from florida's fifteenth district for five minutes
Sometimes the questions flow sometimes
of questions.
thank you mister chairman i want to start by acknowledging something that doesn't get said enough and that is that the american electrical grid is one of the greatest engineering achievements in human history hundreds of thousands of miles of transmission lines millions
oops
of interconnected components delivering reliable power to three hundred thirty million america And here is the remarkable thing. The system wasn't built by federal mandate. It was built state by state, utility by utility, with state regulators who understood their communities, their geography, their customers, and their specific energy needs better than any federal agency ever could. The Southeast and Florida today are the strongest proof points of the model, that reliable, affordable, growing, and and results can be done without burdensome political intervention from Washington. Mister Reichart. Southern Company's vertically integrated state-regulated model has delivered retail rates more than ten percent below the national average frozen base rates in Alabama and Georgia no generator interconnection queue backlog and you have never been transmission constrained during a peak reliability event. At the same time, NERC's own study, Congress mandated specifically to inform this debate, concluded the transmission decisions should be based on region-specific reliability findings and coordination not broad federal mandates. My concern is that the regions most aggressively pushing for federal inter-regional transmission mandates are largely the same regions that retire dispatchable generation ahead of adequate replacement creating their own capacity shortfalls and are the region's most broad federal and are now facing NERC reliability warnings of their own making. If Congress imposes a federal mandate with regional cost allocation, aren't we asking Southern Company customers in Florida, or in Georgia, Alabama, and Florida rate payers who are served by Florida Power and Light and Duke Energy, who have absolutely no role in creating these reliability failures, to subsidize expensive transmission lines that exist primarily to paper over the consequences, of other regions' policy decisions.
Thank you for the question, and and yes, potentially. And I would love to answer that question in terms of how we evaluate inter-regional transmission. Cuz we do a full accounting of all the benefits and all the costs. There could be energy benefits. You could pick a day where you see other regions might have cheaper energy than us. But if you look at a forty-five year transmission asset, what we have seen, because of least cost planning, the spreads between regions are not very significant. The other benefit, and you mentioned this, is capacity or reliability benefit. Our state commissioners hold us accountable for building enough or buying enough resources to maintain reliability, and NERC has, you know, identified that we're really good at that. So we don't see any reliability or capacity benefit from an regional transmission. On the cost side of the equation, a lot of um time gets spent on the cost of the line, but we don't talk about other cost components. there are network upgrades on the each side of that line that are required to be done. It would be like building an interstate with no off-ramps or local roads, if you didn't do those upgrades. And those upgrades can be hundreds of millions of dollars. And then the other cost that you have to consider is, if you look at a four hundred mile transmission line that's carrying two thousand megawatts, we have to be ready for a storm or something else to take that line out, and respond immediately to maintain reliability. That's fuel costs that our customers have to pay. And then the last cost you have to consider is, you know, physics are undefeated. Load needs voltage. And a great source of voltage or mega VARs is local generation. So if we're relying on long-haul transmission, we've gotta spend money on local solutions to provide that voltage support. So what we have seen is the whole business case, the full accounting of costs and benefits, the costs far outweigh the benefits for our customers.
Thank you. And, Mister Clark, in your prior writings you raised concerns that FERC order one thousand could weaken state authority over transmission planning and potentially shift costs onto states like Florida, that are outside organized wholesale markets. Now that it is more than fifteen years since implementation, how do you view order one thousand, and can you speak to that?
Congressman, thank you for the question. That's a bit of a blast for the past for some of my writings at FERC. I appreciate that. Uh, yeah, I mean my concern when I was at the commission thinking back is that some of the, the planning mandates coming out of order one thousand may be inappropriate for certain situations and Florida was a great example, where it's a peninsular state, uh, not a lot of interconnection with um with other regions and overriding the um, directives potentially of the Florida commission who really looks at serving local consumers might end up with sub-optimal solutions.
Thank you, Mr. Chairman. I'm out of time. Yield back.
Thank you very much. The general yields back and the chair now recognizes the gentleman from New York's twentieth district for five minutes for questions.
Uh, thank you, Mr. Chair. Members across the aisle have said that it is a national security and economic imperative that we compete with China especially on the AI race. So I really hope that this hearing can be a first step toward acknowledging that to fully compete we must enable the expansion of our electricity system on a national level. I would welcome the opportunity for us to work together to actually address some of the very real hurdles that are currently preventing good projects from being considered, let alone successfully developed. I've seen it first hand in New York State, but I'm excited that we're finally expecting the uh Champlain-Hudson power express to be energized next month. I've been on record supporting this project since twenty eleven, and when it's completed, this one high voltage line is expected to fulfill some twenty percent of New York City's electricity needs with Canadian hydropower. So, Mister Skelly, I know you have experience developing similarly uh large projects. Can you tell us how much harder and more expensive it it it becomes when a project drags on for ten or fifteen years and does that lead to more expensive financing or other cost overruns?
So, there's there's two big costs, and I'm glad you mentioned that project because it's a great project and and we'll do a lot to improve air quality in New York City, which is, I know, a big issue for you all. Um, in Houston we build transmission into the city and that helps us with our air quality as well. So, um, in terms of the cost, there's two there's really two costs. One is sort of time value of money and the other is the risk premium. So if you have a project like Bl- in this case it's Blackstone, they carry that project on the books for like it'll be like fifteen years of development costs and a lot of uncertainty. And investors are like normal people, if they're taking a lot of risk, they'll want a premium associated with the amount of risk that they're taking. And developing transmission is a fairly risky enterprise. Um, so people will look for for higher returns during that risk period. Now, once you get a project over the finish line, the risk drops dramatically because you have mechanisms in place where it's, like, a nice consistent revenue. So the costs are uncertain. And then the other huge cost is all the projects that we don't do. That does cost the country a lot.
Thank you for that. And I'm looking at reports from the EIA and the Brattle group, uh, where they indicate about thirty billion dollars worth is spent annually on in on transmission infrastructure. Brattle group also did some analyses finding that most transmission investments in twenty twenty-three were reliability projects other big drivers of investment include addressing aging infrastructure and load growth which in a sense are also a function of maintaining reliability so mister Gramlich um does this track with your understanding as most of the thirty billion dollars spent annually on transmission investments to improve system reliability
Uh, yes, and it's somewhat frustrating. We're spending all this money, uh, close to thirty billion dollars a year and we're not actually expanding the capacity. Now, we do have to spend almost all if not all that money because the the lines are seventy five or more years old and need replacement or uh severe weather uh requires us to, you know, upgrade them or just pay to rebuild when they get um blown down in a storm. So that's a lot of spending, but we also need to expand the capacity.
Thank you. And I also want to focus on a point you made in your testimony. Even if there were to be significant changes in how we plan, site, permit, and cost allocate major transmission projects, this wouldn't change the fact that states and regions, not the federal government, will still have primary responsibility for considering major aspects of the overwhelming majority of transmission investments. Is that correct?
That's correct. I outline in my testimony many, many roles that states will continue to play, even if uh you know, uh a transmission title and permitting reform pass.
Right. And what are some of the characteristics of a transmission project that may warrant it to be given elevated national significance?
Yeah, I would say the higher capacity, longer line, multi-state uh nature of those of those lines would uh, you know, put them in another category.
Right. I fully acknowledge that not all transmission proposals are going to be good, but it is clear that well-planned projects can reduce congestion, improve reliability and unlock access to low-cost generation. But if grid planners constrain themselves to only regional and local options, they may overlook projects that provide access to low-cost resources from neighboring regions. And when regions don't need to plan together, it makes it more unlikely that an an inter-regional project will be planned for at all and that means consumers may be missing out on hugely beneficial projects. So, why is it so difficult to get regions to jointly conduct inter-regional planning?
Well, I'm sorry, the gentleman's time has expired and uh he will submit that uh question for you for in writing. Thank you very much, and the chair now recognizes the vice chair of the subcommittee, uh the uh gentleman from Texas' um fourteenth district for five minutes for questions.
Thank you, Mr. Chair. Mr. Christie, I'm gonna come back to you for a couple of questions. Can you endure that?
Uh, I'll try.
OK, we'll we know you will. The lady from Virginia earlier talked about transmission lines and pipelines as if they were one and the same should be traded the same and you know all that kind of stuff. Uh, how do you think transmission and pipe, you know, wires, if you want to call them that, and pipelines are different?
Well, pipelines are different in several ways. First of all, uh, it was Congress I think made the decision back in World War Two to to give what was in the Federal Power Commission the the permitting authority I think is a wartime measure. But another difference is a pi- and we permitted those at FERC and and did a lot of them. A pipeline is financed differently. Um, a transmission line is gonna be financed by consumers because it's gonna go into something called rate base. It's a utility asset. And consumers are gonna pay for it really from the t- in in RTOs, consumers pay for it from the minute it goes into the regional plan. They start paying. Even if it doesn't get built, and I can give you an example called the Path project, which never got built, and a quarter billion dollars and charged to consumers in Virginia, uh, for a project that never got built. It doesn't happen with pipelines. Pipelines are financed by shippers, so the shipper pays for the pipeline. So it's really not a utility asset in that sense. A pipeline might serve a utility, like a local distribution company, which is a utility, a state-regulated utility. But the pipeline itself is, is gonna be paid for by shippers who sign contracts called precedent agreements, and, and at firk we don't approve a pipeline unless there's sufficient uh, market demand in the form of precedent agreements to pay for the pipeline, but c- but a a transmission line, consumers are gonna pay from the second it goes into a regional into a regional plan.
Right, that's a good analogy. People, I wanna come back to you, people often often tout the inter-regional transfer capacity report from NERC as evidence of the benefits of inter-regional transmission. Since you were chair of FERC at the time, you may have a different opinion. You know what I'm talking about. uh what was the conclusion of the report and what should congress take away from it that's report's findings
well i reported the preliminary findings from uh last august when i was chair what nur said was yes we need inter-regional transmission i think there's no disagreement on that i i fully agree with it uh we benefited during hurricane uri winter storm uri from inter-regional transfers the first point was we need inter-regional transmission but there's no basis for an ex-ante mandate plucked out of the air where you say, okay, I can think there's a senate bill that said fifteen percent of the load in two regions, you had to build transmission to that degree, that's gonna submit a lot of money on transmission that hasn't passed a cost-benefit test. We need inter-regional transmission. What Firk's point uh NERC's point was we need inter-regional transmission. It needs to be done on an individual basis where the regions come up with individual fact-finding that supports the individual project, which by the way is the way all utility assets ought to be built if you want least cost pro-consumer results.
Yeah, leave it to the states, I think I hear you saying, and and boy I tell you we we experienced that uh February of twenty twenty-one winter storm Urey in Texas. Unfortunately, ERCOT was you know on track with things, so. Ms. Clark, I'm gonna come back to you for just a minute. Do you kind of agree with his assessment that pipelines and electrical lines are different and or do you have a different perspective?
No, it it Congressman, thank you for the question. Um, have exactly the same um uh perspective and would have answered that portion of it the same way that Chair Christie did. I would add a couple of other things to it where I think there's differentiation between pipelines and transmission lines. With with pipelines, there was a decision made at the national level that, look, there's really just there is one source area that you're attempting to collect the gas from to deliver to one demand area. So you have to connect it via a pipeline and there's not a lot of other decisions to be made in that regard, in addition to the fact that it's actually the shippers paying it as opposed to, sort of everyone in a in a rate base. The uh trans- transmission is totally different. There are lots of different ways that you can deliver power. You can have generation closer to load. You can build certain type of transmission in one place or another. Um, it's it's a much more dynamic process that doesn't lend itself to federalization in the same way.
And it's good for the rate payers. Would you agree with that, Mister Howard?
I would agree.
Mister Gramley.
Uh, I think there's a federal role for transmission and a grid that is a single machine across dozens of states.
Mister Scali.
I think we heard from other witnesses that inter-regional transmission is necessary and helpful but um so we need to come up with mechanisms to make it happen.
Mister Reichert.
I agree.
Okay. Thank you, Mister Chairman, I yield back.
Well, thank you very much. The gentleman yields back the balance of his time. The chair now recognizes the gentleman from Texas's thirty-third district for five minutes for questions.
Uh, thank you, Mr. Chair. I'll, gentlemen, I'll tell you what really worries me right now is the fact that uh the Chinese Communist Party is leveraging state-directed investment to build grid infrastructure and we simply just aren't matching it. Uh, I don't know how we're going to keep up. If we can't power AI at scale here, That industry will just migrate to jurisdictions that can. Uh, a grid that can uh power the future is a strate- that cannot, I'm sorry, a grid that cannot power the future is a strategic liability. Uh, luckily in Texas, uh, we show that we don't have to be reactive. Uh, the KREAS program proved that proactive planning unlocks massive private investment. Uh, we built about thirty-six hundred miles of high-voltage lines, uh, and the private sector responded with billions in new generation. Uh, we are currently uh failing to apply that Texas speed at the federal level. Uh, we've seen uh recently uh rate payer protection pledges, uh, but as experts note, vague pledges don't build substations. Uh, we have to have real institutional uh architecture that converts data center capital into public grid investment. And we also need to move toward a model where large loads like these hyper-scalers uh don't just connect the grid but actually help finance the the modernization that benefits every residential taxpayer in the district. Uh, we can't continue to ask companies to commit billions if the federal government can simply pull the rug from under the midstream. That is not a good way to do business. Investors need to know that a final permit is exactly that, that it's final. Uh, if we can provide that certainty, we shouldn't need federal subsidies. We need federal stability to let private capital, uh, do the work. And I wanted to ask Mister Gromlich, How can federal policy move away from the current reactive interconnection model and towards a proactive planning framework that anticipates load growth uh like the data center boom we're seeing?
Yeah, those uh transmission lines uh built in the uh right around twenty ten twenty thirteen in Texas were uh a huge benefit to the state and enabled a lot of load a lot of uh generation to be connected. They were in fact a model for then uh in the upper Midwest. Uh, Mr. Clark was involved in upper Midwest states. doing that proactive multi-state regional transmission development uh in the Midwest uh Southwest power pool followed California and a number of other states have been doing this regional approach that were all sort of the model for first quarter nineteen twenty which hopefully will be fully implemented nationally but we're we're still not doing it yet in most of the country. So that proactive transmission approach um with also Texas' example of a simpler and cheaper interconnection for generation uh, really have been an effective model for the rest of the country.
Do you think there's anything that Congress can do? Do you think there's a a lever that we can pull to help these other states that aren't quite there yet?
Sure, I do think the planning, permitting and paying to proactively build out the grid and not try to do what we do in most of the country, which is try to build a national interstate grid through the interconnection process, which is a crazy way to do it. Uh, you know, the next straw on the camel's back has to build, you know, the whole new the whole new so whole new camp. Uh, ran out of my metaphor there, but uh, you get the idea that the uh the network should be built as a network, not just in response to a single generator. That would be a good model. You could also, if you wanted to do something closer to the generator interconnection uh approach of Texas, uh Congress could say FERC should fix uh what is supposed to be that energy resource interconnection service but it never really worked out that way. Uh that could be a direct the improvement of that to go back to its original intent.
Yeah.
could be a directive in a in a law.
Yeah. Yeah, no, no, thank you very much. Mister Scali, I wanted to ask you, you're in the business of putting steel in the ground and you know that time is the enemy of many major infrastructure projects. Uh, when you're looking at a multimillion dollar project, how does the idea that a permit can be undone after years of work impact your ability to secure financing because if you ain't got no financing, you ain't got no project.
Well, I, you know, I would say that the thing that perhaps most keeps us away and I we do everything we possibly can to do great work in terms of community consultations working with tribes working with all the different federal agencies to come up with a record of decisions on NEPA that's as strong as possible but the prospect of uh somebody challenging that decision five six years down the road is that'll keep you awake at night so we worry a lot about that so
yeah and and Yeah, I can imagine that you do. So in my last few seconds here, I just wanted to ask you, you can answer it quickly. Is finality in the permitting process just as important as the speed of the initial review because we don't talk about that enough around.
Yes.
Yeah. Thank you very much. Mr. Chairman, I yield back.
Well, thank you very much. The gentleman yields back the balance of his time. The chair now recognizes the gentleman from South Carolina seventh district for five minutes for questions.
Thank you, Mister Chairman, thank you, the witnesses, for being here. I don't think it's any surprise uh to anybody in this room that energy demand is rising rapidly in the United States. Um, the EIA estimates that uh annual growth rate's ranging from three point seven percent to fifteen percent by thirty-third, or twenty-thirty. Um, at the same time, reports show that generation uh resources and transmission development are not keeping pace, as you've all talked about. Uh, meeting this demand obviously requires new energy infrastructure in a timely and efficient manner, which is somewhat opposite of what Washington does on a routine basis. Um, federal permitting reform has been a major concern of this committee. I've seen this at the state level and for sure at the federal level. Um, but reform should focus on streamlining existing federal processes and not necessarily preempting state authority and oversight. Uh, permitting delays are largely the result of federal bureaucracy as not on the state's uh oftentimes. For example, over the last six years, twice as many transmission lines um over which states have primary jurisdiction were built compared to that of natural gas pipelines, where federal agencies have jurisdiction. So, Mister Clark and Mister Christie, section two sixteen has amended the Federal Power Act established backstop transmission siting process in which the Department of Energy would conduct an evaluation in consultation with states to identify national interest transmission corridors. Under this process, as the law now requires, if a state rejects a transmission project developed in one of those corridors, the applicant can go to the FERC uh for another assessment, and FERC may override the state. Mister Christie, is that roughly how this process works?
It's how it's written in law. There's never been a project actually um built because the state said no. So, I it's sort of a virtue signaling, uh frankly.
Yeah. Why why why has it never been used, Mister Clark?
Um.
S so the two section the the backstop sighting authority and something we haven't talked about today, is actually for the first several years of it, there was a reason that it wasn't used and that there was actually some court cases that came through that made it prohibitive for it to be used, but I believe it was through the IIJA that was reformed. So we've only had a few years since the reform has happened then as chairman christy noted there hasn't been an application under that statute we think that that exists it's there it's possible to be used if if uh an entity qualified for it and we would be very concerned about broadening that in such a way that it creates sort of a loophole where it no longer becomes backstop sighting authority but it becomes federal primary sighting authority as a mechanism to get around state processes
which you've cautioned against the federal sighting authority
that's correct
Mister Christie, there are proposals to eliminate the role of the Department of Energy, um a cabinet agency with responsible for national energy policy, to eliminate the NIEETC process and to put FERC, um a rate regulator in the driver's seat, uh to determine whether individual interstate transmission projects are in the national interest, and overrule states that object. Seems a little bit misguided to me. Is is FERC positioned to determine what is in the national interest, especially when looking at just one component of the electric system, outside of the normal planning process.
No, Congressman, but I don't think the Department of Energy is either. I don't think either federal agency is in a position to make a better decision than a state regulator on when a when a transmission line is appropriately sited and should be built.
States make a lot of decisions that that may affect the costs of surrounding states. Uh, state renewable portfolio standards drive out reliable generation in some places, uh, which puts reliability burden on the grid in other states. If FERC is given authority to assess assess the national interest, should it also assess the national interest implications of state environmental policies on other states.
Well, I don't think FERC should be given the authority to it, to draw a national interest corridor, because I don't think FERC has any more expertise than anyone else, nor does the Department of Energy. I don't think it's a federal role. I think it ought to be a state role. So I wouldn't give FERC any any add-on authority, as you mentioned.
None.
I wouldn't give them either one.
All right. All right, good. Um, Mister Reichert, uh, as a system planner, you said that study is
And the gentleman here has fifteen seconds.
Yes, thank you. And w- we think inter-regional provides value as long as a full accounting of the cost-benefit happens. One of the aspects I think you're referring to is the need for voltage support which local generation can provide.
And I'm perfect timing.
You're right on. Thank you.
It's fine, yield back.
The gentleman yields back, and the chair now recognizes the gentlelady from Washington uh State for eight minutes for a question or fi- five minutes for a question from the district committee.
Sorry?
District eight for five minutes, Marcus.
I'll take I'll take eight.
I'm not sure fifty by then.
Thank you, Mister Chairman, and uh thank you to all of our witnesses here today. I just first want to express my sincere appreciation to the majority for holding this hearing on transmission permitting. It is desperately needed to meet the energy demands now and in the future, and the energy sector of the west, including utilities, regulators, consumer and environmental advocates, and more all agree that we need more. inter-regional transmission. Um in fact in February a a broad coalition of these experts released a ten year uh west-wide transmission study that found inter-regional transmission build-out is simply not keeping pace um with steeply increasing need driven by load growth new resource capacity and extreme weather events like cold snaps and heat waves um so experts agree that we would need this more nimble and resilient flexible grid can transfer large amounts of power and so i'm grateful for the hearing um mister uh as you know well the the west is developing two day ahead markets to purchase and sell wholesale electricity and barring any major departures from the current plan uh it appears we will have both s. p. p. s. and kaiso's markets bordering meshing sometimes entangling each other And I know Grid Strategies has has studied this quite a bit. I was wondering if you could talk about how small, strong, smart transmission planning can play a critical role in reducing seams, reducing congestion, making things work work smoothly.
Sure. Well, our perspective on that is uh I was uh working for the first chairman when we approved some very awkward configurations of RTOs and we thought, well, let's just put seams agreements in place. And the reality is they didn't work. Uh, they just never actually resolved the seams problems and the inefficiency and the reliable uh harm to reliability from power flow looping through different systems. Uh, a colleague on my team used to run markets for uh, and he says, yeah, those seams agreements just don't work very well. So the the lesson that we have is configuration matters. The organization that you join makes a big difference and you can try to fix it with seams and you have to, if that's where you wind up, but you really should try to work on a a good configuration that's consistent with power flow in order to improve reliability and efficiency.
Is it sort of to minimize the number of seams is the idea.
Yes.
Okay, thank you. Um, Mister Scully, you previously mentioned the North Plains connector that will help connect the Pacific Northwest with the Plain States and Grid United uh puts the real estate work and the relationship building with land owners and locally impacted stakeholders ahead of permitting. Um like getting the permission from the people impacted before at the permitting. Can you talk about that model and as we look forward to federal permitting reform, how can lawmakers smooth this process and incentivize more of that kind of work?
So What we do is, you know, it's sort of a question of sequence, so we believe that to de-conflict the permit process, and we're not the only people who do this, lots of uh oil pipelines in particular do this because they don't have federal authority, so we go out and talk to the landowners first and then we move up the chain of approval, so it's not sort of unique to us, many many other folks do this as well. Um, so what can we learn at a national level to to that's instructive. I mean, I think to the extent that you're thinking about like different reapportioning authorities there it should be a very high bar if there's state backstop a federal backstop authority so Iowa for example says you gotta have eighty five percent of the land signed up before you show up I think in Montana it's like seventy percent. So there should be a very strong showing. Most state commissions expect that as well. So that's one way to do it. Uh, I'm I'm sort of with, um,
This kind of goes back to states.
uh, Mister Christie on this on this filling of gymnasiums. If you don't do this right, you're gonna get run out of town. And so, uh, you could you could introduce that sort of provision before, uh,
Socialize it first.
yeah.
Okay. Last uh last question. And um, this one is For you, Mister Gr- Gramlich, but in like sixteen seconds. Bonneville's about to get a new administrator. Uh, we need a lot more transmission. If you were giving advice, what would you recommend to build out more transmission and uh Bonneville's responsibility in that?
Yeah. Well, I would say regional proactive long-term transmission will work for the Northwest just like all the other regions.
Okay. Thank you. Five seconds left. I'll yield back.
Thank you very much. The general, he yields back. And the chair now recognizes the gentleman from Texas twelve for five minutes for questions.
Thank you, Mister Chairman, thank you panelists very much for being here. Um, Mister Clark, Texas has been a national leader in successfully planning and building transmission under state oversight through and the PUC the Public Utility Commission. Why is it so important for states like Texas to retain primary siting and permitting authority rather than expanding federal control from Washington?
Thank you for the uh the question, Congressman. So, I think the the short answer is is because in the especially in the electricity space, one size really does not fit all. Um, the solutions that Texas has created for it with some really kind of unique circumstances, which is most of the state is within ERCOT, not federally jurisdictional, it's contained solely within uh the state of Texas. The answers that Texas has been able to come up with with their market structure, has worked very well for Texas, but That same resource base doesn't exist in other parts of the country. There are a lot of other dynamics at play. I think about a s- place like the upper Midwest. How you generate power in the upper Midwest is very different than Texas, where you have very syst- different resources and you have different system peaks and you have a different configuration of - of state's utilities, and um, and ways to deliver the least cost power. So I think the answer is the reason that we vest so much authority and should at the state level on these issues is because one size does not fit all, and doing it all from Washington DC could end up with some uh very sub-optimal solutions for consumers.
Alright, thank you very much. Mister Christie, as a former FERC chairman, you've warned that expanding FERC's backstop sighting authority or imposing federal mandates will drive up costs for consumers. Texas has successfully built major transmission projects under state authorities to support low growth. Why should Congress maintain state's primary's role in permitting transmission projects rather than expanding federal override power? And should this approach apply equally to states within FERC jurisdiction?
Well, I think states should retain the authority they have now to b- to permit and and cite transmission projects. That's that's who's doing it now. That's who's getting projects built. And projects are getting built and states are approving um transmission projects. If you're a state regulator and you and you see the need for a project you want it to get built. I mean, we proved well over a hundred on my tenure on the Virginia Commission. I don't think we turned down one, not because we were a rubber stamp, but because we looked at the facts and said these projects are needed. So I don't see where a FERC backstop authority, cuz the presumption of that is the state regulator doesn't want to build the project. The state regulator wants to be an obstacle. That's the presumption of that. And so the the basis is, well, if the state regulator is gonna be in the way, we need FERC in Washington telling a regulator in Texas or Utah or North Dakota, we know better than you do. You said no, but we we think you we want you to say yes. I just don't think it's politically tenable. I also don't think it's going to get projects built. Because a seven sixty five KV line, a five hundred KV line, these are big parts of the built landscape. You don't hide them. They're not underground. And frankly, everybody in the in in the vicinity is is gonna be affected by it. And to get those built, you have to have local buy-in and local acceptance of a decision, which is going to be extraordinarily controversial. You're not gonna get that with first saying you have to do it, even though your state commission said no.
Thank you, sir. Mister Howard, most witnesses have noted that the biggest delays in transmission projects usually come from federal processes, such as an EPA reviews or crossing federal lands, not from state processes. Can you give examples of projects where states like Texas were ready to move forward, but federal requirements slowed them down?
I I can't give specific Texas examples, but I I have plenty of examples where uh the federal processes where we wanted to upgrade existing lines where we've determined that the lines are no longer uh they weren't designed or engineered for the types of extreme weather events, that we're seeing today. And we wanted to upgrade those lines and you had to go through a federal process, a NEPA process that made you l even look at the line as if it had never been built from the beginning, instead of saying no you have an existing corridor, you have disturbed land, you have everything there, all you're trying to do is re-engineer the line so it will withstand the conditions that it's now gonna be subject to. And that's been a a more common issue. The other is when we have these big wildfires in the west, and we've burned down transmission and we wanna build it back more resilient than it was when it burned down. Uh, your first and foremost is you need to re- get the power back on for those customers, but we're having to go through a NEPA process if we wanna make it more resilient than it was.
Thank you, sir. Thank you, Mr. Chairman. I yield back the balance of my time.
Well, thank you very much. The chair now recognizes the general lady from Texas's seventh district for five minutes for questions.
Well, thank you, Chairman Latta, uh, for making it possible f- for us to have this important hearing today and thank you to our witnesses, Um, I have been a bit of a broken record on permitting reform since I've been on this committee and in Congress, because it's such an important issue to the people that I represent at home in Houston, uh, who are involved in every aspect of our energy system at home and around the world. And they have told me how essential it is to have permitting reform of all kinds, to keep us moving forward, to keep the lights on, to keep the costs down, to keep our competitive advantage and maintain our energy security and national security. And I am lucky to have so many Houstonians with so much expertise to learn from, and particularly glad that one of the people that I looked to for, um, uh, thoughtful, informed, and realistic guidance, uh, on energy issues of all kinds is one of our witnesses today. So thank you, Mister Skelly, for sharing your thoughts with us here today. It is clear that improving our ability to build transmission efficiently will mean a more affordable and abundant energy supply, whether that energy is generated from traditional or renewable sources, and without better transmission, the development of innovative technologies, technologies that a lot of people on this committee have expressed great interest in, like geothermal and small modular nuclear reactors, they can be held back by inefficient and uneconomical connections to the markets. So what do I mean by that, right? Like generation we want won't be able to get where we want it to go. And all the generation in the world isn't gonna solve energy shortages if we can't move it. So, as we discussed in last month's legislative hearing on this topic, it seems to me that any meaningful permitting reform package has to address core barriers to building transmission in scale. And that's planning across regions, which I think everybody here today has said they support, permitting certainty, which everyone everywhere wants, and workable cost allocation. And I think that's really the sticking point here. So, as we've heard throughout this morning, I think this is where the committee needs real guidance. And I'd like to get a better sense of how the committee should think about fairly allocating the cost of building inter-regional transmission and protecting consumers from high rates. But before I get to my question, I want to follow up on something Mr. Goldman was just asking about, and note that we've heard concerns today from some of the witnesses, some of my colleagues about FERC's backstop siting authority for inter-regional transmission projects. And at least part of this, the explanation we've heard today is based on community input, and community input is vitally important to the permitting process for all forms of energy and we should incentivize a robust public input process. That's hugely important. I've been saying that here for a long time. But when we are facing a national shortage of available electricity and projects that are clearly in the national interest, we need a mechanism to reconcile regional input and local buy-in with all the other concerns. And I've heard a lot of proposals from my Republican colleagues on this topic for permitting interstate gas pipelines. And look, I share them, uh, and and I certainly understand those concerns. I absolutely share them. Uh, it's a huge issue in my district at home. But we need to consider these solutions equally for all forms of energy infrastructure. I think that's really important. So, with all that in mind and not a lot of time left, Mister Skelly, you've talked about regional transmission and cutting right to the question, can you just share a little bit more of your thoughts, you got cut off earlier, but on how you think we can address cost allocation, uh, what benefits should be considered when allocating costs for a new line, and just generally how better rules of the road, um, around cost allocation can help provide low-cost energy to consumers.
So maybe it's helpful to use an example. So let's say that Colorado and Utah build uh develop a lot of their geothermal resources, okay? Kansas doesn't have very good geothermal. And they uh and there's an opportunity to connect those regions, okay? Now this is between the eastern and western grid, so it makes it a little bit the thought experiment a little bit easier. if you did connect those regions the west that built the geothermal would get some reliability benefits cuz they could lean on Kansas during extreme events okay it also gave them an opportunity to export power to Kansas now Kansas in this case would benefit a little bit more because they're getting access to this cheap energy to the west so if we had a process where you could align what's proposed like that the costs and benefits would be measured just the way we measure costs and benefits in the existing RTO process and then costs would be assigned to each of the states or each of the regions. And then we'd get the economic development, a more reliable grid, uh, cheaper power, et cetera.
Okay, well, and that's super helpful and I've already gone over my time, so I have more questions for the record. I wanna thank you all and I you're gonna see some more questions from me for the record, but thank you mu- very much for your testimony today and I yield back, Mister Chairman.
Well, thank you very much. General Lee's time has expired and yields back. The chair now recognizes the gentleman from Colorado's eighth district, five minutes for questions.
Thank you, Chairman, ranking member. Thank you, of course, to our witnesses for coming today. Um, last week I spent it in my district. I visited a lot of small businesses and I heard from families, veterans, small business owners, energy prices are top of mind in Colorado. Unfortunately, uh, the ruling Democrats in my state are continuing to raise electric bills through climate mandates that are impossible to meet, over-regulation uh on municipalities and utilities, new taxes, new fees on traditional energy resources, and Coloradans now pay higher bills uh to receive two thousand gigawatt hours less generation and a less reliable grid. There's no doubt in my mind we can reduce electricity prices through federal permitting reform and integrated planning to improve generation and transmission, and distribution, and we gotta have all of that. Why would we build transmission if we don't have generation to support it? Why build generation if we can't get that power to where it needs through transmission and distribution? We have to prioritize all of those things together to have affordable, safe, reliable energy, and I think it starts with permitting reform. Um, I'm working on a lot of different bills, uh, cosponsoring the Speed Act, leading to bipartisan bills here, the Fire Act, um, the Certain Act. Unfortunately in Colorado, it has become more expensive to permit energy projects at times than it is to actually build them. That's unacceptable. Um, I have a local utility in Colorado. They had to fight for five years to get two redundant permits to upgrade an existing line in an existing right of way in order to lower wildfire risk. Five years and all of that associated cost is too much. So, uh, Mister Rickard, uh, first question is to you. Can you talk about robust permitting reform policies that prioritize judicial review and shorter permitting timelines and how would that reduce costs for rate payers?
Uh, thank you for the question. And it absolutely would reduce cost. Like I said earlier, energy infrastructure, both the fuel pipeline, the generation, and the transmission. This is a capital-intensive endeavor. And any time we can provide certainty to both the cost and the timeline our customers benefit. So for example, on judicial review, if we can limit the time for challenges, uh some type of statute of limitations, that provides that much needed certainty that our customers need.
Thank you for that. Uh, Mister Gramlich, my next question will be to you, beyond just permitting reform, what other reforms do you think are needed to ensure timely and affordable generation? We're gonna need another hundred and seventy gigawatts by twenty thirty. generation and transmission uh that prioritizes local input early and often. What else do we gotta do?
Yeah, well I would encourage uh uh requiring more proactive planning, regional and inter-regional, uh and uh and then clarifying the uh the benefits that are used for for cost allocation, some further interconnection reform and directives. I would also say we haven't had enough conversation today about advanced transmission technologies, but those can really help speed up access to power in a very uh cost-effective way.
Thank you. Uh, I'm gonna go to uh Chairman Christie next. I hear concerns uh from farmers in Colorado about eminent domain. I represent a big ag pr- uh ag producing region, um but it's also adjacent to a major metro area, so a lot of growth. Uh, and a lot of the farmers and ranchers that I talk to um are dealing with land grabs from the state and they're left as climate mandates for non-critical political pet projects. Uh, and this can hurt public support for essential infrastructure like generation and transmission. Um, so first, uh, is it true that both states and FERC already have eminent domain authority?
State, well, states have an eminent domain authority, if you're building a transmission line and you permit the line, the utility that's building it gets the eminent domain authority, which is a big reason why states are in a far better position to permit a seven sixty-five, a five hundred KV line, which are very big projects. that are seen for thirty miles away and they're very controversial. So, the eminent domain authority is there at uh with the state and and that's why you want that local buy-in. When FERC approves a a the only uh eminent domain authority FERC has if it approves a pipeline that that carries eminent domain authority with it because that's part of the s that's part of the statute but again back to the point about the transmission lines, these are controversial projects. These are big, big physical uh projects. And without the local buy-in and understanding of why it's being built, why it's needed, why we have to build it, and that includes use of eminent domain to take private property, which is a huge thing in the United States. You have a much better chance of getting the local acceptance of that if it's a state entity that approved the line as opposed to, in your case, Colorado, all the way back in Washington.
I'm out of time, you're back.
Well thank you very much. The gentleman's time has expired and he goes back. The chair now recognizes the at-large member from the state of North Dakota for five minutes for questions.
Uh, good afternoon everyone. Thank you for being here. It's great to see a great panel of experts, including a dear friend and fellow North Dakotan, uh, Tony Clark. Thank you, uh, Mister Chairman, for continuing to bring forward, uh, important discussions like this that get to the heart of affordability. uh for Americans and uh citizens in my state. And today's hearing really gets to the heart of that principle. Uh, transmission costs are rising and largely, families, businesses and others who are utility customers, they're paying the bill. We continue to hear we need to spend more money to save money. And f- utility rate payers are frustrated by that. Uh, Mister Christie, I wanna start with you.
Mm-hmm.
As you can see from the chart be displayed behind me, transmission costs are far outpacing the cost of generation in terms of their growth in cost to to utility customers can you help help explain this to me and and uh help talk about what some of the drivers of those costs are and how federal policies like the tax incentives uh may have contributed to this.
Well, distribution costs have been going up because a lot of the utilities uh have been have been required and and and are doing it they're hardening the systems, particularly against um uh inclement uh against emergency weather uh events, like hurricanes.
Mm.
So the distribution costs, which are under local state regulation, have largely been driven by trying to harden the system um appropriately against storms. Transmission costs are going up. Again, it's another utility asset. One thing people need to understand is you know that it's a former state regulator. Most of your utility bill is for utility assets. They go under rate base. And the cost mounts year by year, which is you've seen with transmission. I think personally that we've got a major regulatory gap in transmission FERC regulates transmission rates in most parts of the country. And in those parts of the country that went into RTOs, there's no local review of local projects, which is the largest part of the the cost. So there's a b- I think there's a regulatory gap because in the RTO specifically with the lack of local authority to look at local uh transmission costs.
Mm-hmm. Okay, thank you for that. Um, Mister Clark, thank you for representing a Narokan state regulators here. Uh, state regulators are constantly dealing with multiple challenges. Um, a few years ago it was electrification, uh, but it seems like today's challenges are largely focused on meeting large load demands. I have another question. for you but first would you agree with that that that's one of the biggest challenges for state regulators today the large load demands
ok congresswoman i would agree
awesome thank you for that and thank you for all the work that state regulators are doing through large load tariffs to address some of those issues uh in our last hearing on transmission policy every single panelist regardless of party agreed that americans should not be burdened with costs from energy infrastructure that they don't cause Uh, there's a term, beneficiaries' pay. We've heard it today. It's widely used. Uh, Tony, could you talk a little bit how a loose definition of a term like that, that encompasses both congestion relief and broad policy goals, uh, could be forcing family families to subsidize projects that they neither use nor need?
Sure, Congressman, thank you for the question, and I'd be remiss if I didn't acknowledge you're a former president of NAICR so thank you for the service to uh, our association as well. Um, the having too loose a definition of what a beneficiary is can cause problems because y- consultants can get studies to say a lot of things, right? And what - what regulators try to do, the - the - it's a bedrock principle that cost causers should be cost payers, but if that definition is too loose, it can encourage project developers to Um, sort of avoid the trickier question which I've talked about through the course of this which is what is this investment compared to something else and that's really the key question that that state regulators are especially focused on, is what is that alternative comparison that you could have invested in that might have caused rates to go down. But once you build a project um, based on perhaps a top-down planning mandate, once you build that project, it can basically make other investments that would have been a better investment uninvestable because you've sunk cost into a huge fixed cost
Right.
network that has to be recovered from captive rate payers.
Thank you. I wanna just close a loop here closely uh quickly back to you, Mister Christie. I've been talking a lot about cost causers driving the need rather than beneficiaries. Could you speak to that and how that would uh help ensure the costs are properly allocated to the drivers not the beneficiaries?
Right, the the the benefits can be grossly inflated in the The Independent Market Monitor, MISO, said their latest tranche, the benefits were grossly inflated, and he critiqued it on that basis, which means you're gonna get cost allocations spread across people who didn't cause the cost. Equal focus needs to be on the causation of the cost as well as some uh made up benefits, which is what the IMM said was happening in MISO.
Thank you, sir. I'm over my time. I yield back.
The the the KLA's time has expired and yields back.
I would love to work with the rest of you on some of your comments, so.
The chair now recognizes the gentleman from Pennsylvania's thirteenth district. five minutes for questions.
Thank you, Mister Chairman, and thank you for holding this important hearing, and for our witnesses for participating here today. My home state of the Commonwealth of Pennsylvania is a home to vast energy resources, and to strong generation assets. And because of this, we often see large-scale transmission projects proposed to move that electricity either elsewhere within the Commonwealth of Pennsylvania or to address the demand of adjacent neighbors. At the federal level, I have worked on legislation that would ease bureaucratic red tape to help with the timely permitting and completion of all types of critical energies, infrastructure projects. We've all seen energy demands rise. My top priority remains that these projects and those who regulate them are responsive to the needs and the concerns of those who will ultimately live with the effects and with the costs of this new infrastructure. Mister Christie, thank you for being here. With your personal experience both at FERC and at state public utility commissions, can you provide any additional examples of how as a state regulator you were able to respond to local concerns with a precision that would be impossible from a federal position?
Well, you do that all the time because if when you're doing an IRP proceeding, when you're looking at your your major utilities, our major utility in Virginia is Dominion, that's our largest utility. So you do an IRP proceeding, you're looking at what are their res- what are their generating resources that they have coming in the uh coming down the line, and what are the distribution costs that they have. You look at the whole thing and you look at what the transmission costs. So you can look at, on a on a real-time basis, what is going to be needed to serve the millions of people who are in Dominion's territory and and FERC FERC just doesn't do that. FERC doesn't do integrated resource planning. It has, but first of all, it's not its fault, it doesn't have the authority.
You talked about when the rubber hits the road, and I like that analogy because it's so important because at the state and then subsequently at the local levels, That is so important. Do you feel that you are empowered at the state level to make sure that the consumer, that my constituent, knows that that rubber hitting the road, that there is an advocate for them?
I think frankly, it it it if states that went into an RTO, if they unbundled their transmission, one of the problems is you gave up control of your transmission costs to FERC. And I think that was a mistake. I think states were better off if they had kept the transmission costs under state regulation. because that's a huge part of the bill. Uh, Congresswoman Fedorchak put the chart up showing how much transmission had gone up. Well, that's been under FERC control. So, I think it'd be better off under s- under state c- c- uh, regulation because, look, state regulators are the ones who have to b- to do the retail rates that people pay in their bills so state regulators are the ones who are the most sensitive to what actual costs are far more than FERC.
Mister Clark, do you have any additional examples of the sorts of details and precise changes that can be made by state regulators to benefit the local landowners and the local consumers.
Congressman, yes, thank you for the question. I had mentioned it just uh briefly in my opening statement, but having sat through these transmission hearings and citing transmission electric transmission is very different than a pipeline. With a pipeline, and I cited a lot of both, a pipeline it's thirty-six or forty-eight inches underground, it's sort of out of sight, out of mind. once it's cited a transmission line is very different. Um, it impacts the land in a very different way, so what state regulators are able to do and local officials who work on on these these permits, is ensure that when a project is built it's w- it it's done in such a way that the land owner can accept it, that it's put in a place on, say, farming operations where it makes the most sense for that farmer's uh uh land use. It's things like that that can be teased out in a forum that state commissions excel at doing that I worry would fall in the gaps if that.
Do you feel that landowners and their concerns often do fall in those aforementioned gaps that you just talk about?
I think moving those decisions to Washington DC would almost certainly ensure that there would be more of those gaps. I think their ability to access their local commission um is much greater than it is if it gets bounced to a federal uh siting process.
I think I agree with you that that local input is paramount. that that local control and responsiveness to the local landowner must be heard and must be acted on. We all share the same desire to see affordable and reliable energy available to support the local consumers and local industries. As we build out the necessary infrastructure, state regulators must hold protecting local consumers and local landowners as their number one priority. I again thank you for Testifying here today, Mr. Chairman, I yield back.
Thank you very much. The gentleman's time has expired and yields back. The chair now recognizes the gentleman from George's first district for five minutes for questions.
Thank you, Mr. Chairman, and thank all of you for being here. This is extremely important. We all know that when we talk about the need for energy, that we typically just feel uh our our focus on um generation of energy, but we've got to also understand how important it is that um it it it to be able to move it. If we can't do that, then it having all the energy in the world doesn't help us, and and we've gotta be able to move it. And one of the strengths of our energy system is that states can choose the transmission model that that works best for their region. And and in Georgia, we're very fortunate, where utilities like Southern Company operate largely outside of first jurisdictional RTOs. We've had success seeing economic growth and reliability. Mister Rickard I wanna ask you, we're hearing a lot about issues building infrastructure in this country, but my understanding is that Georgia Power is uh moving with speed to build energy infrastructure. Can you can you tell us how Georgia Power and Southern Company are able to quickly meet growing demand?
Yes sir, thank you for the question. It is really simply our vertically integrated holistic planning approach. Because we are coordinated, we have headlights into the future, we see needs both fuel generation and transmission well in advance, And because of our constructive state, regular environment, and the fact that we make prudent investments, they allow us to make those investments in a timely manner, so that we can maintain reliability and affordability.
I wanna remind everyone that Georgia for the past twelve years in a row has been the number one state in which to do business. One of the reasons for that is the availability of energy, and uh power, and the affordability of it. So, thank you for that. Thank you for your contribution to making us the number one state in which to do business. Other parts of the country are not as fortunate as Georgia. Um, we hear about stories about um transmission lines in energy projects that take years and years to permit and to build. And it's essential that we address those permitting delays with it with while we're making sure and ensuring that um states get the transmission's rights that are not impacted. Georgia doesn't experience some of the transmission permitting issues that are prevalent in other parts of the country. Mister Rickard, how do we ensure that
I really appreciate that question, because it also gives me another opportunity to circle back to a question I think I misunderstood from Representative Peters and that we evaluate all solutions. We evaluate inter-regional solutions. After we do our bottoms-up approach, are there better ways, are there better cost solutions for our customers? I think one way we can protect our customers and not uh and maybe even avoid the cost allocation conversation is to make sure that we're not prescribing outcomes, prescribing mandates that will result in uneconomic transmission. And I think that is one way we can do it. We're also though very open to further conversations about is there a better inter-regional transmission pol- uh process that we can work with this group on to find.
Great. Mister Christie, let me ask you whether we're whether we're deploying grid enhancing technologies or streamlining the interconnection cues, or even utilizing existing right of ways, what are the consensus items that Congress can act on immediately that could be included on a broader permitting package without getting derailed by the larger, jurisdictional and market structure fights?
Well, there the the term gets, which is the acronym you hear all the time, grid enhancing technologies covers a wide array of of technology, some of them work really well, some of them, some of them don't, some of them work some places, not other places. Important thing is the engineers ought to make the decision. The engineers ought to decide what, whether it's a a advanced conductoring, it works some places, it works others, it works better some places, and before you charge consumers for it, and this is my whole point, don't charge consumers until you know they're getting the value for the money. The the utilities are being urged and and required to consider gets. and they should be. You don't want a federal mandate that says you always have to use all gets in all places because it it from an engineering standpoint, it's not gonna work, but yet consumers are gonna get charged for it. So I think frankly you ought to let the utilities and their regulators handle that issue of of the use of grid enhancing technologies and let them figure out where it work let the engineers decide where it works and don't make consumers pay when it doesn't work.
And and this kind of goes back to what I was talking about earlier, one size fits all that we think that you know we just use the cookie cutter model.
Right. In this in this utility field, and I've been in it for twenty-two years, in this utility field, advance mandates, mandates that say you have to build X amount of transmission without any factual basis, mandates that say you have to use against without any any factual basis of individual situations, uh, mandatory renewable that says you have to use this kind of generation to the exclusion of other types. They don't work in the long run because you're ignoring the facts in the field in individual cases. That's what utility regulators do, is we look at the facts in individual cases, whether it's generation, transmission, distribution.
Uh, and I'm I'm sorry to interrupt,
OK.
but the gentleman's time has expired.
Well, well thank you all for being here, and we've got a great utility regulator by the way, who we appreciate being on this committee.
OK.
Well, thank you very much, the gentleman's time has expired and yields back. The chair now recognizes the gentlelady from Iowa.
Uh thank you Chairman Letta and uh Ranking Member Caster uh, she's here for uh holding this hearing and I thank our witnesses for being here. Uh demand is rising rapidly as we all know, and while we agree more transmission is needed, we lack agreement on how to evaluate it, value it, and talk about it. From Iowa's experience in MISO, and let me say that Iowa is a state that has any of the above when it comes to energy generation, um I've seen the strains of collaborative intra-regional and inter-regional planning. How different regions legitimately weigh cost and benefits in different ways. Across regions, stakeholders may describe the same benefits differently because they hold distinct local, state, and regional perspectives. Order nineteen twenty dash A starts the work of creating a shared language for those perspectives, but more clarity is needed so regions can compare benefits without erasing their differences. Uh, Mister Clark, you state that when transmission is truly needed in cost
Uh, so Congressman, Uh, so Congressman, thanks for the uh Congressman, thanks for the uh Congressman thanks for the uh the excellent thanks for the uh the excellent It's a little bit driven by state statute. Some states have uh need processes, some are just a permitting statute, which is just the physical infrastructure itself. And in some states like um uh the state of North Dakota, it depends on who the project developer is that brings the project, whether there's a need analysis and or a uh uh an environmental analysis. So a bit of it is driven by um by state statute. In the context of interstate lines, um it again uh depends on the region, getting back to this this issue of one size does not fit all. In the upper Midwest for example, in the MISO region where uh which serves much of of Iowa and the upper Midwest, um there's often a regional planning process that takes place. And what what I found as a State Commissioner from that region is when something went through a thorough and rigorous process, where a line was determined to be needed by multiple states and everyone benefited from it you didn't have issues of states unreasonably blocking lines so what it took was that sort of analysis that allowed the state regulator to be comfortable that this line while the beneficiaries might be a little different in different states everybody benefited from it if if you couldn't meet that standard that's when you started having some issues with getting lines sighted. But honestly, when you look across the country, states are doing, I think, a tremendous job of getting needed projects built. It's just you have to demonstrate that need in a record.
Thank you. Mister Christie, you described voting to approve controversial five hundred kilowatt lines after fully litigated proceedings with public hearings. What in your experience are the biggest points of contention in those proceedings? What gets litigated most heavily? And has the nature of those disputes changed over the last ten years?
Well, when you have a a a big line like that, and five hundred KV, seven sixty-five KV are big lines, they generally cover a lot of distance, fifty, a hundred, a hundred and fifty miles. So there's a lot of people impacted. You don't hide a transmission line like that. You can't put it underground. It it's gonna it's gonna dominate the built landscape for miles around. So of course people who don't have it in their view shed right now are not gonna wanna see a seven sixty five coming through. They're they're not uh they're not slightly. And so they're gonna be controversial, but you have to give the public the opportunity, which state regulators do, to come out and voice their opinions. And most of them are gonna be opposed. Again, I I every high school gym I went to with three or four hundred people, everyone was against the line. Nobody came out and said, " Yeah, we wanna build a something to mess up my my view." It's the nature of building that kind of an asset. People will ultimately, I believe, people will ultimately accept the intrusion on their landscape, even eminent domain where the property is actually seized, if they think that they had a fair shake in in voicing their opinion, and most importantly, that a state agency seriously did its due diligence, looked at the facts, and came out with a credible opinion, as we did in several controversial cases, that said, if we don't build this, we're gonna have brownouts, we're gonna have blackouts from from line overloads. And the public ultimately accepted that, even though they didn't want to look at a seven sixty five KV. I think that's the only way you get stuff built.
Yeah, we're facing some of those challenges in Iowa now, so I appreciate it. I also have some questions for the record I'd like to submit, uh, Mister Chair, and with that I yield.
Well, thank you very much. The general eh yields back. And seeing no other uh members wishing to ask questions, we wanna thank our witnesses for appearing before the subcommittee today. Members may have, and it sounds like will have, additional written questions for you, and I remind members that they have ten business days to submit additional questions for the record. I ask our wis- witnesses do their best to submit their response within ten business days upon receipt of those questions. I ask unanimous consent to insert in the record the documents included on the staff hearing documents list. Without objection, so ordered. And without objection, the subcommittee stands adjourned. Thank you very much.
Morning digest